John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June 2010 1.News from ILC Japan CFS review 1-3 June 2010 :

Slides:



Advertisements
Similar presentations
Linear Collider AD&I Update N. Walker, E. Paterson, V Kuchler, T. Lackowski, J. A. Osbourne,J. Clarke, A. Wolski, S. Guiducci, N. Solyak,… Norbert Collomb30/08/2009.
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Linear Collider Positron Source and Central Integration Update N. Walker, J. Clarke, E. Paterson, V Kuchler, J. A. Osbourne, T. Lackowski, A. Wolski, S.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Construction and Installation of the CLIC Experimental Area
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
October 27, DESY TBR Central Region Integration Issues 1 Mark Palmer Cornell University.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Beam Physics Work D.S List of Workpackages Area packages Main beam electron source (Steffen Doebert) Main beam positron source (Steffen.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Agenda : CLIC Civil Engineering and Services (CES) WG.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
DR Layout Description ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
Survey Meeting John Osborne, CERN 8 February 2016
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Civil Engineering for FCC-eh and LHeC
CLIC Civil Engineering Update
CLIC Civil Engineering Update
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
CLIC Civil Engineering & Infrastructure
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
FCC-ee MDI Civil Engineering update
ILC DRAFT CONSTRUCTION SCHEDULE Flat topography & Mountainous sites
Civil Engineering for FCC-eh IR
COOLING & VENTILATION INFRASTRUCTURE
CLIC Civil Engineering Update
ILC CFS AD&I Daresbury Lab Summary
Linear Collider Positron Source and Central Integration Update
Central Region Working Group
Presentation transcript:

John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 : 2.News from CTC 18 May 2010 on CLIC tunnel cross section 3.CDR Authors for CES studies

John Osborne : GS-SEM Civil Engineering 18 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 18 May 2010 CES studies for CDR : 1. Tunnel cross section 2. Injection Complex 3. BDS Layout 4.Experimental Area Layout 5.Summary

John Osborne : GS-SEM Civil Engineering 18 May Tunnel cross section

John Osborne : GS-SEM Civil Engineering 18 May m tunnel for CDR as agreed in 2009

John Osborne : GS-SEM Civil Engineering 18 May Drawbacks with 4.5m tunnel identified in 2009 Positioning of electronic racks not ideal Solution : Re-position onto tunnel floor, but possibly means deleting safety barrier Difficult to access ‘tunnel wall’ side of modules Solution : remove entire module for access ? Access to Drive Beam dumps Solution : Local Tunnel enlargement to allow ‘ladder’ access (see next slides) Impact from vibration from floor embedded pipes Solution : Further studies in TD Phase Reduced space due to transversal ventilation and perhaps not sufficient cooling power Solution : Study longitudinal ventilation system during TD Phase No space for vehicle powering ‘monorail’ and integration conflict Inductive powering for vehicle ?

John Osborne : GS-SEM Civil Engineering 18 May 2009 Revised 4.5m cross section

John Osborne : GS-SEM Civil Engineering 18 May 2009 Access to Drive beam dump

John Osborne : GS-SEM Civil Engineering 18 May 2009

John Osborne : GS-SEM Civil Engineering 18 May 2009 Access to LHC Dumps at Point 6

John Osborne : GS-SEM Civil Engineering 18 May 2009 Cross section for ILC Europe (CERN) 5.2m diameter for Kly-Cluster

John Osborne : GS-SEM Civil Engineering 18 May 2009 Possible 5.2m cross section for CLIC

John Osborne : GS-SEM Civil Engineering 18 May 2009 ‘Metro standard’ 5.6m tunnel +150MCHF : Proposed at CTC May 2009

John Osborne : GS-SEM Civil Engineering 18 May Injection Complex : Input mainly from : L.Rinolfi B.Jeanneret F.Stulle

John Osborne : GS-SEM Civil Engineering 18 May Injection Complex 2009 Layout

John Osborne : GS-SEM Civil Engineering 18 May Injection Complex 2010 Layout 1.1km extra tunnel for turnarounds 500m extra for CR, DR Injection cut and cover tunnels lengths increased to 1.4km (from 1km) ‘turnaround’ is now a horizontal cut/cover design

John Osborne : GS-SEM Civil Engineering 18 May 2009 ‘Spiral descents’ removed

John Osborne : GS-SEM Civil Engineering 18 May Surface tunnels / halls for Injection Complex 2010 Layout : Surface buildings added

John Osborne : GS-SEM Civil Engineering 18 May 2009 CLIC Damping Rings schematic layout e + Damping Ring e - Damping Ring e - Pre-damping Ring e + Pre-damping Ring e + linac to PDR transfer line e - linac to PDR transfer line e + PDR to DR transfer line e + DR to Booster linac transfer line e - PDR to DR transfer line e - DR to Booster linac transfer line 205 m 80 m Dump 157 m 64 m Damping rings still to be finalised

John Osborne : GS-SEM Civil Engineering 18 May 2009 ON - HOLD

John Osborne : GS-SEM Civil Engineering 18 May BDS Layout Input mainly from : Rogelio Tomas Garcia Edda Gschwendtner

John Osborne : GS-SEM Civil Engineering 18 May 2009 Main Beam Dumps

John Osborne : GS-SEM Civil Engineering 18 May 2009 Tune-Up Dumps added

John Osborne : GS-SEM Civil Engineering 18 May Experimental Area Layout

John Osborne : GS-SEM Civil Engineering 18 May 2009 CLIC Detector hall layout developed by : A.Gaddi H.Gerwig A.Herve CES will now use this as starting point for CE & services design, including cost estimates

John Osborne : GS-SEM Civil Engineering 18 May 2009 Machine By-Pass added Survey gallery added Emergency escape tunnel Better to delete cavern ‘technical alcoves’ Gantry crane capacities to be determined CV being consulted about requirements

John Osborne : GS-SEM Civil Engineering 18 May 2009 ILC 3d models developed at CERN using CATIA : CLIC models to follow once draughtsman is identified

John Osborne : GS-SEM Civil Engineering 18 May 2009 ILC Project general view of IR

John Osborne : GS-SEM Civil Engineering 18 May 2009 ILC Project 3d general view Concerns half of the project (circled area) Diameter (m)Length (m) Experimental Cavern Interface Tunnel Main Dump Branch Tunnel Damping Ring Branch Tunnel * PTRAN & BDS Diag. Dump Tunnel BDS Diag. Dump Branch Tunnel MeV accelerator Tunnel Positron Production Tunnel & Remote Handling Cavern e- BDS Dogleg Tunnel Undulator & Fast Abort Dump Tunnel & Undulator Access Cavern End ML – Start Positron Tunnel Damping Ring Transfer Tunnel Damping Ring Junction Cavern Cavern number 3 can be reduced in length due to deletion of photon pipe

John Osborne : GS-SEM Civil Engineering 18 May 2009 Very hectic area ! 3 ∅ x 145m e- RTML Positron Transfer Dump Can be shortened due to deletion of Photon pipe Positron Main Dump Electron BDS PLTR Spin Rotation e+ Energy Compression ILC Junction cavern

John Osborne : GS-SEM Civil Engineering 18 May 2009 Overall layout updated (full symmetry)

John Osborne : GS-SEM Civil Engineering 18 May Summary Will continue to try and ‘freeze’ CE layouts at monthly CES meeting. Next major issue is amount of space required for Power Converters. Martin Gastal is gathering input from other technical services for experimental hall (CV,EL etc) Costing for CDR required for all technical infrastructure by September with assistance from Amberg consultants (same CE consultants for ILC) Draft layout for CDR Chapter ‘Civil Engineering and Services’ has been submitted to Hermann Next CTC 22 June specifically about tunnel cross section (4.5m,5.2m or 5.6m)

John Osborne : GS-SEM Civil Engineering 18 May m first DRAFT

John Osborne : GS-SEM Civil Engineering 18 May 2009 CES authors for CDR : refer to mail from H.Schmickler 31 May 2010