1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.

Slides:



Advertisements
Similar presentations
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
Advertisements

Raine Cotton  Registered DG settlement is in accordance with Protocol Section as Real-Time Energy Imbalance at a Load.
TPTF Presentation Registration of PUN Facilities December 19, 2007.
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
NERC LTRA Update / CDR Capacity Counting Issues
1 Price Elasticity of Demand in Current Zonal Market PUCT Demand Response Workshop (Project No ) Jay Zarnikau Frontier Associates January 2007.
October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.
COPS Update to TAC January 6, Voting Items Three voting items: COPMGRR015, Creating Section 8, ERCOT Settlement and Invoice Process 2. 2.
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
Retail Competition: Managing a Difficult Transition David L. O’Connor Commissioner Massachusetts Division of Energy Resources (DOER) Presentation to National.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
Effect of generation loss and Frequency Response Characteristics (FRC) on tie-line flow to Southern Region under various scenarios and Target setting for.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Kirk Schneider American Electric Power Tulsa, Oklahoma AEIC Annual Load Research Conference Reno, Nevada September 10-13, 2006 System Load Calculation.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
ERCOT MARKET EDUCATION
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
COMMERCIAL OPERATIONS ORGANIZATION Betty Day Director, Commercial Operations (office) (cell) (fax)
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
Date 05/01/2012 MIT Manual TEC Analysis Sandip Sharma ERCOT.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
1 Knowing Your Customers Better Through Load Research Presented By: Lawrence M. Strawn Senior Retail Pricing Coordinator Orlando Utilities Commission September.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Retail Metering Working Group Progress Report 04/15/09.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Retail Market Subcommittee Visibility into OGRR219.
ERCOT MARKET EDUCATION Retail 101. Smart Meter Technology.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013 Mandy Bauld ERCOT Director, Settlement & Retail Operations (512)
PDCWG 8/25/2015 GTBD Bias Analysis ERCOT Market Analysis and Design PDCWG August 25, 2015.
Distributed Generation Registration June 30, 2008.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
ERCOT MARKET EDUCATION Retail 101. Advanced Meter Technology.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
Developing Load Reduction Estimates Caused by Interrupting and/or Curtailing Large Customers By Carl L. Raish 2000 AEIC Load Research Conference.
QSE Managers Working Group November 7 th 2011 NPRR 334 – Additional Analysis.
Commercial Operations Subcommittee Meeting April 13, 2010 Update to RMS April 14, 2010.
October 13, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements Task.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
1 Commercial Operations Sub-Committee Update to RMS November 10, 2005.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Current FRRS Language & Explanation of Posted Data
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Settlement Timeline Workshop
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Grid Integration of Intermittent Resources
Manual Time Error Correction Discussion
Advanced Metering Infrastructure Smart Meters
Presentation transcript:

1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements

2 Presentation MITNovember 14, 2011 Background NERC Operating Committee (OC) directed the Resources Subcommittee (RS) to develop a field trial to eliminate manual Time Error Corrections What is Time Error? –Difference between NIST time and a clock driven by frequency If average frequency is 60Hz, Time Error will be zero If frequency is 0.01Hz high (low), a clock will gain (lose) 0.6 seconds an hour What are Manual Time Error Corrections ? –Minor coordinated adjustments to frequency –One Reliability Coordinator in each Interconnection is designated “Time Monitor” –ERCOT Nodal Operating Guide Section deals with time error When time error is equal to or greater than ±3 seconds, ERCOT may initiate a time correction Correction may end when error is less than ±0.5 seconds or when system events mandate termination Time correction may be postponed if it is determined that load patterns in immediate future will result in desired time correction

3 Presentation MITNovember 14, 2011 Impact of Elimination of Time Error Correction on Wholesale Settlements Assume that ERCOT Polled Settlement (EPS) meters will be synchronized with NIST clock Potential effect on wholesale settlements is analyzed for following: –Flat load –Price responsive load and/or demand responsive load Different MW load connected to the IDR meter-100 to 1150 MW Different delays (lag and lead)- 15 sec, 30 sec and 45 sec Different price levels- $200 to $3000 /MWH –Aggregate IDR load in grid Maximum allowed time error according to ERCOT Nodal Protocol 10: Metering –For TDSP meters: ±5% of settlement interval (15 min) or 45 sec of NIST clock –For EPS meters : ±1% of settlement interval (15 min) or 9 sec of NIST clock –ERCOT production servers are maintained within ±1 sec of NIST clock Wholesale price calculations synchronized within ±1 sec of NIST clock for each settlement interval No analysis conducted for retail settlements –Results contingent on contracts and specific load characteristics

4 Presentation MITNovember 14, Delayed IDR Clock - NIST Clock Interval 1Interval 2Interval 3Interval 4Interval 5 30 sec delay 16:45:0016:30: MW $35/ MWH 0 MW 37.5 MWH36.25 MWH0 MWH1.25 MWH37.5 MWH 16:15:0016:00:00 $1000/ MWH Price/Demand Responsive Load IDR slower than NIST clock by 30 sec, 150 MW load

5 Presentation MITNovember 14, 2011 Price/Demand Responsive Load Excel Worksheet for Calculation Fill in the following values: 1. Load (MWH) 2. Time deviation (sec) 3. Price ($/MWH )in each interval

6 Presentation MITNovember 14, 2011 Price/Demand Responsive Load IDR slower than NIST clock by 30 sec, 150 MW load MWH in Interval Price in Interval ($/MWH) Total Price in Interval ($) Expected MWH (w/o clock lag) Actual MWH (with clock lag) Expected Price (w/o clock lag) Actual Price (with clock lag) Interval $35$1,312.5 Interval $35$1,312.5$1, Interval 3 00$1000$0 Interval $1000$0$1, Interval $35$1,312.5 Total Price $3,937.50$5, Net Loss $1,206.25

7 Presentation MITNovember 14, 2011 Price/Demand Responsive Load Effect of Time Delay at Different Load Levels Price in Interval 4: $1000/MWH Price in Interval 2: $35/MWH Note: Net losses calculated over entire 5 interval event

8 Presentation MITNovember 14, 2011 Price/Demand Responsive Load Effect of Time Delay at Different Price Levels Price in Interval 4: $200/MWHPrice in Interval 4: $500/MWH Price in Interval 4: $1000/MWHPrice in Interval 4: $3000/MWH Note: Net losses calculated over entire 5 interval event

9 Presentation MITNovember 14, Accelerated IDR Clock - NIST Clock Interval 1Interval 2Interval 3Interval 4Interval 5 30 sec delay 16:45:0016:30: MW $35/ MWH 0 MW 37.5 MWH MWH0 MWH 1.25 MWH 37.5 MWH 16:15:0016:00:00 $1000/ MWH Price/Demand Responsive Load IDR faster than NIST clock by 30 sec, 150 MW load Losses and savings intervals interchanged Values remain same

10 Presentation MITNovember 14, Delayed IDR Clock - NIST Clock Interval 1Interval 2Interval 3 30 sec delay 10,000 MWH Aggregate IDR Load IDR slower than NIST clock by 30 sec 10,200 MWH 10,400 MWH Energy Recorded by IDR In Interval 2 = Energy Consumed in Interval 2 + Metered Energy Shifted from Interval 3 to 2 - Metered Energy Shifted from Interval 2 to 1 Note: IDR accounts for 70% of total grid load 10, MWH = 10, MWH MWH – MWH

11 Presentation MITNovember 14, Accelerated IDR Clock - NIST Clock Interval 1Interval 2Interval 3 30 sec delay 10,000 MWH Aggregate IDR Load IDR faster than NIST clock by 30 sec 10,200 MWH 10,400 MWH Energy Recorded by IDR In Interval 2 = Energy Consumed in Interval 2 + Metered Energy Shifted from Interval 1 to 2 - Metered Energy Shifted from Interval 2 to 3 Note: IDR accounts for 70% of total grid load 10, MWH = 10, MWH MWH – MWH

12 Presentation MITNovember 14, 2011 Aggregate IDR Load Example: June 09, 2011 IDR slower than NIST clock by 30 sec Average Shift in Interval Load Due to IDR Delay: % Average UFE: %

13 Presentation MITNovember 14, 2011 Aggregate IDR Load Example: April 21, 2011 IDR slower than NIST clock by 30 sec Average Shift in Interval Load Due to IDR Delay: % Average UFE: %

14 Presentation MITNovember 14, 2011 Aggregate IDR Load Example: Dec 21, 2010 IDR slower than NIST clock by 30 sec Average Shift in Interval Load Due to IDR Delay: % Average UFE: %

15 Presentation MITNovember 14, 2011 Aggregate IDR Load Example: Jul 8, 2011 IDR slower than NIST clock by 30 sec Average Shift in Interval Load Due to IDR Delay: % Average UFE: %

16 Presentation MITNovember 14, 2011 Aggregate IDR Load Example: Feb 2, 2011 IDR slower than NIST clock by 30 sec Average Shift in Interval Load Due to IDR Delay: % Average UFE: %

17 Presentation MITNovember 14, 2011 Summary Observations of this study are as follows: –Flat load No Impact –Price/demand responsive load Potential impact. Will depend on site operating procedures and load characteristics IDR clock error combined with variations in price of electricity will result in savings in one interval, with losses in other –Aggregate IDR load Meter clock error up to 45 seconds has minimal impact on aggregate IDR load used in wholesale settlements IDR clock error combined with variations in price of electricity will result in savings in one interval, with losses in other Note: Study of impact of elimination of time error correction on retail settlements or an individual market participant has not been performed. Each individual party should carry out their own study based on their specific load characteristics

18 Presentation RMSAug 17, 2011 Questions?