Operational and Postimplementation

Slides:



Advertisements
Similar presentations
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall
Advertisements

PROGRAM AND PROJECT MANAGEMENT
Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall B.1.
Chapter Two Gathering Information Copyright © 2012 Pearson Education, Inc. Publishing as Prentice HallChapter2.1.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Global Supply Chain Quality and International Quality Standards.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Chapter 4 Strategic Quality Planning.
Chapter © 2009 Pearson Education, Inc. Publishing as Prentice Hall.
Managing Quality Chapter 5.
Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall Process Specifications and Structured Decisions Systems Analysis and Design, 8e Kendall.
6.1 Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Building Information Systems Chapter 13 VIDEO CASES Video Case 1: IBM: Business.
ORGANIZATIONAL CHANGE AND BUSINESS PROCESS RE-ENGINEERING
chapter 14 International Organizational Design and Control
Managing Supplier Quality
Chapter One Customer Focus and Managing Customer Loyalty
Chapter 6 The Voice of the Market.
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 15 Implementing and Validating the Quality System.
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 12 Statistically-Based Quality Improvement for Attributes.
Developing Products and Services
SOFTWARE AND VENDOR SELECTION
Chapter © 2009 Pearson Education, Inc. Publishing as Prentice Hall.
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 6 The Voice of the Market.
Release & Deployment ITIL Version 3
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 1.1.
Copyright ©2012 Pearson Education, Inc. publishing as Prentice Hall Training the Workforce 8-1 Chapter 8.
Computers Are Your Future Tenth Edition Chapter 10: Careers & Certification Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall1.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
Computers Are Your Future Eleventh Edition Chapter 13: Systems Analysis & Design Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall1.
SOFTWARE AND VENDOR SELECTION
C HAPTER Social Networking Using LinkedIn 5 Copyright © 2014 Pearson Education, Inc. Publishing as Prentice Hall.
Chapter 7 Enterprise Systems.
Chapter © 2009 Pearson Education, Inc. Publishing as Prentice Hall.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Chapter © 2009 Pearson Education, Inc. Publishing as Prentice Hall.
Chapter 3 Appendix Object-Oriented Analysis and Design: Project Management Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
GO! with Office 2013 Volume 1 By: Shelley Gaskin, Alicia Vargas, and Carolyn McLellan Access Chapter 3 Forms, Filters, and Reports.
GO! All In One 2/E By: Shelley Gaskin, Nancy Graviett, Debra Geoghan Chapter 13 Creating and Editing Presentations with Microsoft PowerPoint 2013 Copyright.
Chapter Thirteen Defensive Strategies. Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall13-2 Defensive Strategies Defensive strategic.
Computers Are Your Future Tenth Edition Chapter 13: Systems Analysis & Design Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall1.
Chapter Six Competitor Analysis and Sources of Advantage.
© 2012 Pearson Education, Inc. publishing Prentice Hall. Chapter 2 Situation Assessment: The External Environment.
© 2012 Pearson Education, Inc. publishing Prentice Hall. Note 7 Company Assessment— The Value Chain.
Integrating Word, Excel,
Skills for Success with Microsoft Office 2013 Volume 1 Copyright © 2014 Pearson Education, Inc. Publishing as Prentice Hall. by Kris Townsend, Catherine.
Chapter Five Market Segmentation and Segmentation Strategies.
© 2012 Pearson Education, Inc. publishing Prentice Hall. Note 9 The Product Life Cycle.
Completing the Tests in the Sales and Collection Cycle:
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Performance Management, Appraisals, and Careers.
© 2012 Pearson Education, Inc. publishing Prentice Hall. Note 18 Generic Strategies—The Value Map.
© 2012 Pearson Education, Inc. publishing Prentice Hall. Note 16 What is a Marketing Strategy?
Chapter Fourteen Building a Marketing Plan. Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall14-2 Building a Marketing Plan Creativity.
GO! with Office 2013 Volume 1 By: Shelley Gaskin, Alicia Vargas, and Carolyn McLellan Word Chapter 2 Using Tables and Templates to Create Resumes and Cover.
GO! with Office 2013 Volume 1 By: Shelley Gaskin, Alicia Vargas, and Carolyn McLellan PowerPoint Chapter 3 Enhancing a Presentation with Animation, Video,
Computers Are Your Future Tenth Edition Spotlight 5: Microsoft Office Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall1.
Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall Process Specifications and Structured Decisions Systems Analysis and Design, 8e Kendall.
Core Competencies Training for Supervisors
Core Competencies Training for Supervisors
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall
INTEGRATING THE SUPPLY CHAIN TO REAP THE REWARDS
Chapter 3 Managing the Information Systems Project
Operational and Postimplementation
Managing Supplier Quality
Chapter 2 The Sources of Software
PT2520 Unit 2: Gather Information and Define Requirements
Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall.
SOFTWARE AND VENDOR SELECTION
Presentation transcript:

Operational and Postimplementation CHAPTER 7 Operational and Postimplementation Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall Learning Objectives Describe all the components to a successful “Go-live” and how to determine their readiness. Understand what is involved in stabilizing the system after “Go-live” and how to track and address problems and issues on a daily basis. Value the transition from developing a system to supporting it in a production environment. Understand the process of transferring knowledge to operational staff and the importance to the long-term system success. Realize the value of training before and after “Go-live.” Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall Preview In assessing an ERP project’s readiness for Go–live, planned tasks and activities must be completed to allow project management to address any outstanding issues that may jeopardize the Go-live date. Readiness process needs to include as many team members, appropriate users, and managers as possible. Much of the success of an implementation lies with the stabilization and post-production support processes. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall Preview (Cont’d) All resources should be focused on ensuring users understand how to use the system and that issues and problems are resolved as quickly as possible. Continual monitoring of implementation issues will provide a basis for moving from stabilization to postproduction support. Training also gears up during the readiness process and continues through stabilization and post-production support. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Figure 7-1 Sample Project Methodology Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall Go-Live Readiness An elaborate readiness checkpoint should be in place for Go-live to make sure steps are not missed. Infrastructure, development, configuration, conversion, testing, training, communications, operations, command central, reporting, and users must be assessed in the readiness process. Readiness reviews need to be documented and communicated to the project team and the company. A detailed report needs to be available, along with an executive summary for senior management. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Go-Live Readiness (Cont’d) The Go-Live Readiness Review and Status Report is often a table that shows the status of each area at a glance, with the key activities that need to be completed agreed to before going live. The process for determining readiness consists of a series of meetings and discussions on the status of each area’s tasks and activities. If the PMO sees a lot of RED items the first time through, it will help to focus the project teams on what needs to be accomplished in the time period between the assessment and Go-live . Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall ERP Training Training must be provided to everyone that will be using the system, and should use real data and examples. If done correctly training will capture about 90 percent of what users will see on a daily basis. ERP training personnel could include trainers who work for the software vendor, third-party trainers that have specific experience in ERP systems. Developing a variety of ways to train will better ensure the effectiveness of training. Training needs to be endorsed by senior management early to ensure adequate funding. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall Stabilization The stabilization process begins when the ERP system software is in production, initial training is complete, and conversion of critical data is done. After the ERP system goes live, the organization will need to shift to stabilization process—60 to 90 days. IT staff will be monitoring the infrastructure for response times and ensure that back-ups are taken appropriately. Subject matter experts should be prepared to help many users from their departments operate the system in the correct way. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Issues Arising During Stabilization Customizations add to the complexity if not documented and communicated well. Not being able to perform ad hoc activities, not because the system is unable, but more about learning how to accomplish the activity. Users make mistakes as they use the new process for the first time. In a parallel implementation approach, the ERP system is operated concurrently with the old legacy system, which is labor-intensive, confusing, and frustrating. Reconciliation has to be done between the new ERP system and the old legacy system to validate the inputs and outputs. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Postproduction Support Managing the daily system operations and ensuring that the system is doing what it needs to do is really the purpose of post-production support. If the post-production process is inadequate, then the implementation may be considered a failure. Many of the risks associated with cutting over to the new ERP can be reduced by appropriate pre–Go-live and end-user training. Subject matter experts and core project team members should be used to provide general support to answer simple process and system questions. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Figure 7-2 Product Life Cycle Chart Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Postimplementation Support Postimplementation support is generally divided into the following points: Training Go-Live Support Data Validation Data Correction Patched and Fixes New Features By clearly defining and communicating Go-live and the ongoing support processes, overall expectations will be better set to realize measurable business benefits and ROI from the ERP project. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall Knowledge Transfer There must be a well-defined process in place to transfer knowledge and skill to new or existing staff or team members during and after the implementation process. Project monitoring and tracking, collaboration and communication, subject matter expertise, and lesson- learned repository should be documented. A knowledge management plan should be in place to monitor the transition from one phase of the implementation to the other, which enables a smooth transfer of knowledge. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Knowledge Transfer (Cont’d) A knowledge management plan will: Ensure knowledge is retained. Reduce the cost of support due to lower number of support calls. Facilitate faster learning. Better maximize the capabilities of the system. Cut time in troubleshooting problems. Ensure a correct use of the system. One centralized data repository can then be used to store documents which will eliminate confusion, duplication, and losing data. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Implications for Management The closer an ERP implementation gets to its Go-live date the more project management must focus on the issues, tasks, and activities to identify the issues and help focus resources and efforts. To ensure a successful and sustainable ERP implementation, there must be a well thought-out and understood knowledge transfer process when consultants, implementation partner staff, full-time and part-time staff, and even end-users leave. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall Summary Assessing readiness in an ERP implementation is critical to the overall implementation process. Without the readiness process in place, it will be difficult to meet the Go-live date with any assurance. For the readiness process, project managers need to focus on the high-priority tasks and activities and identify where workarounds are possible. Just-in-time and continual training is the mark of a good ERP implementation training plan. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall Summary (Cont’d) Stabilization is generally a 60 to 90 day period of time that takes place after Go-live depending on the number of issues that arise. Post production support helps the production staff, users, and information technology staff to know what to expect daily, weekly, monthly, and yearly from the system. A roll-on and roll-off process for consultants and staff is needed to ensure the long-term system sustainability in the Knowledge Transfer process. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall Review Questions Why is the readiness process so important to an ERP implementation? What project areas need to be assessed in a readiness process? What is included (and not included) during the stabilization timeframe? Why is the knowledge transfer important to the long- term stability of the ERP system? What are the five areas addressed in postproduction support? Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. Printed in the United States of America. Copyright © 2012 Pearson Education, Inc.   Publishing as Prentice Hall Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall