1 Front End – present status David Neuffer March 3, 2015.

Slides:



Advertisements
Similar presentations
1 Front End rf and Gas Cavities David Neuffer Fermilab f October 2011.
Advertisements

IIT NFMCC Meeting ‘06 Recent Optimization Studies of Adiabatic Buncher and Phase Rotator A.Poklonskiy (SPbSU, MSU), D.Neuffer (FNAL) C.Johnstone (FNAL),
1 Neutrino Factory Front End (IDS) -Chicane & Absorber David Neuffer C. Rogers, P. Snopok, C. Yoshikawa, … January 31, 2012.
Bunched-Beam Phase Rotation David Neuffer Fermilab.
Magnetic Configuration of the Muon Collider/ Neutrino Factory Target System Hisham Kamal Sayed, *1 H.G Kirk, 1 K.T. McDonald 2 1 Brookhaven National Laboratory,
1 Optimization of baseline front end for a neutrino factory David Neuffer FNAL (August 19, 2009)
1 Neutrino Factory Front End (IDS) and Variations David Neuffer G. Prior, C. Rogers, P. Snopok, C. Yoshikawa, … August 2011 NuFACT99 -Lyon.
Muon Colliders ‘ December 2004 Optimization of adiabatic buncher and phase rotator for Muon Accelerators A.Poklonskiy (SPbSU, MSU), D.Neuffer (FNAL)
Bunched-Beam Phase Rotation- Variation and 0ptimization David Neuffer, A. Poklonskiy Fermilab.
Taylor Models Workhop 20 December 2004 Exploring and optimizing Adiabatic Buncher and Phase Rotator for Neutrino Factory in COSY Infinity A.Poklonskiy.
1 Muon Bunching for a Muon Collider David Neuffer FNAL August 3, 2010.
RF Bucket Area Introduction Intense muon beams have many potential applications, including neutrino factories and muon colliders. However, muons are produced.
1 RAL + Front End Studies International Design Study David Neuffer FNAL (January 5, 2009)
1 Front End Studies and Plans David Neuffer FNAL (November 10, 2009)
1 Front End Studies and Plans David Neuffer FNAL (October 27, 2009)
1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.
Μ-Capture, Energy Rotation, Cooling and High-pressure Cavities David Neuffer Fermilab.
1 Muon Yield Comparisons for Different ICOOL Versions and Lattices X. Ding Front End, Nov. 23, 2010.
1 Energy-Phase Rotation with a proton absorber David Neuffer September 27, 2011.
Simulation Study Results Study: Replace LiH-based cooler with gas-filled transport and rf cavities Results: Beam Cooling is significantly improved. Final.
NF Front End Meeting, April 27, 2010 Initial Cooling with HFOFO Snake Y. Alexahin, FNAL APC.
1 Neutrino Factory Front End (IDS) and Variations David Neuffer November 23, 2010.
Muons, Inc. 4.27/2010IDS Front End Meeting Cary Y. Yoshikawa 1 Status of the Quasi-Isochronous Helical Channel Cary Yoshikawa Chuck Ankenbrandt Rol Johnson.
Operated by Brookhaven Science Associates for the U.S. Department of Energy Optimized Parameters for a Mercury Jet Target X. Ding, D. Cline, UCLA, Los.
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
-Factory Front End Phase Rotation Optimization David Neuffer Fermilab Muons, Inc.
Helical Cooling Channel Simulation with ICOOL and G4BL K. Yonehara Muon collider meeting, Miami Dec. 13, 2004 Slide 1.
FFAG Concepts and Studies David Neuffer Fermilab.
1 Front End Capture/Phase Rotation & Cooling Studies David Neuffer Cary Yoshikawa December 2008.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Muons within Acceleration Acceptance Cuts at End of Transverse Cooling Channel TOWARDS A GLOBAL OPTIMIZATION OF THE MUON ACCELERATOR FRONT END H. K. Sayed,
1 Front End – present status David Neuffer March 31, 2015.
Tracking Studies of Phase Rotation Using a Scaling FFAG Ajit Kurup FFAG07 12 th – 17 th April 2007.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer Fermilab.
Bunched-Beam Phase Rotation and FFAG -Factory Injection David Neuffer Fermilab.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer, Andreas Van Ginneken, Daniel Elvira Fermilab.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
K. McDonald NFMCC Collaboration Meeting Jan 14, The Capture Solenoid as an Emittance-Reducing Element K. McDonald Princeton U. (Jan. 14, 2010)
Status of Scaling FFAG Phase Rotation ICOOL Simulations Ajit Kurup ISS Machine Group Meeting 27 th July 2006.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
1 The 325 MHz Solution David Neuffer Fermilab January 15, 2013.
1 Front End for MAP Neutrino Factory/Collider rf considerations David Neuffer May 29, 2014.
Harold G. Kirk Brookhaven National Laboratory Progress in Quad Ring Coolers Ring Cooler Workshop UCLA March 7-8, 2002.
1 Front End – present status David Neuffer March 17, 2015.
1 International Design Study Front End & Variations David Neuffer January 2009.
FRONTEND DESIGN & OPTIMIZATION STUDIES HISHAM KAMAL SAYED BROOKHAVEN NATIONAL LABORATORY June 26, 2014 Collaboration: J. S. Berg - X. Ding - V.B. Graves.
NuFACT06 Summer School -Factory Front End and Cooling David Neuffer f Fermilab.
Fermilab and Muons Proton Driver (for ν-Factory, μ + -μ - Collider, …) David Neuffer Fermilab.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
FFAG Acceleration David Neuffer Fermilab FFAG Workshop ‘03.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
1 Muon Capture for a Muon Collider David Neuffer July 2009.
1 Alternative options for beam cooling for a muon accelerator front-end Diktys Stratakis Physics Department Brookhaven National Laboratory Front-End Phone.
Bunched-Beam Phase Rotation - Ring Coolers? - FFAGs? David Neuffer Fermilab.
Adiabatic buncher and (  ) Rotator Exploration & Optimization David Neuffer(FNAL), Alexey Poklonskiy (FNAL, MSU, SPSU)
Pros and Cons of Existing Cooling Schemes David Neuffer Fermilab.
1 Front End – gas-filled cavities David Neuffer May 19, 2015.
1 Bunch Recombiner for a μ + μ - Collider Cooling Scenario David Neuffer FNAL (July 7, 2010)
Muons, Inc. 3/5/2012MAP Collab. Meeting at SLAC Cary Y. Yoshikawa 1 Bunch Coalescing in a Helical Channel* Cary Yoshikawa Chuck Ankenbrandt Dave Neuffer.
1 Front End – present status David Neuffer December 4, 2014.
Research and development toward a future Muon Collider Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of Muon Accelerator Program Draft.
+-- Collider Front end- Balbekov version
X. Ding, UCLA MAP Spring 2014 Meeting May 2014 Fermilab
David Neuffer Cary Yoshikawa March 2009
The Accelerator Complex from the International Design Study
Muon Front End Status Chris Rogers,
Meson Production Efficiencies
Presentation transcript:

1 Front End – present status David Neuffer March 3, 2015

2Outline  Front End for Muon Collider/ Neutrino Factory  Baseline for MAP 8 GeV proton beam on Hg target  325 MHz With Chicane/Absorber  Current status  New targetry 6.75 GeV on C target  New Mars generated beams Mars ouput much different from previous version

325MHz System “Collider” 325MHz System “Collider”  Drift  20 T  2 T  Buncher  P o = 250 MeV/c  P N = 154 MeV/c; N = 10  V rf : 0  15 MV/m (2/3 occupied)  f RF : 490  365 MHz  Rotator  V rf : 20 MV/m (2/3 occupied)  f RF : 364  326 MHz  N =  P 0, P N  245 MeV/c  Cooler  245 MeV/c  325 MHz  25 MV/m  cm LiH absorbers /0.75m 3

Simulation Results 4 N :0.15<P<0.35 GeV/c N: ε T <0.03; A L <0.2 N: ε T <0.015; A L <0.2  Simulation obtains  ~0.125 μ/p within acceptances  with ~60 m Cooler  325 MHz – less power  shorter than baseline NF  But  uses higher gradient  higher frequency rf  smaller cavities  shorter than baseline NF  more bunches in bunch train Useful cooling

New Proton Driver parameters  6.75 GeV p, C target  20  2 T short taper ~5 m (previously 15)  X. Ding produced particles at z = 2 m using Mars  short initial beam  Redo ICOOL data sets to match initial beam  ref particles redefined in for003.dat and for001.dat 5

Use old FE with new initial beam  New beam based on Mars 15  different apertures than baseline scenarion  ~half of initial beam lost in <6m aperture cut off 6  Large amount of secondaries at larger apertures at start  Did not see in previous runs because of cut-offs near target  Lost at 23 cm aperture used downstream

Following Scott’s review of front end  Use his initial distributions (obtained by X. Ding)  8 GeV protons on Hg target + and minus  6.75 GeV protons on C target  Start beam from z =10 m must retranslate into ICOOL reference particles  Early losses on apertures have already occurred 23 cm apertures 7

ICOOL translation tips  start at “z=10 m”  (particle time zero is at -1 m; launch point is z = - 1 m.)  reference particles  250 MeV/c ; 154 MeV/c μ MeV ; 81.1 MeV μ +  time set by 1 m as 6.75 GeV proton + 10 m as μ +  reference particles set in for003.dat, not for001.dat 01-Feb-2015 X. Ding C 10 m E E e e e e e e e e e e e e e e e e e e e e In ICOOL for001.dat REFP REF

ICOOL features  ecalc9.for has an error [Better to use ecalc9f.for.]  10.e09 should be 1.0e09 affects value of L in eV-s  After correction can use L to get ε +, ε -  L m = 0.3L/2/ ( = ½ of the angular momentum)  ε p = (ε t 2 +L m 2 ) 1/2  ε + = ε p +L m ; ε - = ε p -L m ; 9

First simulation results  Simulation results  Hg target 8 GeV –end of cooling  ~ μ + /p; ~ μ-/p;  C target 6.75 GeV p  ~ μ + /p; ~ μ - /p; μ + /p; ~ μ - /p when multiplied by 8/6.75 to compare beams of the same power.  Previous front ends had ~0.1 to ~0.125 μ/p 10

First simulations results 11 z=2m z=8m 8386  ~60% of initial particles are lost in first 6 m  previous front end lost ~20%  Beam starts out very large  previous much smaller in  front end simulations  μ/p reduced  ~0.061 μ + /p  ~0.048 μ - /p μ - less than μ + for C  Not fully reoptimized for new initial beam z=77m 7500 z=137m 5892

Progression of beam through system 12 z=11m z=104m z=135m

6.75 GeV p/ C target – 8 GeV Hg  Simulations capture typically somewhat less than before  Big difference in MARS production model MARS Inclusive  LAQGSM=1  Drop in production for ~8 GeV Are previous MARS simulations that showed an advantage in production for ~8 GeV still true ? 13

Add gas-filled rf in buncher/rotator  34 – 100 atm equivalent  1.14 MeV/m 34 atm  3.45 MeV/m 100 atm  for 34 atm add ~2 MV/m to rf  First tries with ICOOL  GH 2 in buncher 1 atm no change in capture  Change to 34 atm by DENS GH  Runs OK but reduces capture by 20% mostly from low-E muons  shorter bunch train 14 no gas gas z=135m gas z=71m

Other topics to explore  Replace vacuum rf with gas-filled rf  Also use gas in phase rotator  Do Buncher / phase rotation function as well ?  Replace initial 4-D Cooler with 6-D cooler  Has been initiated by Yuri  Would like a reference version to use as acceptance baseline  Integrate Buncher / Phase-rotation / Cooling  more compact system  adiabatic  snap rotation  Transform to general R&D  initial beam  ??? lower B-field, lower energy  other uses (mu2e … LFV expts. 15

Any questions? 16