Definition: Automation is the use of control systems for operating equipment with minimal or reduced human intervention. + save labour + reproducibility.

Slides:



Advertisements
Similar presentations
Engineering Diploma Level 2 Unit 7 Application of Maintenance Techniques in Engineering In this unit you will get involved with both maintenance procedures.
Advertisements

Verification and Validation
NHTSA Research update EVS-GTR National Highway Traffic Safety Administration April 16-18, /15/2013 EVS
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
August 14, 2003 Blackout Final Report
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut SwissFEL Timing System.
Wir schaffen Wissen – heute für morgen Do you believe in Operation Statistics? Presented at the Accelerator Reliability Workshop 2011 Andreas Lüdeke Paul.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Controls tools for operation management at the Swiss Light Source at the EPICS collaboration.
Accident Causes, Prevention and Control
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 19Slide 1 Verification and Validation l Assuring that a software system meets a user's.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Design & Documentation Adrian Marshall.
Implementation. We we came from… Planning Analysis Design Implementation Identify Problem/Value. Feasibility Analysis. Project Management. Understand.
Software Testing Verification and validation planning Software inspections Software Inspection vs. Testing Automated static analysis Cleanroom software.
Hazard Identification
An Introduction to AlarmInsight
High Potential Incident Intervention. Background 2 The principle policy of Downer Blasting Services regarding to our staff is “Zero Harm” The success.
Wir schaffen Wissen – heute für morgen 9. September 2015PSI,9. September 2015PSI, Paul Scherrer Institut Basic powersupply control – Digital implementation.
CS 501: Software Engineering Fall 1999 Lecture 16 Verification and Validation.
No: 1 CEMSIS 1 WP3 - Use of pre-developed products Key issues N. Thuy EDF R&D.
Beam tolerance to RF faults & consequences on RF specifications Frédéric Bouly MAX 1 st Design Review WP1 - Task 1.2 Bruxelles, Belgium Monday, 12 th November.
An automated diagnostic system to streamline DSM project maintenance Johan du Plessis 15 August 2012.
Copyright © Yokogawa Europe October 2006 ISD-MASP-S06017 Copyright © Yokogawa Electric Corporation 28th November, 2006 October 3, 2015 CENTUM CS 3000 Consolidated.
TELVENT IT for a Sustainable and Secure World Alarm Management Gregory Bogle Business Development Manager – Europe Telvent – Oil and Gas Division – EMEAA.
What is IT Governance? Corporate governance
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
Challenging Challenging Behaviour
Human Factors (HF) - Assessment Method Agenda What is Human Factors? Why do we need HF-Assessment Method ? What is the HF-Assessment Method ? Why.
Human Factors (HF) - Assessment Method For control rooms 2003.
Troubleshooting Windows Vista Lesson 11. Skills Matrix Technology SkillObjective DomainObjective # Troubleshooting Installation and Startup Issues Troubleshoot.
What is it we expect students to learn? Curriculum learning tasks need to be clearly stated 1.What policies and practices, regarding curriculum development,
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 22 Slide 1 Software Verification, Validation and Testing.
Effective Alarms Management: Towards a Rail Industry Specific Development Project Process Suzanne Heape Siemens RA 16 September 2015.
Getting There from Here: Creating an Evidence- Based Culture Within Special Education Ronnie Detrich Randy Keyworth Jack States.
Preparation for Sept 9mA studies: Follow-up items from February J. Carwardine, 22 May 2012.
Wir schaffen Wissen – heute für morgen Electronic Logbooks Revisited Paul Scherrer Institute Andreas Lüdeke Presented at the ARW 2011.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
THE DIGITAL REVOLUTION. Wir schaffen Wissen – heute für morgen 15. Apr. 2013PSI, Paul Scherrer Institut The fully digital PSI accelerator control room.
Human-Computer Interaction Design process Task and User Characteristics Guidelines Evaluation ISE
1 Phase Testing. Janice Regan, For each group of units Overview of Implementation phase Create Class Skeletons Define Implementation Plan (+ determine.
Dfernandez Computing & Controls Dec 3/4 MaxIV Control Systems for Accelerators and Automation David Fernández. ALBA Computing & Controls.
System of Environmental-Economic Accounting Sokol Vako United Nations Statistics Division Training for the worldwide implementation of the System of Environmental.
Overview of the handbook Chapter 5: Levee inspection, assessment and risk attribution.
Disaster Recovery Management By: Chris Rozic COSC 481.
Bad Zurzach, 1-4 December 2014 Stéphane Sanfilippo p. 1 Stéphane Sanfilippo, Paul Scherrer Institut Accelerator activities at PSI Wir schaffen Wissen –
Troubleshooting Windows Vista Lesson 11. Skills Matrix Technology SkillObjective DomainObjective # Troubleshooting Installation and Startup Issues Troubleshoot.
Interlock Systems for Machine Protection Manuel Zaera-Sanz Interlocks Engineer – ICS / Protection Systems AD and ICS Retreat mtg December 2014.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Synchrotron Light Sources at the Paul Scherrer Institute at the 20th ESLS workshop at BESSY.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Transition to user operation Didier Voulot :: Paul Scherrer Institut SwissFEL Commissioning Workshop, 22 March2016.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Intra Pulse Phase Control Manuel Brönnimann :: Paul Scherrer Institut LLRF Workshop 2015.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
Andreas Lüdeke, Trieste, 24. Sep., WAO '07 Operation Information Management at the Swiss Light Source Andreas Lüdeke of the Swiss Light Source at the Paul.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Overview high-level applications and code management Didier Voulot :: Paul Scherrer Institut … with a lot of input.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN SwissFEL Timing System status & plans Babak Kalantari :: Large Research Facilities /Controls :: Paul Scherrer Institut.
umbrellaID: Shibboleth 3 and Attribute Authority
Fault Management for the SKA - Niruj Mohan Ramanujam, NCRA
umbrellaID: New Website
WSP quality assurance tool
Performance monitoring framework for the technical infrastructure
M. Calvi & Th. Schmidt :: Insertion Device :: Paul Scherrer Institut
Steps towards beam commissioning: Magnet power supplies
Hot Checkout System for LERF Resuscitation
Network Management Functions
Analysis Software for Neutron Imaging
Intuitive Operator Support by new Process Visualization
Fundamental Test Process
Workshop on Accelerator Operations
BIC 10503: COMPUTER ARCHITECTURE
umbrellaID: OpenIRIS & Umbrella
1D Tolerance Stackup Analysis Software
Presentation transcript:

Definition: Automation is the use of control systems for operating equipment with minimal or reduced human intervention. + save labour + reproducibility + accuracy - high initial investment - increased complexity - knowledge loss - erroneous behaviour in unforesee situations

WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Automation Overview with Examples from the SLS Andreas Lüdeke :: Operation Manager Swiss Light Source :: Paul Scherrer Institut at the MAX-IV Automation Review Meeting, Dec. 2015

Know the task!  desired sequence  possible failures  success? Avoid “black boxes”  knowledge loss  silent failures  critical situations Best Practices Page 3

Accelerator start-up  checklists  sequencing  reports Device automation  example: RF start-up  example: RF tuning-loop Semi-automated operator procedures  example: “Open ID gaps” / “Close ID gaps” Areas of Accelerator Automation Page 4

Automated measurements  example: beam lifetime  example: BBA Failure reporting  example: RF first-fault  example: magnet PS failure reports Failure recovery  example: RF tuning loop  example: restore beam after trip Areas of Accelerator Automation Page 5

Ergonomic Tools Consistent Structured Task focussed Fault tolerant Responsive Support memory Ergonomic Operator Interfaces Page 6

Task focussed Operator Interface P SI, RF control Operator tasks: Trip recovery Set voltage Set phase RF control Operator tasks: Trip recovery Set voltage Set phase Page 7

Task focussed Operator Interface P SI, RF control Operator tasks: Trip recovery Set voltage Set phase RF control Operator tasks: Trip recovery Set voltage Set phase Dedicated Panel for Operation Dedicated Panel for Operation Page 8

B.R. Hollifield, Alarm Management: Seven Effective Methods for Optimum Performance Alarm handler objectives  acoustic alarm if operator intervention required  every possible problem should raise an alarm  no alarm, if no operator intervention is required!  provide guidance Alarm handler is THE central operator tool Alarm Management Best Practices Page 9

Characteristics of a good alarm  Relevant  Unique  Timely  Prioritised  Understandable  Diagnostic  Advisory  Focussing HSE Alarms Strategy: EEMUA Guide, Experience, IEC61508/11 Alarm Management Best Practices Page 10

Nuissance / chattering alarms Operator action undefined Stale alarms  “Shelving” Alarm storms Wrong alarm priorities Alarm Management Problems Page 11

Define “Alarm Philosophy”  Every alarm is documented and has an identified response  Alarm must not be ignored!  What alarms, which priorities and guidance?  Responsibilities, Key Performance Indicator Regular Alarm Performance Report  Analyse alarm frequencies  Lists of nuisance and stale alarms  Define action plan and assess progress Alarm Management Best Practices Page 12

Alarm Documentation and Rationalization  Create alarm priority grid  Document each alarm type: causes, corrective actions, consequences, time to respond, desired modifications, …  Alarm trip-point determination  Operator Training  Alarm philosophy  Handling and reporting nuisance alarms  Controls applications regarding alarms  Who can change what: alarm trip levels, alarm disabling  Alarm handling strategies: Shelving, State-Based, Flood Suppression, …  Proper and improper alarm suppression Alarm Management Best Practices Page 13

Ingredients to successful automation Know your tasks Avoid “black boxes” Comprehensive automation  Start-up  Devices  Operator procedures  Measurements  Failure reporting  Failure recovery Proper user interface design Alarm handler Alarm management