Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.

Slides:



Advertisements
Similar presentations
1 August 19, 2003 Earth Observing-1 Introduction and Some EO-1 Lessons Learned NRO Presentation August 18, 2003 Dan Mandl EO-1 Mission Director.
Advertisements

Team Dec13_11: Cole Hoven Jared Pixley Derek Reiser Rick Sutton Adviser/Client: Prof. Manimaran Govindarasu Graduate Assistant: Aditya Ashok PowerCyber.
Frank Stocklin Ron Vento Leslie Ambrose June 28,2001 SUPERNOVA/ACCELERATION PROBE (SNAP) Data Systems.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
National Aeronautics and Space Administration 1 GRC All-Hands Meeting 1 May 2006.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
JPL Autonomous Space Mission Simulation Flight Team Bob Hoffman Josh Ruggiero Adam Nikolic Dusty Terrill.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
Final Version Bob G. Beaman May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Electrical Power System (EPS)
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
Flight-like Flight Software Testing Methods Celina A Garcia Jet Propulsion Laboratory California Institute of Technology ©2009 California Institute of.
January, Please join us in the Tech Tower Auditorium on Tuesday, January 30th for a WFC3 Post-CDR Celebration 4:30 to 7:30 pm Dinner and adult beverages.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
Final Version Micro-Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Eric Stoneking Paul Mason May 17, 2002 ACS.
1 CCSDS File Delivery Protocol for Flight Applications Art Ferrer NASA/GSFC, Code 582 Fourth Space Internet Workshop June 2004 Hanover, MD.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
Final Version John Martin May 13-17, 2002 Opening Comments Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
NASA’s Goddard Space Flight Center Flight Software Charlie Wildermann Mike Blau Code Code 582 August 16-17, 2005.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
Command and Data Handling (C&DH)
JPL AUTONOMOUS RENDEZVOUS OVERVIEW Rob Bailey Jet Propulsion Laboratory Inter-Agency AR&C Working Group Meeting May , 2002 Naval Research Laboratory.
1 Lunar Reconnaissance Orbiter (LRO) CRaTER Technical Interchange Meeting C&DH Flight Software April 14, 2005.
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
.1 RESEARCH & TECHNOLOGY DEVELOPMENT CENTER SYSTEM AND INFORMATION SCIENCES JHU/MIT Proprietary Titan MESSENGER Autonomy Experiment.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
Supernova/Acceleration Probe (SNAP) Mission/Science Operations Irene Bibyk Tim Rykowski Bob Schweiss June 28, 2001.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
ONE Concept. ONE Work area & lab setup ONE Goals Provide single network interface regardless of physical link Provide reliable, isochronous message transport.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Final Version Gabe Karpati May 17, 2002 Micro-Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF) System Overview.
Space Operations as a Guide for a Real-World Scheduling Competition Eduardo Romero Marcelo Oglietti
Final Version Dick Bolt Code 302 May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Success.
Overview of SOIS Electronic Data Sheets (EDS) & Dictionary of Terms (DoT) SOIS APP WG Fall 2012.
Test-as-You Fly SpaceWire for Solar Probe Plus
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
Flight Software Overview
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
March /5/2016 At A Glance STARS is a real-time, distributed, multi-spacecraft simulation system for GN&C technology research and development. It.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
V3 SLAC DOE Program Review Gunther Haller SLAC June 13, 07 (650) SNAP Electronics.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
Final Version Gary Davis Robert Estes Scott Glubke Propulsion May 13-17, 2002 Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
March 2004 At A Glance The AutoFDS provides a web- based interface to acquire, generate, and distribute products, using the GMSEC Reference Architecture.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
TRIO-CINEMA 1 UCB, 2/08/2010 ACS Dave Auslander, Dave Pankow, Han Chen, Yao-Ting Mao, UC Berkeley Space Sciences Laboratory University of California, Berkeley.
NASA’s Goddard Space Flight Center Flight Software Charlie Wildermann Mike Blau Code Code 582 August 16-17, 2005.
Simulink Interface Layer (SIL)
Overview of SOIS Electronic Data Sheets (EDS) & Dictionary of Terms (DoT) SOIS APP WG Fall 2012.
I&T&C Organization Chart
GLAST Large Area Telescope:
Integrating CCSDS Electronic Data Sheets into Flight Software
SDO Flight Dynamics Subsystem
Micro-Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF)
Launch and On-orbit Checkout
CubeSat vs. Science Instrument Complexity
CONTOUR NGIMS Electronics Test History
Instrument Overview Larry Springer HMI Program Manager
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope:
Presentation transcript:

Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Flight Software Page 2  Cost Drivers  C&DH Software Functional Overview  ACS/ACE Software Functional Overview  Instrument Software Functional Overview  Required Software Development Environments  Cost Estimates  Risk Assessment  Issues & Concerns Flight Software Topics

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Flight Software Page 3 Cost Drivers  Two Mission Phases of Spacecraft Constellation Configurations  Hub & Mirrorsats Attached through Mission Phase 1  Hub & Mirrorsats Detached through Mission Phase 2  Constellation Management (Comm, Science Ops, Redundancy, FDC, etc)  Smart PSE for “Extra/Better” Science Ops.

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Flight Software Page 4 Flight Software C&DH Software Functions Function  Command Ingest & Distribution  R/T H-K Telemetry Transmit  Power Control (Smart PSE)  Science Ops Schedule Mgt  S/C H-K data collection  S/C & Instrument H-K data storage & playback  Science data playback  S/C & Instrument H&S monitoring  Real-time OS  File Management  S/C time maintenance & distribution (NTP)  IP/Ethernet onboard & space- space communications  IP/Ethernet onboard & space- ground communications  I/F Management Hub (1) yes (from Det) yes no yes no yes no yes Detector (1) yes (from GN) yes no MirrorSat (6) yes (from Hub) yes no yes no yes no yes

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Flight Software Page 5  Sensor Data Acquisition & Processing  CSS (8)  ST (2)  IRU (1)  Accelerometer (1)  Thrusters (4)  Micro-Newton Thrusters (12)  Validate Ephemeris Update  Compute Solar Ephemeris  Compute Lunar Ephemeris  Compute Total Momentum  Estimate State Vector  Disturbance & Inertia Estimations  Adoptive Control & Formation Flying  ACE Safemode Processing  Execute Science Mode Processing  Execute Maneuver Mode  Guide Star Processing  Compute/Check Target Quaternion  HGA Pointing  Generate Commands  Thrusters  Micro-Newton Thrusters  ST  HGA  Detect & Process ACS Faults ACS/ACE Software Functions (Detector)

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Flight Software Page 6 ACS/ACE Software Functions (Hub)  Sensor Data Acquisition & Processing  CSS (8)  ST (2)  IRU (1)  Accelerometer (1)  Thrusters (4)  Micro-Newton Thrusters (12)  Beacons for MirrorSat (6)  Beacon for Detector (1)  Validate Ephemeris Update  Compute Solar Ephemeris  Compute Lunar Ephemeris  Compute Total Momentum  Estimate State Vector  Disturbance & Inertia Estimations  Adoptive Control & Formation Flying  ACE Safemode Processing  Collision Avoidance  Execute Science Mode Processing  Execute Maneuver Mode  Guide Star Processing  Compute/Check Target Quaternion  HGA Pointing  Generate Commands  Thrusters  Micro-Newton Thrusters  ST  HGA  Detect & Process ACS Faults (2 configurations, self & MirrorSats when attached)

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Flight Software Page 7 ACS/ACE Software Functions (MirrorSat)  Sensor Data Acquisition & Processing  CSS (8)  ST (2)  IRU (1)  Swarm Sensor (1)  Thrusters (4)  Micro-Newton Thrusters (12)  Validate Ephemeris Update  Compute Solar Ephemeris  Compute Lunar Ephemeris  Compute Total Momentum  Estimate State Vector  Disturbance & Inertia Estimations  Adoptive Control & Formation Flying  ACE Safemode Processing  Collision Avoidance  Execute Science Mode Processing  Execute Maneuver Mode  Guide Star Processing  Compute/Check Target Quaternion  Generate Commands  Thrusters  Micro-Newton Thrusters  ST  Detect & Process ACS Faults

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Flight Software Page 8 Instrument Software Functions Function  Mechanisms control  Exposure control  Read out CCD  Calibration  H-K data collection Detector (1)  yes MirrorSat (6)  yes  no  yes Hub (1)  yes

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Flight Software Page 9 Typical Phase I Development Test Bed ACS/C&DH (Detector) Hybrid Dynamic Simulator Spacecraft External Data Bus (IP/Ethernet) Transponder Simulator Misc data simulator Development Workstation Serial Interface SI data simulator ACE (Detector) Ground System Workstations Development Workstation A similar configuration for Hub/MirrorSat not shown

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Flight Software Page 10 Final Phase Development (System) Test Bed Detector Development String Hub External Data Bus Transponder Simulator MirrorSat Constellation Simulator (n-1) Hub/MirrorSat Development String Ground System Workstations Transponder Simulator MSat External Data Bus

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Flight Software Page 11 Flight Software Cost Estimates Summary  ItemDetector ($k)Hub ($k)MirroSats ($k)  Mgt & SW Sys. Eng.06 (0,900)06 (0,900)06 (0,900)  C&DH Software15 (2,250)18 (2,700)20 (3,000)  ACS/ACE Software20 (3,000)25 (3,750)25 (3,750)  PSE Software04 (0,600)04 (0,600)09 (1,350)  Instrument Software04 (0,600)04 (0,600)09 (1,350)  Software Systems Test05 (0,750)07 (1,050)10 (1,500)  Formation Flying System Test02 (0,300)03 (0,450)07 (1,050)  I&T, H/W Spt. & Maint.08 (1,200)08 (1,200)12 (1,800)  Testbed Engineering02 (0,300)02 (0,300)05 (0,750)  Hardware & Software Tools (0,200)(0,200) (0,500)  Total Labor* & Materials66 (10,100)77 (11,750)103 (15,950)  Grand Total246 FTEs (37,800k) Assumed $150K/M-Y Breadboards & ETUs for C&DH, PSE & ACE, ACS HDS, GSE and Front-end simulator book-kept elsewhere

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Flight Software Page 12 Flight Software Risk Assessment  WV IV&V Cost keep at project level.  Today/near-future flight CPU can handle the estimated processing  Flight IP/Ethernet technologies should be matured in 2010  New concepts required for software system-level testing due to nature of constellation  MirrorSat Constellation simulator in addition to traditional HDS  Phased testbed development environment ranging from single subsystem c/o to full flight data system string (over 30 sets of software system development)  Early data system component development required to support FSW development in all areas to mitigate risks  Early development and c/o of breadboards/ETUs will be required  Typical software risks apply  Good industry practices  Adequate test time  Adequate test resources  Adequate documentation

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Flight Software Page 13 Flight Software Issues and Concerns  Several novel control concepts required to manage this particular constellation  No heritage in developing test strategy for this type of application  Multiple constellation configurations of mission phases add significant complexity to flight software and test strategy.  Further development of concept of failure detection & correction, and redundancy management is required.  Cost may be significantly differ from today estimates (recommend further development of the concept)  Procurement strategy will have a significant impact (# of sources)