Copyright © 2013 Nelson Education Ltd. PowerPoint Presentations for Cornerstones of Cost Accounting First Canadian Edition Adapted by George Gekas Ryerson.

Slides:



Advertisements
Similar presentations
Systems Design: Activity-Based Costing
Advertisements

Activity-Based Costing: A Tool to Aid Decision Making
Ch 5 – Activity based accounting
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
Activity-Based Costing Systems Chapter 4. Traditional overhead allocation system  Single predetermined rate is used to allocate overhead to products.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Supplementary Slides - Activity Based Costing Systems Design:
Activity Based Costing: A Tool to Aid Decision Making Chapter 8.
ACTIVITY BASED COSTING. Learning Objectives Discuss the importance of unit costs Describe the functional-based costing approach Explain why functional-based.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 8.
1 ACTIVITY-BASED COSTING Chapter 7 Accounting Principles II AC Fall Semester, 1999.
Copyright © 2013 Nelson Education Ltd.
Chapter Seven Activity-Based Costing: A Tool to Aid Decision Making.
Activity-Based Costing: A Tool to Aid Decision Making
Chapter 5 Job Order Costing
COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.
0 CHAPTER 6 Activity-Based Costing © 2009 Cengage Learning.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
1 TRADITIONAL PRODUCT COSTING METHODS Accounting Principles II AC Fall Semester, 1999.
Activity-Based Costing and Analysis
Chapter Seven Activity-Based Costing and Management
Chapter JOB-ORDER COSTING Chapter 4 Accounting Principles II AC Fall Semester, 1999.
Unit 5 ACTIVITY-BASED COSTING Study Objectives  Recognize the difference between traditional costing and activity based costing.  Identify the steps.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Management Accounting Lecture 8 (Chapter 3) Systems Design:
Cost Allocation and Activity Based Costing
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
12-1 Activity- Based Costing Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University.
Copyright © The McGraw-Hill Companies, Inc 2011 ACTIVITY-BASED COSTING: A TOOL TO AID DECISION MAKING Chapter 7.
Copyright © 2013 Nelson Education Ltd. PowerPoint Presentations for Cornerstones of Cost Accounting First Canadian Edition Adapted by George Gekas Ryerson.
1 Activity-based costing. 2 Introduction In the past, overhead costs were relatively small, and the problems arising from inappropriate overhead allocations.
Activity Based Costing: A Tool to Aid Decision Making
Management Accounting
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
4-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.
4-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Activity-Based Accounting 4 PowerPresentation® prepared by David J. McConomy, Queen’s.
Activity Accounting: Another Way to Measure Costs
Activity Based Costing: A Tool to Aid Decision Making
Lecture 18. Lecture Overview Process Costing Equivalent Units Practice Questions Operations costing Practice Questions.
Copyright © 2012 The McGraw-Hill Companies, Inc. PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker,
Activity-Based Costing and Analysis
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fifth Edition Wild, Shaw, and Chiappetta Fifth Edition McGraw-Hill/Irwin Copyright © 2013.
When cost systems were developed in the 1800s, the emphasis was on simplicity because: 1. Cost and activity data had to be collected by hand and all calculations.
Allocating Overhead Chapter 16 … “Job Order Costing”: allocated overhead using Pred. Overhead Rate with Direct Labor as an allocation.
Activity-Based Costing
4 -1 Activity-Based Costing CHAPTER Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Systems Design: Activity-Based Costing Chapter 3.
Chapter 4-1 Don R. Hansen Maryanne M. Mowen Nabil S. Elias David W. Senkow MANAGEMENT ACCOUNTING Copyright 2001 Nelson Thomson Learning.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin Chapter 3 System Design: Activity-Based Costing PowerPoint Authors:
4 -1 Activity-Based Costing CHAPTER Discuss the importance of unit costs. 2.Describe functional-based costing approaches. 3.Explain why functional-based.
Copyright © 2013 Nelson Education Ltd. PowerPoint Presentations for Cornerstones of Cost Accounting First Canadian Edition Adapted by George Gekas Ryerson.
Copyright © 2013 Nelson Education Ltd. PowerPoint Presentations for Cornerstones of Cost Accounting First Canadian Edition Adapted by George Gekas Ryerson.
CHAPTER 7: ACTIVITY-BASED COSTING AND MANAGEMENT Cost Management, Canadian Edition © John Wiley & Sons, 2009 Chapter 6: Process Costing Cost Management,
Welcome Back Atef Abuelaish1. Welcome Back Time for Any Question Atef Abuelaish2.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Job Order Cost Systems and Overhead Allocations Chapter 17.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 8.
Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
3-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2016 by McGraw-Hill.
Activity-Based Costing
Chapter 4 Activity-Based Costing
Activity-Based Costing
Cornerstones of Managerial Accounting, 5e
Financial and Managerial Accounting
Activity-Based Costing
Fundamental Cornerstones of Managerial Accounting Chapter Six
Chapter 18: Activity-Based Costing and Management
Presentation transcript:

Copyright © 2013 Nelson Education Ltd. PowerPoint Presentations for Cornerstones of Cost Accounting First Canadian Edition Adapted by George Gekas Ryerson University

ACTIVITY-BASED COSTING Copyright © 2013 Nelson Education Ltd.

Unit-Based Product Costing Copyright © 2013 Nelson Education Ltd. Overhead costs are assigned to products using predetermined overhead rates. Predetermined overhead rate Budgeted annual overhead Budgeted annual driver level = Applied overhead = Overhead rate  Actual driver usage

Unit-Based Product Costing Copyright © 2013 Nelson Education Ltd. Overhead Variances The difference between actual overhead and applied overhead is an overhead variance. If actual overhead > applied overhead: underapplied overhead If actual overhead < applied overhead: overapplied overhead Disposal of variance: If immaterial, assign to cost of goods sold. If material, allocate between work-in-process inventory, finished goods inventory, and cost of goods sold.

Unit-Based Product Costing Copyright © 2013 Nelson Education Ltd. Departmental Rates Costs assigned to individual production department overhead cost pools. Unit-level drivers for each department are identified. Predetermined rates are calculated for each department. Overhead is applied to each product for each department that product passes through. Overhead Application: Departmental Rates See Cornerstone 6-3

Limitations of Plantwide and Departmental Rates Copyright © 2013 Nelson Education Ltd. Non-Unit-Related Overhead Costs Plantwide and department rates assume that a product’s consumption of overhead is directly related to units produced. Some costs, however, such as setups, cost a certain amount no matter how many products are produced. Other costs, such as engineering hours, may depend on something entirely different, such as work orders, not units.

Limitations of Plantwide and Departmental Rates Copyright © 2013 Nelson Education Ltd. Product Diversity Even if there are significant non-unit-driven overhead costs, it will not cause distorted costing if the products all consume overhead in the same proportion as unit-level-driven overhead costs. Product diversity: Products consume overhead activities in different proportions. Can be caused by differences in product size, complexity, setup time, batch size, etc. The proportion of each activity consumed by a product is called the consumption ratio.

Limitations of Plantwide and Departmental Rates Copyright © 2013 Nelson Education Ltd. Problems with Costing Accuracy At the toy manufacturer discussed in the text, race cars use 40,000 hours of labour and robots use 10,000. If a plantwide rate is used, race cars will receive four times the amount of overhead assigned to robots! But look at the activities: Race cars use 3 times as many setups as robots. Race cars use about 2⅓ times as many inspection hours as robots. Race cars use about 1½ times as many moves as robots. Is it fair to assign four times as much overhead to race cars as to robots? See Cornerstone 6-4

Limitations of Plantwide and Departmental Rates Copyright © 2013 Nelson Education Ltd. Activity Rates: A Better Approach Instead of using a single pool or department pools based on units, expand the number of pools and rates and base them on activities. Rates are based on causal factors that measure consumption—both unit and non-unit based. Thus, in our toy manufacturer, we can use four pools related to our four activities: machining, setups, moving materials, and inspections.

Limitations of Plantwide and Departmental Rates Copyright © 2013 Nelson Education Ltd. Comparison of Methods

Limitations of Plantwide and Departmental Rates Copyright © 2013 Nelson Education Ltd. Comparison of Methods Two producing departments: moulding and assembly Two products: race cars and robots Five times more race cars than robots are produced, making race cars a high-volume product and robots a low-volume product Moulds for robots are larger and more varied than those for race cars Four types of overhead activities are performed: setups, machining, inspection, and moving batches

Limitations of Plantwide and Departmental Rates Copyright © 2013 Nelson Education Ltd. Comparison of Methods

Activity-Based Costing System Copyright © 2013 Nelson Education Ltd.

Activity-Based Costing System Copyright © 2013 Nelson Education Ltd. Design Steps for an ABC System Step 1: Identify, define, and classify activities and key attributes. A simple list of activities identified is called an activity inventory. Activity attributes are nonfinancial and financial information items that describe individual activities. An activity dictionary lists the activities in an organization along with desired attributes. A primary activity is one that is consumed by the final cost object.

Activity-Based Costing System Copyright © 2013 Nelson Education Ltd. Design Steps for an ABC System Step 2: Assign the cost of resources to activities. Cost of an activity is the cost of the resources consumed by that activity. If a resource is exclusive to an activity, assign 100% of the cost to the activity. If the resource is split between more than one activity, determine a resource driver. Step 3: Assign the cost of secondary activities to primary activities. Treat the secondary activity like a resource from the previous step. See Cornerstone 6-6

Activity-Based Costing System Copyright © 2013 Nelson Education Ltd. Design Steps for an ABC System Step 4: Identify cost objects and specify the amount of each activity consumed by them. Assign costs consumed by more than one activity in proportion to their usage of the activity as measured by the activity driver. Transaction drivers measure the number of times an activity is performed. Duration drivers measure the demands in terms of the amount of time it takes to perform an activity.

Activity-Based Costing System Copyright © 2013 Nelson Education Ltd. Design Steps for an ABC System Step 5: Calculate primary activity rates. Primary activity rates are computed by dividing budgeted activity costs by practical activity capacity. Practical activity capacity is the activity output that can be produced when the activity is performed efficiently. Step 6: Assign activity costs to cost objects. Multiply the activity rate by the actual number of activity drivers consumed.

Activity-Based Costing System Copyright © 2013 Nelson Education Ltd. Classifying Activities Classifying activities into categories aids in product costing because the cost behaviour differs by level. The four levels are: 1. Unit-level 2. Batch-level 3. Product-level 4. Facility-level

Reducing the Size and Complexity of an ABC System Copyright © 2013 Nelson Education Ltd. Before-the-Fact Simplification: TDABC Simplifies Stage 1 by eliminating the need for detailed interviewing and surveying to determine resource drivers: Calculate total operating cost of a department or process. Divide by practical capacity to determine a capacity cost rate. Multiply this by time to perform one unit of activity and total activity output to determine your total activity cost. See Cornerstone 6-7

Reducing the Size and Complexity of an ABC System Copyright © 2013 Nelson Education Ltd. After-the-Fact Simplification Approximately Relevant ABC Systems Calculate the cost of your activities. Combine the less expensive activity costs into the more expensive activity costs, making fewer categories. Equally Accurate Reduced ABC Systems Use expected consumption ratios to reduce the number of drivers. See Cornerstone 6-8

End of Chapter