Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.

Slides:



Advertisements
Similar presentations
Load Responsibility in the NWPP Footprint
Advertisements

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N System Condition Update Spring Operations Review Forum June 15, :00 – 2:00 p.m. To participate.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing an Over-Supply of Generation October 12, 2010 Public Meeting.
1 Managing Uncertainty in Generation, Inventory and Revenue January 23, 2011 AMS Meeting AMS SHORT COURSE: HYDROLOGIC PREDICTION AND VERIFICATION TECHNIQUES.
Technical Conference Avoided Cost Modeling January 6, 2015.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.
Genesys Model Enhancements October 4, 2011 NW Resource Adequacy Steering Committee Meeting Gwendolyn S Shearer.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Public Exchange Clarification Briefing June 2009.
April Runoff Forecasts for the Columbia Basin and Power Supply Implications Jim Ruff and John Fazio Council Meeting April 14, 2010 Boise, ID.
5/22/20151 Northwest Power & Conservation Council Power Committee Over-generation and Negative Energy Prices – a work in progress Jeff King September 21,
Chapter 8 Interests In Joint Ventures © 2009 Clarence Byrd Inc. 2 Joint Venture Defined  Paragraph (c) A joint venture is an economic activity.
Learning Objectives After studying this chapter, you should be able to: Recognize revenue items at the proper time on the income statement. Account for.
Managing Interest Rate Risk (I): GAP and Earnings Sensitivity
© 2004 The McGraw-Hill Companies, Inc. McGraw-Hill/Irwin Chapter 15 Leases.
© 2004 The McGraw-Hill Companies, Inc. McGraw-Hill/Irwin Chapter 18 Employee Benefit Plans.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Southern Intertie Discussion.
CHAPTER FOUR – SOURCES OF FINANCE. SOURCES OF FINANCE  Internal Sources  Refers to funds that are generated from within the firm itself – from owner’s.
Federal Columbia River Power System Operations Planning.
Canadian Columbia River Basin Forum Stephen Oliver VP Generation Supply Bonneville Power Administration November 10, 2005.
Network Economy System Overview and Demonstration May 3, 2007 Raj Hundal.
BPA FY 2003 Financial Condition Update: Liquidity Tools to Bridge the Gap Confidential – Sensitive Information BPA has a number of liquidity tools to bridge.
Daily Settlement Transition Overview NGX Power Product Suite October 2010.
MANAGEMENT DECISIONS AND FINANCIAL ACCOUNTING REPORTS Baginski & Hassell.
Future of the Columbia River Treaty A British Columbia Perspective 2014 PNWA Summer Conference Coeur d’Alene June 23, 2014 Kathy Eichenberger B.C. Ministry.
Slide 2.1 Accounting and Reporting on an Accrual Accounting Basis Chapter 2.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Bonneville Power Administration This information is being released externally by BPA on February 9, 2009 as an ad hoc report or analysis generated for.
Transfer Service Meeting, October 19, 2005 Bonneville Power Administration Long-Term Transfer Service (GTA and OATT) Customer Kick-Off Meeting Garry Thompson.
1 BC Generation Overview Central Asia Delegation 30 January 2013 Doug Robinson Canadian Entity Secretary BC Hydro - Generation.
Hydro Power 102. Hydroelectric Models in the Northwest.
BUILDING STRONG ® Dworshak SOR # Transition to Refill Stephen Hall P.E., Reservoir Regulation Walla Walla District USACE.
Energy Northwest Executive Board Meeting February 27, 2003.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
OPUC Natural Gas Outlook 2014 July 8,
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Northwest Power and Conservation Council slide 1 The Columbia River Treaty John Shurts General Counsel Northwest Power and Conservation Council Portland,
Transfer Service Issues Meeting Bonneville Power Administration (BPA) “Considerations” From Exhibit A, of the 20-Year Contract OTHER ISSUES AS THEY RELATE.
April Columbia River Treaty Overview of Columbia River Treaty.
TAC Credit Update July TAC July Credit Update To meet the F&A Committee’s request that the Credit WG develop options for dealing with residual credit.
Demand Response: Next Steps OPSI Annual Meeting October 1, 2012 Howard J. Haas.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
Costing and accounting system Session 1-2. Types of inventory Direct material ▫Which represent direct material in inventory awaiting manufacture. Work.
Explanation of Changes to Draft “Firming” Schedule, Service Schedule E Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
2013 Wind Conference. Transmission Service Study Process Steve Purdy.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
Columbia River Treaty Past, Present and Future Status of Columbia River Treaty Discussions: a BC government perspective October 7, 2015 Osoyoos, BC Kathy.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Pre-decisional page 1 (for discussion only) Roy Fox, BPA Enterprise Risk Manager January 28, 2005 Fish Cost Components Workshop PBL Rate Case Risks and.
Handout Manajemen Keuangan
Accounting (Basics) - Lecture 5 Lease. Contents Classification of leases Finance leases - financial statements of lessees and lessors Operating leases.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
Overview of the Contract Carriage Gas Markets in Eastern Australia James Mellsop Director 4 December 2012 Presentation to PEA.
Aligning the Gas and Electric Markets: EDF Solutions
Prepared by California Department of Water Resources May 31, 2001
Accounting (Basics) - Lecture 5 Lease
Fuel Cost Components in the Fuel Adder
California Product Offerings
Fuel Cost Components in the Fuel Adder
Fuel Cost Components in the Fuel Adder
4th Quarter 2016 Earnings Call
GENESYS Current Functionality
Presentation transcript:

Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts

Slide 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Account Types and Sizes  A new non-Treaty storage agreement would allow coordinated use of additional reservoir storage in Canada (non-Treaty storage). This coordination is accomplished through the use of non-Treaty storage accounts established under the proposed agreement terms.  There are three types of accounts established totaling five million acre-feet (Maf) – Active Storage accounts total 3 Maf equally shared by BPA and BC Hydro. These accounts remain open and available through the term of agreement. – Recallable Storage is 0.5 Maf and is currently empty (has no water in it). BC Hydro may make this space available on a temporary basis. This type of account would generally be used in high water years when extra system storage is needed. Recallable storage is equally shared by BPA and BC Hydro – Recallable Release is 1.5 Maf and is currently full of water. BC Hydro may make this account available on a temporary basis. This type of account would typically be used in a dry water condition when additional water and flows are needed to meet power and non- power needs. Recallable release is equally shared by BPA and BC Hydro.

Slide 3 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Limitations on Storage and Release Activity  Overall, non-Treaty storage activity must not reduce the power and flood control benefits of the Treaty operating plans – a Treaty requirement.  When one party desires to increase or decrease flows from non- Treaty storage, a request is made of the other party. If the other party cannot accept the flow change, the transaction is denied. Otherwise, the transaction goes forward.  All flow changes are scheduled on a flat weekly basis and are made at Arrow.  Storage is a reduction in flow and release is an increase in flow.

Slide 4 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 The Active Storage Accounts BPA’s Share  BPA’s storage and release transactions result in a change in flow out of Arrow.  The change in Arrow flow will then change flows into Grand Coulee and generally result in generation changes through all the projects downstream.  There are no energy schedules between BPA and BC Hydro associated with the change in Arrow outflows from BPA’s transactions.  BPA compensates BC Hydro for the energy reduction that is calculated to occur at Mica as a result of its lower reservoir level from BPA’s non-Treaty storage use (headlosses).

Slide 5 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 The Active Storage Accounts BC Hydro’s Share  BC Hydro’s storage and release transactions result in a change in flow at Arrow  The change in Arrow flow will then change flows into Grand Coulee and it is assumed the flow change will result in generation changes at Grand Coulee and through all the projects downstream.  The change in energy generated by the downstream federal hydroprojects is calculated each day based on the water-to-energy conversion factor, or h/k for each of the affected federal projects.  The economic value of the change in energy generated is also calculated by using a preschedule mid-C market index price.  There are no energy deliveries concurrent with the BC Hydro water transactions, but the cumulative economic value of the change in federal generation is calculated over time.

Slide 6 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Sample Calculation for BC Hydro Release Transactions Energy Calculation  Assume BC Hydro releases 10 kcfs from their non-Treaty storage account for one week.  Assume that the water would pass through all federal projects downstream.  A typical water-to-energy conversion factor or h/k for the federal projects from Grand Coulee through Bonneville is about 60 MW per kcfs, if projects are not spilling.  So the generation change is 10 kcfs x 60 MW/kcfs = 600 MW flat for the week.  600 MW x 24 hours = 14,400 MWh/day.  14,400 MWh/day x 7 days = 100,800 MWh of additional federal generation for the week.

Slide 7 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Sample Calculation for BC Hydro Release Transactions Energy Value Calculation  To determine the value of the additional generation on the federal system, a daily preschedule index for mid-C energy prices is used.  It is assumed both the water and energy are flat so a flat index price is used.  Assume for this example that the flat index price for each day of the week is $40/MWh.  Using 100,800 MWh of additional federal generation for the week from the previous slide and the price of $40/MWh the economic value of the increased generation is $4.03 million.

Slide 8 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Sample Calculation for BC Hydro Storage Transactions Energy Value Calculation  Assume that sometime later in the year, BC Hydro stores back 10 kcfs for a week into their non-Treaty storage account.  There would now be less water to pass through federal projects downstream.  Using the same typical h/k for the federal projects of 60 MW/kcfs, the generation change would be -100,800 MWh for the week.  BC Hydro would typically choose a relatively low-priced period to store into their account, so assume the flat mid-C index price is now $30/MWh.  The value of the generation change would be -$3.02 million.  The amount of water in the BC Hydro non-Treaty storage account is now the same as at the outset, but the net value of the energy changes from federal hydro projects downstream is $1.0 million.

Slide 9 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 BC Hydro’s Transaction Benefits Account  The value of BC Hydro’s transactions are netted throughout the year.  It is expected that BC Hydro will act in an economic fashion with respect to non-Treaty storage transactions.  Results of the energy calculations and energy value calculations are kept in a continuous fashion in a “Transaction Benefits” account maintained by BPA and confirmed by BC Hydro.  The Mica headlosses that BPA owes BC Hydro are also kept as economic value and included in the Transaction Benefits account.  It is to be expected that most often the Transaction Benefits account would have a positive value, meaning that BPA would owe BC Hydro at the end of the year.  However, it is possible that BC Hydro would owe BPA at the end of the year, if there had been a lot of storage activity and few releases.

Slide 10 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Settling BC Hydro’s Transaction Benefits Account  The Transaction Benefits account may be settled by one of two means.  Energy Deliveries (mutually agreed) - if it is expected that the account balance would afford a benefit to either BPA or BC Hydro at the end of September, the party with the expected benefit may request delivery of energy to the Canada/U.S. border up to the expected benefit amount. Deliveries would be by mutual agreement. – If this option is exercised, the Transaction Benefits account would be adjusted by the value of the energy delivered to the border.  Financial Settlement – Unless otherwise agreed, the balance in the Transaction Benefits account at the end of September will be financially settled.

Slide 11 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Sample Transaction Benefits Accounting Typical Spring Storage/Summer Release – benefits both fish and power Net value $2.87 million

Slide 12 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 How Power Benefits are Created  The BC Hydro Transaction Benefits Account readily demonstrates the value of shaping water for federal generation.  Although not explicitly accounted for, the same benefits accrue to the federal system through BPA’s transactions and resulting flow/generation changes at federal projects.  Power benefits are created by: – storing water when it has less economic value and releasing it when it has more economic value ($ gain) – Shaping water so that more energy is produced from a unit of water, for example producing energy from water that would otherwise be spilled (beyond that needed for fish) (MW gain and $ gain).

Slide 13 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Examples of Seasonal Variation in Federal h/k (based on 70-year study average) and Energy Prices (from October 2009 – September 2010)

Slide 14 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Example of Unit Value of Water

Slide 15 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 The Recallable Accounts  There are two types of recallable accounts that may be made available by BC Hydro for shared use on a recallable or temporary basis. Recallable accounts would typically be used in unusual conditions such as very low or very high water years. As with the Active Accounts, all transactions are by mutual agreement. – Recallable Storage – this space is currently empty, so could be used to store water in a high water year. – Recallable Release – this space contains water, so it could be used in a dry water year to supplement low flows.  Accounting for transactions in recallable accounts is the same as that for Active Accounts. – There are no energy schedules between BPA and BC Hydro associated with the change in Arrow outflows from BPA’s transactions. – BC Hydro transactions are included in the Transaction Benefits Account.

Slide 16 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Firm Release Provisions for BPA  The proposed terms include two “firm” release provisions, one for BPA and one for BC Hydro.  BPA’s has a firm release right for 0.5 Maf of water in the spring (May/June) of the lowest 20% of water years (a BiOp objective for ESA-listed fish). This release right is limited by the volume of storage in BPA’s Active Account and it may not have been exercised in the previous year. – As with other BPA accounts, there are no energy schedules between BPA and BC Hydro associated with the change in Arrow outflows from BPA’s firm release provisions.

Slide 17 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Firm Release Provisions for BC Hydro – the Intent  BC Hydro firm release provisions are intended to provide a firm planning benefit based on their current practice of critical water planning and the requirement to be load/resource balance by 2015, excluding imports and thermals.  To the extent that non-Treaty storage can be used as a firm resource in BC Hydro planning, a resource that would otherwise be needed to balance loads can be deferred.  This benefit is intended to be for planning purposes only and will likely not be used in actual operations. Rather, in critical water conditions, BC Hydro is expected to use the market to meet load.  The intent of the provisions is for this provision to be usable, to be less attractive than using the market, and to be no cost to BPA or downstream U.S. parties.

Slide 18 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Firm Release Provisions for BC Hydro – the Details  There are some specifics of these provisions yet to be defined in the contract.  In critical water conditions on BC Hydro’s system as defined by streamflow conditions reported in a public venue, from October through April BC Hydro may release 2 kcfs from their Active Account and Recallable Release Account.  If BC Hydro makes such a release, BPA may also request a release of 2 kcfs from their Active and Recallable Release Accounts  BPA would deliver the energy produced by all downstream U.S. projects from the increased flow, including the generation from mid-C projects, to the Canada/U.S. border. Deliveries may be restricted on certain hours due to capacity constraints on BPA’s system. The value of energy delivered would be calculated.  BC Hydro would pay all transmission costs and losses  Flows would be reduced and the water stored back into Active and Recallable accounts by mutual agreement.  BC Hydro would deliver to BPA energy of equivalent value to that received.  BC Hydro would pay all transmission costs and losses for delivery of the energy returned to BPA

Slide 19 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Benefits of the Proposed Agreement for Fisheries  Absent a new long-term non-Treaty storage agreement, BPA would likely continue to negotiate annually for seasonal non-Treaty agreements to shape water from spring to summer.  A new long-term agreement would provide more certainty for obtaining these spring/summer flow shaping benefits.  The proposed agreement also provides for 0.5 Maf of additional water in the spring in the lowest water conditions to provide benefits for ESA-listed fish.  In some high water conditions, a new non-Treaty storage agreement may be useful in reducing flows/spill and dissolved gas levels in excess of state standards.

Slide 20 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Power Benefits of the Proposed Agreement  Absent a new long-term agreement, BPA would likely continue to negotiate annually for non-Treaty agreements to shape water from spring to summer. These agreements provide a power as well as a fisheries benefit. Based on studies of historic water conditions, the estimated power value of these short-term agreements is about $3 million/year to the federal system and its customers. There would be additional benefits to the mid-C project participants and to BC Hydro.  Under a long-term agreement there would be additional flexibility to to utilize non- Treaty storage outside the spring/summer period, including shaping flows from year to year.  The benefits of any any non-Treaty agreement will vary significantly from year to year, however the estimated value to the federal system of a new long-term agreement is estimated to be $8 million/year, more than double the power benefits of seasonal short-term agreements. There would be additional benefits to the mid-C project participants and to BC Hydro.  Slice customers would receive their proportionate share of the federal benefits.

Slide 21 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Further Information For further information and documents: