Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.

Slides:



Advertisements
Similar presentations
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Advertisements

IMO Perspective on Reliability A presentation to the IEEE Toronto Section Forum on Reliable Power Grids in Canada by Dan Rochester, Section Head - Assessments.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
Forecasts and Assessments Presented to the Independent Power Producers’ Society of Ontario Pat Doran, Supervising Technical Officer Independent Electricity.
June 6, 2007 TAC Meeting NERC Registration Issues Andrew Gallo, Assistant General Counsel, Litigation and Business Operations ERCOT Legal Dept.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Special Protection Systems - Market Rule Amendment Submission Presentation to: Market Operations Standing Committee Barbara Reuber, Regulatory Affairs.
1 Adjusting the “Dispatch Instructions” to the Defined Metering Point (DMP). “Functional Deferral 6 (FD-06)” Market Operations Standing Committee (MOSC)
2013 Calendar Year Customer Survey Results
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
SUMMARY OF INFORMAL COMMENTS Temporary Waiver of Terms Regulations May 2006.
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
2014 Calendar Year Customer Survey Results. Background Open for comment February 12, 2015 through March 31, 2015 for evaluation of prior year – 21 close.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Reserves…Where are we??? Service Schedule C Service Schedule C C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
Renewable Generation Interconnection Ken Brunkenhoefer Distributed Generation Consultant
Business Continuity Program Orientation (insert presentation date) (This presentation is a template that requires adjustments to meet your needs)
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
Hour Ahead Dispatchable Loads Applicable Updates to Procedures Presentation to the Market Operations Standing Committee April 23, 2003
ISO Comparison – CAISO Alex Lee (ERCOT)
Project Cyber Security Order 706 Version 5 CIP Standards Potential to Adversely Impact ERCOT Black Start Capability.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Regulatory Planning for Supply to GTA & Toronto Areas Presentation to Regulatory Affairs Standing Committee May 14, 2003.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
1 New York State Reliability Council …….. Promoting Electric System Reliability in New York State Presentation to the MEUA Annual Meeting September.
MIG TF Voting Items Market Participant Notification Period (Transmission outage) – =1 Year Interconnection Date for Protocol Considerations – First Interconnection.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
14 Jan 2004Market Operations Standing Committee1 Special Protection Systems: Operational and Compensation Issues.
SEA in the Czech Republic Prague, 24 September 2008.
Long-Term Solution for Negative Generation Entergy Transmission AFC Stakeholder Meeting August 22, 2006.
Sep 22, 2003Market Operations Standing Committee of the IMO1 Change Management: Market Rules Update John MacKenzie, IMO.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
Coordinate On-The-Job Instruction Rick Bough Sarah Britton.
2004/06/0 2 Market Operations Standing Committee of the IMO1 Small Facilities - Technical Requirements Rhonda Wright.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
1 TAC Report to the ERCOT Board November 14, 2006.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Market Operations Standing Committee MOSC October 19, 2005 Pat Doran.
Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Proposed Revisions to Connection Assessment and Approval Process Market Manual 2.10 Bob Gibbons Manager - Long Term Forecasts and Assessments.
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
RA workshop presentation Karl Meeusen, Ph.D. Senior Advisor – Infrastructure Policy CPUC Resource Adequacy Workshop February 18, 2016.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline.
Wellness Plan Regulations June 2015.
FAIR LABOR STANDARDS ACT (FLSA)
Energy Day Strawman Proposal
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Transmission Workgroup – 1st December 2011
Coordinate Operations Standard
Electricity Price Increase 2008/9
R18011 discussion This document prepared for informational purposes only, and does not endorse a specific resolution to the request R18011.
Presentation transcript:

Outage Planning Subcommittee Mark Wilson

Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures Have met 6 times since the first meeting on June 10 Identified a list of 12 issues Using the issues list created a strawman

Outage Planning Subcommittee Strawman Provides a framework for stakeholdering Identifies critical issues and provides recommendations The intent is to identify the best possible solutions to identified issues without regard to implementation restrictions Identifies implementation issues with the proposed recommendations ( some of the proposed recommendations may not viable solutions)

Outage Planning Subcommittee Strawman Issues –Advance Outage Approval –Notification of At Risk Outages –Generator Testing –Categorizing Equipment for Outage Notice –Maintaining Timestamp Precedence –Transmission Outage Coordination –Flexibility/Discretion in Adequacy Assessments –Non Discretionary Outages

Outage Planning Subcommittee Advance Outage Approval To provide a mechanism that will allow outages to be given advance approval farther in advance, thereby reducing Market Participant risks, and allowing market participants to better plan their work and deploy work forces. Recommendation The IMO to provide advance approval for outages 14 days in advance of the start date of the outage. The IMO may withhold such approval only when security and adequacy assessments indicate that the planned outage has an adverse impact on the reliability of the IMO-controlled grid. If advance approval cannot be given 14 days prior to the commencement date of the outage, the outage will not be rejected but will be reassessed with approval given no later than 2 business days in advance of commencement date of the outage.

Outage Planning Subcommittee Notification of At Risk Outages Market Participants would like information regarding their time stamp position and total MW ahead in the queue as far in advance as possible. Recommendation The IMO will provide the time stamp position and total MW ahead in the queue for at risk outages with the same resolution as the adequacy assessments produced by the IMO: hourly for day 1 to 14, and daily for day 15 to 34.

Outage Planning Subcommittee Generator Testing Market Participants would like more flexibility for testing of generators as well as generator ramp-up schedules when returning from outage. Recommendation The following are proposed to supplement the present arrangements available to Market Participants: –Add aggregate groups for larger generators on a station basis, which would allow the MW output to be distributed within the aggregate during testing. –Make Market Rule changes which would allow Market Participants to offer the maximum achievable MW amount for the testing generator then use outage derating slips to achieve the required MW output during testing or ramp-up. Changes to offers will not be required.

Outage Planning Subcommittee Categorizing Equipment for Outage Notice To allow market participants to apply, within the short notice window, for outages that do not have a significant impact on the reliability of the IMO-controlled grid. Recommendation Allow MP’s to submit SNP outages based on predefined criteria. I.e. non-critical elements, < 50 Kv, single breakers at stations….

Outage Planning Subcommittee Maintaining Timestamp Precedence To allow Market Participants to maintain their time stamp precedence for outages that are revoked by the IMO then mutually agreed to be rescheduled less than three business days in advance (short notice request). Recommendation Change the Market Rules to allow Market Participants to maintain their time stamp precedence and eligibility for compensation for outages that are revoked by the IMO then mutually agreed to be rescheduled less than three business days in advance (short notice request).

Outage Planning Subcommittee Transmission Coordination The IMO to co-ordinate transmission system element outages that impact multiple market participants. Recommendation The OPS will be meeting in mid December to provide input to the OEB working group on transmission planning.

Outage Planning Subcommittee Flexibility / Discretion in Adequacy Assessments Market participants would like to be allowed to take outages where there is a shortfall in capacity or energy, and imports are available in excess of 700MW. Recommendation The IMO to develop the necessary criteria to allow discretion in approving outages where the frequency and size of capacity and/or energy shortfalls is acceptable.

Outage Planning Subcommittee Non Discretionary Outages There are requirements to have facilities tested/maintained within a certain period of time. When a planned outage(s) is rejected by the IMO for reliability concerns, the MP has no other option than to force the facility out of service in order to meet these requirements. Recommendation The IMO should be made aware of non-discretionary outages by the submitting market participant. The Comments field of the Outage Request form will be used to explain the sensitivity of the request, time limitations and reasons. The outage will maintain its planned character when it has to be taken within a specified timeframe, even where there are system adequacy concerns.

Outage Planning Subcommittee

Next Steps –IMO Assessment of recommendations –OPS to determine going forward strategy for the accepted recommendations Information All information can be found at the IMO web site for Consultation