Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.

Slides:



Advertisements
Similar presentations
March 22, 2011 Mauro Pivi SLAC ALCPG11 Eugene Oregon March 19-23, 2011 Working Group plans.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
9-12 April 2007 International Linear Collider DR electron cloud R&D effort: Clearing electrode and triangular fin M. Pivi T. Raubenheimer, J. Seeman, T.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Review of Electron Cloud R&D at KEKB 1.Diagnostics 1.Beam Size Blow-up 2.Beam Instabilities 3.Electron Density 4.SEY (Secondary Electron Yield) 2.Mitigation.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
9-12 April 2007 International Linear Collider DR electron cloud R&D effort 1 st part: Tests in PEP-II M. Pivi L. Wang, D. Arnett, G. Collet, R. Kirby,
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
1 Ecloud Simulations Group: Summary Miguel A. Furman Lawrence Berkeley National Laboratory Berkeley, CA , U.S.A. ILCDR08 Workshop Cornell University,
Towards a Coordinated R&D Plan for ILC Damping Rings Impedance Issues Andy Wolski University of Liverpool and the Cockcroft Institute 28 September, 2006.
ILC Damping Ring update on collective effect electron cloud R&D Mauro Pivi SLAC ILCDR06 Cornell Workshop September 26-28, 2006.
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
Webex Electron Cloud Evaluations for ILC DR Mauro Pivi on behalf of the ILC Electron Cloud Working Group - by Webex - KILC12 – Daegu Korea April 25, 2012.
Updates of Electron Cloud Studies at KEKB Topics in 2008 Measurement of electron density in solenoid and Q field Mitigation using clearing electrode in.
EC R&D at SLAC, KEK, INFN, CERN –Details from KEK, INFN and CERN EC R&D CesrTA –Examples of RFA and SPU studies –Survey of results on mitigations –Buildup.
30 May – 2 June, 2007 ILC 2007 DESY, Germany ILC R&D plan WP 2.2.3: Electron cloud M. Pivi -SLAC ILC 2007 Hamburg, Germany.
ILC damping ring Workshop, Dec 19, 2007, KEK, L. WANG Ecloud simulation 2007 ILC Damping Rings Mini-Workshop December, 2007 Lanfa Wang, SLAC.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
March 23, 2010 CMAD a tracking and e-cloud beam instability parallel code (M.Pivi SLAC) Taking MAD(X) optics file at input, thus tracking the beam in a.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
ILC Damping Ring Collective Instability update: Electron Cloud Mauro Pivi SLAC ILC Vancouver Meeting July 19-22, 2006.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
2008/7/281 ILCDR08 Report - Electron Cloud Session – Univ. Y. Suetsugu, KEK.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Nov 17, 2009 Webex Assessing the 3.2 km Ring feasibility: Simulation parameters for electron cloud Build-up and Instability estimation LC DR Electron Cloud.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
Electron Cloud R&D at SLAC Johnny Ng SLAC DOE HEP Review July 7 – 9, 2008.
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
MAC - 26 April 2007 Global Design Effort 1 RDB S3 Damping Rings R&D Andy Wolski The Cockcroft Institute, and the University of Liverpool on behalf of the.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
5 November, 2007 DR - Kick Off Meeting 1 Electron Cloud Work Package M. Pivi Damping Rings EDR Kick-Off Meeting Daresbury, United Kingdom 5-7 November.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
PEP-II test chambers installation
International Linear Collider R&D on electron cloud (SLAC)
Groove Mitigation and Plans
Electron Cloud Effects in SuperB
Electron Cloud and Ion Experimental Program
Electron Cloud R&D for Future Linear Colliders
Work In January 2007, we installed 5 chambers in a straight Field Free region of PEP-II Low Energy Ring (LER). Closest bend at ~18 meters upstream: 1 stainless.
Agenda Today: CesrTA and SuperKEKB simulations - Ohmi
CesrTA Experimental Schedule and Priorities
ILC Damping Ring electron cloud WG effort
Electron Clouds at SLAC
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density. Solenoids decrease the cloud density in DRIFT regions, where they are only effective. Compare options LowQ and LowQ+train gaps. All cases wiggler aperture 46mm.

Electron Cloud: need for mitigation Outstanding Questions about key remedies: 1)Are thin film coatings effective to stably decrease SEY < 1.2 ? Is “conditioning” effective to stably decrease SEY < 1.2 ? 2) Fins: are fin-chambers viable to suppressing electron cloud in magnets ? (resolve simulation discrepancy) 3) Clearing electrodes: is RF power load tolerable ? are impedance and HOM tolerable ?

ILC DAMPING RING R&D OBJECTIVES Electron Cloud Characterize electron-cloud build-up Required for Baseline Priority: Develop electron-cloud suppression techniques Required for Baseline Priority: Develop modeling tools for e-cloud instabilities Required for Baseline Priority: Determine electron-cloud instability thresholds Required for Baseline Priority: Ion Effects Characterize ion effects Required for Baseline Priority: Specify techniques for suppressing ion effects Required for Baseline Priority: 1 COLLECTIVE INSTABILITIES: PRIORITIES

4 Electron cloud issues: Milestones 1. Test clearing electrodes (a) characterize impedance, HOM, power load (b) machine studies 2. Test groove concepts (a) characterize impedance, HOM, power load (b) machine studies 3. Test coating techniques (a) Secondary electron yield measurements (b) machine studies 4. Characterize the electron cloud build up 5. Characterize the electron cloud instability 6. Integrated modeling: cloud, impedance, space charge.. Investigate alternative solutions

5 Ion issues: Milestones 1. Characterize ion effects 2. Specify techniques for suppressing ion effects

R&D MILENSTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)

7 Electron cloud issues: Milestones Test clearing electrodes (a) characterize impedance, HOM, power load analytical estimates simulate MAFIA, A. Krasnyhk, Cho Ng simulate with VORPAL, V. Ivanov (?) simulate, F. Caspers (b) machine studies test in HCX in a quadrupole or drift region, A. Molvik test in ESA preliminary to PEPII installation, M. Pivi, test in PEPII in bend chicane, M. Pivi test in CESR in wiggler section, M. Palmer test in KEKB arc section bend or wiggler section, Y. Suetsugu test in LHC arc section bend section, F. Caspers (c)develop diagnostic electron cloud diagnostic for test chambers, A. Molvik electron cloud diagnostic for test chambers, R. Macek

8 Electron cloud issues: Milestones Test groove concepts (a) characterize impedance, HOM K. Bane numerical estimation, G. Stupakov analytical (b) machine studies rectangular grooves drift SLAC, M. Pivi triangular grooves in bend section SLAC, M.Pivi triangular grooves in wiggler section CESR, M. Palmer (c)develop diagnostic electron cloud diagnostic for test chambers, A. Molvik electron cloud diagnostic for test chambers, R. Macek

9 Electron cloud issues: Milestones Test coating techniques and determine conditioning effectiveness (a) Secondary electron yield measurements measuring SEY, Y. Suetsugu measuring SEY, R. Kirby measuring SEY, (N. Hilleret) (b) machine studies installation of test chambers in KEKB Cu, TiN, NEG, Y. Suetsugu SEY conditioning test in PEP-II, M. Pivi Installation of chambers in CESR, M. Palmer (c) manufacturing and diagnostics building chambers for installations, S. Marks

10 Electron cloud issues: Investigators Characterize the electron cloud build up wiggler 3D simulations CLOUDLAND, L. Wang wiggler 3D simulations WARP/POSINST, C. Celata characterize ecloud in quadrupole, M. Pivi characterize ecloud in quadrupole, C. Celata fill pattern as possible mitigation, M. Venturini compile e-cloud density over the machine, M. Pivi optimize clearing electrode design, (Cornell) optimize clearing electrode design, L. Wang optimize clearing grooves design, W. Bruns optimize clearing grooves design, L. Wang optimize clearing grooves design, M. Venturini

11 Electron cloud issues: Milestones Characterize the electron cloud instability Characterize single-bunch instability PEHTS, K. Ohmi Characterize single-bunch instability HEAD-TAIL, F. Zimmermann Characterize single-bunch instability quasi-static QUICKPIC, P. Spentzouris Characterize single-bunch instability in wiggler 3D WARP, C. Celata Characterize single-bunch instability in lattice CMAD, M. Pivi

12 Electron cloud issues: Milestones 6. Integrated modeling Characterize instability FRAMEWORK, P. Spentzouris

13 Electron cloud issues: Timescale Test clearing electrodes In PEP-II by 2007 In CESR by 2008 Test groove concepts In PEP-II by 2007 In CESR by 2008 Test coating techniques In KEKB, by 2007 In PEPII, by 2007 In CESR, by 2008 Characterize the electron cloud build up Compile list of electron cloud density in ring by 2007 Characterize the electron cloud instability by TDR Integrated modeling by TDR

14 Ion issues: Milestones 1. Characterize ion effects to be discussed 2. Specify techniques for suppressing ion effects to be discussed

15 Ion issues: Timescale 1. Characterize ion effects by date … 2. Specify techniques for suppressing ion effects by date …