WF on MCOT and CWS for LBT priority classes

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1123r0 Submission September 2010 Zhu/Kim et al 1 Date: Authors: [TXOP Sharing for DL MU-MIMO Support]
Advertisements

WF on design of physical downlink control channel for MTC CATT, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, ETRI, InterDigital, MediaTek, NTT.
WF on PBCH Coverage Enhancement
Way forward on eIMTA signaling to support up to 32 component carriers
Discussion of LAA LBT Categories
Doc.: IEEE /0007r0 SubmissionAlireza Babaei, CableLabsSlide 1 Comments on LAA EVM Notice: This document has been prepared to assist IEEE
Evaluate IEEE e EDCA Performance Tyler Ngo CMPE 257.
Month Year doc.: IEEE yy/xxxxr0 November 2014
WF on DL LBT Scheme for DRS
3GPP TSG RAN WG1 # R1-15xxxx Fukuoka, Japan 25th – 29th May 2015
Study on Coexistence of LAA and WiFi
Doc.: IEEE /0063r0 Submission July 2015 Andrew Myles, CiscoSlide 1 Proposal for IEEE 802 submission to 3GPP 14 July 2015 Authors: NameCompanyPhone .
Doc.: IEEE /0105r1 Submission July 2006 Ying-Chang Liang, I2RSlide 1 ADAPTIVE TDD IEEE P Wireless RANs Date: Authors: Notice:
Way forward on TBS determination in initial partial subframes
Doc.: IEEE /0079r0 Submission September 2015 Andrew Myles (Cisco)Slide 1 Discussion of issues related to EN revision 16 September 2015.
WF on CQI Table for eMTC ZTE, Sony, Nokia, Ericsson, Samsung… R GPP TSG RAN WG1 #83 Anaheim, USA, 15th – 22nd November, 2015 Agenda item
Doc.: IEEE /0079r1 Submission September 2015 Andrew Myles (Cisco)Slide 1 Discussion of issues related to EN revision 16 September 2015.
WF on Support of EBF/FD-MIMO Features in TM9
WF on Regulation and MCOT
WF on SIB1bis Transmission
WF on LAA DL Multi-Channel LBT
Doc.: IEEE /0063r5 Submission August 2015 IEEE 802Slide 1 Proposal for IEEE 802 submission to 3GPP Workshop on LAA in August August 2015.
Proposal for NB-IoT single-tone only UE
Doc.: IEEE /0008r1 Submission Jan 2016 Andrew Myles, CiscoSlide 1 Proposed feedback from IEEE 802 on 3GPP LAA CRs 18 Jan 2015 Authors: NameCompanyPhone .
Doc.: IEEE /0024r0 Submission Feedback on 3GPP CRs: LAA Multi-Channel Access and Energy Detect (ED) Coexistence Slide 1 Date: Authors:
November 2000 Jin-Meng Ho, Texas InstrumentsSlide 1 doc.: IEEE /367 Submission p-DCF for Prioritized MAC Service Jin-Meng Ho, Sid Schrum, and.
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
Submission doc.: IEEE /0662r0 May, 2016 Jing Ma, NICTSlide 1 Further consideration on channel access rule to facilitate MU transmission opportunity.
WF on MCOT limit Signaling and Modifying LBT type Ericsson, … 3GPP TSG RAN WG1 #85 R1-16xxxx Nanjing, China 23 rd – 27 th May 2016 Agenda item:
Offline discussion on remaining details on RRM measurements
WF on Bandwidth Part for DL common channel
WF on RA-RNTI design 3GPP TSG RAN WG1 Meeting NR#3 R1-171xxxx
Month Year doc: IEEE /xxxxr0
Offline Discussion on remaining details about RACH Procedure
Balancing Uplink and Downlink Delay of VoIP Traffic in WLANs
Comments on LAA EVM Date: Authors: January 2015 Month Year
Proposal for IEEE 802 submission to 3GPP
UL OFDMA Random Access Control
3GPP RAN1 #90 meeting summary on LAA Enhancements
WF on Beam Indication for Beam Management
WF on NB-IoT Radio Link Monitoring Performance Test Procedure
3GPP TSG RAN WG1 Meeting #90bis
WF on Beam failure recovery
Illustration of RMSI monitoring windows (TDM)
WF on SS Block Index Reporting through RACH Procedure
WF on transmit diversity for DFTsOFDM
Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel]
WF on beam reporting CATT, Intel R1-17xxxxx
WF on Beam-Related Indication
WF on CSI timing offset for PUSCH
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
Motorola Mobility, Lenovo, …
WF on UE mandatory channel bandwidth for NR bands
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
WF on 4Tx UL Codebook For CP-OFDM
Summary of Offline Discussion on RMSI CORESET Configuration (Part 2)
QoS Handling of Trigger Frame
WF on UL Beam Management
WF on UL Beam Management
WF on CB-group based retransmission
Speaker:Fu-Yuan Chuang Advisor:Ho-Ting Wu Date:
WF on LTE-NR Coexistence
Comments on LAA EVM Date: Authors: January 2015 Month Year
3GPP RAN1 status on NR-Unlicensed
Comments on LAA EVM Date: Authors: January 2015 Month Year
Coex Simulation and Analysis
Status of NR-U - Wi-Fi coexistence
Jing Sun, Qualcomm Incorporated Rapporteur of Rel.16 NR-U Work Item
Month Year doc.: IEEE /1081r0 May, 2016
Presentation transcript:

WF on MCOT and CWS for LBT priority classes 3GPP TSG RAN WG1 #83 R1-15xxxx Anaheim, USA, 15th - 22th November 2015 Agenda item: 6.2.3.1 Document for decision WF on MCOT and CWS for LBT priority classes Ericsson, …

Background Agreements: A DL category 4 LBT priority class is defined at least by the minimum and maximum contention window (CW) sizes and the number of CCA slots in the defer period in Table below where the smaller the LBT priority class number, the higher the priority. In the table CWmin, CWmax and n refer to the minimum contention window size, the maximum contention window size and the number of CCA slots in the defer period, respectively. Rel-13 supports at least DL LBT priority class 3 Use of different LBT parameters than the DL LBT priority class 3 will be supported in Rel-13 if RAN2 and RAN1 finds the associated work feasible within Rel-13 time frame For a DL burst transmission containing PDSCH, an LAA SCell operates with a single DL category 4 LBT priority class at a time when performing random backoff. Best effort traffic shall not use a DL LBT priority class with higher priority than the DL LBT priority class 3. Note: The Maximum channel occupancy time (and whether different values per LBT class are needed) requires further discussion FFS if an intended DL transmission burst with PDSCH contains traffic corresponding to different LBT priority classes, the lowest priority shall be used for the LBT parameters. FFS if more DL LBT priority classes are needed. Inform RAN2 of the DL LBT priority classes and request them to take this into consideration in their associated work. FFS on the DL LBT priority class for UL grant only transmission LBT priority class CWmin CWmax n 1 3 7 2 15 63 4 1023

Proposal Rel-13 LBT supports four LBT priority classes For the LBT priority classes 1 to 4, LAA supports the Maximum Channel Occupancy Time (MCOT) values shown in the table below, after a successful LBT operation on the channel. LAA supports the following sets of CW sizes in the table below. LBT priority class CWmin CWmax n MCOT Set of CW sizes 1 3 7 2ms {3,7} 2 15 3ms {7,15} 63 FFS: 10 or 8 or 6ms {15,31,63} 4 1023 FFS: 10 or 8 or 6 ms {15,31,63,127,255,511,1023}

Proposal If an intended DL transmission burst with PDSCH contains traffic corresponding to different LBT priority classes, and LBT parameters corresponding to a LBT priority class other than the lowest priority class in the intended burst are used to obtain access to the channel, the transmission duration shall not be longer than the transmission duration needed to transmit only the traffic corresponding to the LBT priority classes that are the same or higher than the LBT priority class used to gain channel access. If an eNB uses only one random backoff counter (single access engine), the LBT parameters used can only be modified at the start of an extended CCA operation requiring the generation of a new random backoff counter, N.