Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t DBES GGUS Ticket review T1 Service Coordination Meeting 2010/10/28.

Slides:



Advertisements
Similar presentations
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES GGUS – CERN SNOW (Service Now) interface 3 rd update For T1SCM.
Advertisements

Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES GGUS – CERN SNOW (Service Now) interface 2 nd update For T1SCM.
GGUS summary (5 weeks) VOUserTeamAlarmTotal ALICE2002 ATLAS CMS6208 LHCb Totals
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES News on monitoring for CMS distributed computing operations Andrea.
Summary of issues and questions raised. FTS workshop for experiment integrators Summary of use  Generally positive response on current state!  Now the.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES WLCG operations: communication channels Andrea Sciabà WLCG operations.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
CERN IT Department CH-1211 Geneva 23 Switzerland t The Experiment Dashboard ISGC th April 2008 Pablo Saiz, Julia Andreeva, Benjamin.
CERN IT Department CH-1211 Genève 23 Switzerland t EIS section review of recent activities Harry Renshall Andrea Sciabà IT-GS group meeting.
GGUS summary (4 weeks) VOUserTeamAlarmTotal ALICE ATLAS CMS LHCb Totals
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES P. Saiz (IT-ES) AliEn job agents.
CERN IT Department CH-1211 Genève 23 Switzerland t Internet Services Job Monitoring for the LHC experiments Irina Sidorova (CERN, JINR) on.
GGUS summary ( 4 weeks ) VOUserTeamAlarmTotal ALICE ATLAS CMS LHCb Totals 1.
WLCG Service Report ~~~ WLCG Management Board, 24 th November
Enabling Grids for E-sciencE System Analysis Working Group and Experiment Dashboard Julia Andreeva CERN Grid Operations Workshop – June, Stockholm.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES GGUS Overview ROC_LA CERN
WLCG Service Report ~~~ WLCG Management Board, 9 th August
1 LHCb on the Grid Raja Nandakumar (with contributions from Greig Cowan) ‏ GridPP21 3 rd September 2008.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES A. Abramyan, S. Bagansco, S. Banerjee, L. Betev, F. Carminati,
CERN IT Department CH-1211 Geneva 23 Switzerland t CCRC’08 Tools for measuring our progress CCRC’08 F2F 5 th February 2008 James Casey, IT-GS-MND.
CERN IT Department CH-1211 Genève 23 Switzerland t Internet Services Job Priorities update Andrea Sciabà IT/GS Ulrich Schwickerath IT/FIO.
8 th CIC on Duty meeting Krakow /2006 Enabling Grids for E-sciencE Feedback from SEE first COD shift Emanoil Atanassov Todor Gurov.
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT DPM / LFC and FTS news Ricardo Rocha ( on behalf of the IT/GT/DMS.
Handling ALARMs for Critical Services Maria Girone, IT-ES Maite Barroso IT-PES, Maria Dimou, IT-ES WLCG MB, 19 February 2013.
GGUS Slides for the 2012/07/24 MB Drills cover the period of 2012/06/18 (Monday) until 2012/07/12 given my holiday starting the following weekend. Remove.
GGUS summary (4 weeks) VOUserTeamAlarmTotal ALICE1102 ATLAS CMS LHCb Totals
WLCG Service Report ~~~ WLCG Management Board, 7 th September 2010 Updated 8 th September
CERN IT Department CH-1211 Geneva 23 Switzerland t A proposal for improving Job Reliability Monitoring GDB 2 nd April 2008.
GGUS summary (4 weeks) VOUserTeamAlarmTotal ALICE4015 ATLAS CMS LHCb Totals
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES Andrea Sciabà Hammercloud and Nagios Dan Van Der Ster Nicolò Magini.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Communication tools between Grid Virtual.
WLCG Service Report ~~~ WLCG Management Board, 18 th September
WLCG Service Report ~~~ WLCG Management Board, 23 rd November
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Middleware Update Maria Alandes Pradillo.
GGUS summary (3 weeks) VOUserTeamAlarmTotal ALICE4004 ATLAS CMS LHCb Totals
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT Grid Technology SL Section Software Lifecycle Duarte Meneses.
INFSO-RI Enabling Grids for E-sciencE gLite Certification and Deployment Process Markus Schulz, SA1, CERN EGEE 1 st EU Review 9-11/02/2005.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES Andrea Sciabà Ideal information system - CMS Andrea Sciabà IS.
WLCG Operations Coordination Andrea Sciabà IT/SDC 10 th July 2013.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Requirements Status EGI.eu UCB
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
WLCG Service Report ~~~ WLCG Management Board, 14 th February
CERN - IT Department CH-1211 Genève 23 Switzerland t Grid Reliability Pablo Saiz On behalf of the Dashboard team: J. Andreeva, C. Cirstoiu,
WLCG Service Report Jean-Philippe Baud ~~~ WLCG Management Board, 24 th August
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
CERN - IT Department CH-1211 Genève 23 Switzerland t IT-GD-OPS attendance to EGEE’09 IT/GD Group Meeting, 09 October 2009.
SAM Status Update Piotr Nyczyk LCG Management Board CERN, 5 June 2007.
Ian Bird LCG Project Leader Status of EGEE  EGI transition WLCG LHCC Referees’ meeting 21 st September 2009.
WLCG Service Report ~~~ WLCG Management Board, 10 th November
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES The Common Solutions Strategy of the Experiment Support group.
GGUS summary (3 weeks) VOUserTeamAlarmTotal ALICE7029 ATLAS CMS LHCb Totals
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GGUS Report Generator Günter Grein, KIT Helmut Dres, KIT Torsten Antoni,
GGUS summary (4 weeks) VOUserTeamAlarmTotal ALICE5016 ATLAS CMS6118 LHCb Totals
CERN IT Department CH-1211 Genève 23 Switzerland t CMS SAM Testing Andrea Sciabà Grid Deployment Board May 14, 2008.
Maria Alandes Pradillo, CERN Training on GLUE 2 information validation EGI Technical Forum September 2013.
CERN IT Department CH-1211 Genève 23 Switzerland t DPM status and plans David Smith CERN, IT-DM-SGT Pre-GDB, Grid Storage Services 11 November.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
GGUS summary ( 9 weeks ) VOUserTeamAlarmTotal ALICE2608 ATLAS CMS LHCb Totals
LCG Introduction John Gordon, STFC GDB December 7 th 2010.
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT Middleware Update GDB, 9 th February 2011 Slides by Maria Alandes.
The EMT Oliver Keeble, SA3 CERN.
Andreas Unterkircher CERN Grid Deployment
gLite->EMI2/UMD2 transition
1 VO User Team Alarm Total ALICE ATLAS CMS
1 VO User Team Alarm Total ALICE ATLAS CMS
1 VO User Team Alarm Total ALICE 2 ATLAS CMS LHCb 14
Take the summary from the table on
Cristina del Cano Novales STFC - RAL
Presentation transcript:

Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES GGUS Ticket review T1 Service Coordination Meeting 2010/10/28

CERN IT Department CH-1211 Geneva 23 Switzerland t ES 2Author etc GGUS tickets of concern to the experiments: –ATLAS: CNAF-BNL GGUS:61440 CNAF: transfer problems to BNL. Was presented at this meeting 3 times in 2months!GGUS: CMS: -GGUS:61706 CERN: Maradona error on CE. Was presented at this meeting also on 2010/10/07.GGUS: GGUS:62696 CERN: xrootd errors. Was presented at this meeting also on 2010/10/07.GGUS: GGUS:63450 CERN: SLS links missing from Critical Service map.GGUS: LHCb: -GGUS:59880 IN2P3: Shared area performance problems.GGUS: GGUS:62800 IN2P3: Shared area problems.GGUS:62800 Summary

CERN IT Department CH-1211 Geneva 23 Switzerland t ES 3Author etc GGUS #Assigned ToCreation Date Last UpdateStatusComment 61440ROC_Italy2010/08/232010/10/25Re-opened.TEAM ticket upgraded to urgent! Transfer errors between DATADISKS. Re-opened until NREN actions that improved performance are explicitly recorded for full understandin g. ATLAS CNAF-BNL Transfer

CERN IT Department CH-1211 Geneva 23 Switzerland t ES 4Author etc GGUS # Assigned To Creation Date Last Update StatusComment 61706ROC_CERN2010/08/312010/10/14On holdUser ticket ‘less urgent’. Errors still fluctuate. CERN IT services wait for hotfix from vendor (Platform LSF). CMS CERN Maradona errors

CERN IT Department CH-1211 Geneva 23 Switzerland t ES 5Author etc GGUS # Assigned To Creation Date Last Update StatusComment 62696ROC_CERN2010/10/022010/10/20In progress TEAM ticket. Less urgent! Jobs were failing to open file even if on disk. Maybe file in a state not recognisable by the xroot redirector? CERN Services applied fix to the e retry-after-server- error logic. CMS to give feedback on error frequency now and further patches, if needed. CMS xrootd errors

CERN IT Department CH-1211 Geneva 23 Switzerland t ES 6Author etc GGUS # Assigned To Creation Date Last Update StatusComment 63450ROC_CERN2010/10/222010/10/27In progress User ticket. urgent! CMS uses a different to the default ‘Critical Service map’. CERN IT specialist on Service Level Status investigating the difference between the 2 maps (URLs). CMS missing links to SLS

CERN IT Department CH-1211 Geneva 23 Switzerland t ES 7Author etc GGUS # Assigned To Creation Date Last Update StatusComment 59880NGI_France2010/07/082010/10/28In progress User ticket. Very urgent! LHCb jobs failing at IN2P3 due to shared area problems. LHCb software installation erros also met but they should be tracked via a different ticket. LHCb jobs IN2P3 due to shared area problem

CERN IT Department CH-1211 Geneva 23 Switzerland t ES 8Author etc GGUS # Assigned To Creation Date Last Update StatusComment 62800NGI_France2010/10/062010/10/28Waiting for reply! TEAM ticket. Top priority! LHCb is asked to re-try installing their software,using a different afs file path for read and write operations. LHCb software installation problems at IN2P3

CERN IT Department CH-1211 Geneva 23 Switzerland t ES 9Author etcDimou M. Other GGUS issues 1.21 new GGUS Support Units entered operation with GGUS 8.0 on 2010/10/27. 2.No impact to GGUS ticket submitters who select to Notify a given Site, i.e.most of WLCG tickets. 3.But, if the problem is related to the product itself and not to the site, it is better to open a ticket and let the TPM assign it. 4.New project structures (EGI/EMI) require the assignment to middleware SUs only by the 2 nd level (DMSU=Deployed Middleware SU). No impact to tickets in category 2 (above) but no more cross-assignment possible, for ex. for tickets that turn out to be for any gLite package. Planned for the next GGUS Rel. Details in savannah support # savannah support #117155

CERN IT Department CH-1211 Geneva 23 Switzerland t ES 10Author etc New GGUS SUs New 2nd level SUs: - "VO Services" for questions by VO Managers on EGI services. - ARC_DEPLOY - SAGA-SD (will phase-out R-GMA eventually) New 3rd level SUs: Middleware clients: - gLite UI - gLite WN - gLite VOBOX Under 3rd level experts: - EMI Testbeds - EMI QA Tools Batch systems' integration (utils): - gLite Torque Utils - gLite SGE Utils - gLite Condor Utils - gLite LSF Utils

CERN IT Department CH-1211 Geneva 23 Switzerland t ES 11Author etc More new GGUS 3rd level SUs Under project EMI: - ARC - UNICORE-Client - UNICORE-Server - Proxyrenewal - Gridsite - gLite Yaim Core - gLite Java Security - gLite Hydra - gLite Identity "Other projects": - IGE (Initiative for Globus in Europe)