Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.

Slides:



Advertisements
Similar presentations
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
Advertisements

The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Silvia Zorzetti. PACMAN CLICScientific ProjectThe Team PACMAN (Particle Accelerator Components Metrology and Alignment to the Nanometer Scale) Ph.D. training.
Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
LCLS LCLS-II Survey & Alignment
Alignment Strategy for Light Source Facilities LCLS Case Catherine LeCocq SLAC 03/31/08.
Use of a commercial laser tracker for optical alignment James H. Burge, Peng Su, Chunyu Zhao, Tom Zobrist College of Optical Sciences Steward Observatory.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
1 Institute of High Energy Physics 13/09/2010 Comparison and Study in Measurement Accuracy of Height Difference between Laser Tracker and Level Men LingLing.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
H. SCHMICKLER Alignment challenges for a future linear collider.
ALIGNMENT DESIGN AND STATUS OF TAIWAN PHOTON SOURCE WEI-YANG LAI October,
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
The Mission: In order to produce luminosities appropriate for Run II levels, a better understanding of the Tevatron’s orbit would be required. To do that,
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
2 nd Supervisory Board Package 3.1 Summary OUTLINE University Secondment PACMAN alignment bench 25/09/2015 by Iordan Doytchinov.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
SURVEY EXISTING TECHNIQUES AND REQUIREMENTS Jean-Christophe GAYDE, Pascal SAINVITU (CERN EN-MEF-SU-EM) Infrastructure For LHCb Upgrade Workshop February.
Recommendations on Supports and Adjustment systems for ESS LINAC Components Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
The NOnA Experiment Survey of the NOvA Far Detector Gary Feldman
Company LOGO Technology and Application of Laser Tracker in Large Space Measurement Yang Fan, Li Guangyun, Fan Baixing IWAA2014 in Beijing, China Zhengzhou.
1 Research on laser tracker measurement accuracy and data processing Liang Jing IHEP,CHINA
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Alignment & Vibration Issues for SuperB M. Esposito, S. Tomassini, INFN-LNF SuperB Workshop – SLAC – October 7th, 2009.
D. Missiaen – 13/06/2014. D. Missiaen 13/06/ Agenda Introduction to alignment techniques Reserved space for Survey The CERN Co-ordinates System.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
MMT Retreat Technical Services across ESS Peter Rådahl
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
The Alignment of DTL in CSNS Institute of High Energy Physics, CAS KE Zhiyong
Laser beam trajectory measurement with a CCD camera Georg Gassner.
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
ALIGNMENT OF THE NEW TRIPLETS
on behalf of the CLIC active pre-alignment team
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Recent developments on micro-triangulation
Workshop on Tau-Charm at High Luminosity
Ddd 4-Slides Challenge Silvia Zorzetti.
Magnetic Measurements For The LCLS Undulator System
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
LCLS Undulator Fiducialization
MEASUREMENT AND INSPECTION
FAIR magnets fiducialisation WP 7.5
Torsten Bräuer and the Metrologyteam
SPEAR Summer/Fall Downtime Alignment Schedule
INSTITUTE OF HIGH ENERGY PHYSICS CEPC Survey and Alignment
Simplified Procedure Draft
Presentation transcript:

Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group

2 Survey & Alignment Strategy at ESS Based on 3D free stationing technique with least squares adjustment calculus Instrumentation: laser tracker, total station, digital and optical levels, 3D Arm, GPS, metrology software. Two reference networks connected: - One outside Geodetic Pillar Network (mm accuracy) Measurements: GPS, Total Stations, Digital Levels. - One internal reference network (0.1 mm accuracy) Measurements: Laser Trackers, Total Stations, Digital Levels

3 Survey & Alignment Strategy at ESS 3D Free Stationing Technique Tunnel Nominal beam axis No Forced Centering for instruments We place the instruments where convenient

4 Fiducialization 4 Fiducialization : report the sensitive part or axis of a component to external references used to align the component. Mechanical axis used for construction / assembly Sensitive Axis: magnetic axis, accelerating axis… Fiducials to receive prism Laser tracker Fiducialization Bench Process

5 Fiducialization Fiducials ESS H7 Machined Hole Cone directly machined on the component Assembly glued with M6 Hole 1,5” Prism Cone Part M6 Part

6 Next Steps Provide a 3D model of complete assembly:We can then validate: -Position/ Type/ Number of fiducials -Adjustment System approach Define and describe the fiducialization process for each component/assembly: -Type of instrument : Laser tracker, 3D arm, CMM, optical tools… -Where and how ?: on magnetic measurement bench, relying on mechanical tolerances…. -Coordinates expressed in a well define coordinate system. (TBD) Please use our support and expertise for this !! We can provide you with instruments, definition of processes … We can visit you when convenient But all this need to be planned in advance!!