Why Bond Forms Matter… A Practical Guide to Better Bonding Presenters: Joanne S. Brooks, Esq., Vice President and Counsel, The Surety and Fidelity Association.

Slides:



Advertisements
Similar presentations
“Words” Do Matter in Public Works Contracts
Advertisements

Contracts for Builders Ross Kinzler, Executive Director.
A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
CARLIN LAW GROUP, APC Dispute Resolution Procedures Contract Claims Requirements Public Contract Code § (schools) Public Contract Code §20104 Government.
1. Among the most important advisors to a construction firm are: –Professional surety bond producer –Knowledgeable construction/surety attorney –Construction-oriented.
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2014 NASBP.
CARLIN LAW GROUP, APC (619) Know Your Indemnity Obligation Know Your Risk Know Your Insurance Company by KEVIN R. CARLIN, ESQ.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
Surety Bond Claims State of Colorado 05/15/2013. State of Colorado Surety Bond Overview Construction Contract Surety Bonds  Bid – Guarantees bidder will.
Presented By: John D. Miller
Subcontractors بسم الله الرحمن الرحيم Islamic university in Gaza Collage of Engineering Postgraduate program Construction Management Prepared by: Eng.
1 MOSS ADAMS LLP | 1 Case Studies in Contract Close Out Audits May 2014.
SURETY BONDS Managing the Risk of Contractor Default.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Payment Systems The Credit Card System. Basic Concepts.
Darren R. Krattli Eisenhower Carlson PLLC Mechanics’ and Materialmen’s Liens: Start to Finish RCW Main: (253) Direct: (253)
Topic 11. Insurance Policy Provisions BUS 200 Introduction to Risk Management and Insurance Jin Park.
Time for a new standard - AS General Conditions of Contract
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
Topic 9. Insurance Policy Provisions BUS 200 Introduction to Risk Management and Insurance Jin Park.
The Islamic University of Gaza Engineering Faculty
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
Chapter 17 Construction Bonds Vanessa S. Werden
111 Con E 221 Review graded exams on Monday Review presentation guideline for term papers Finalize presentation schedule on Monday.
SURETY BONDS 101 The Basics of Bonding. Surety Bonds 4 A surety bond is an instrument under which one party guarantees to another that a third will perform.
Surety Bonds The Sensible Choice For Managing Risk.
Surety Bonds The Sensible Choice For Managing Risk.
05/12/08 Insurance Risk/Regulatory Compliance Department Las Vegas Division.
Mechanic’s Lien DENIZE & SARAH. WHAT IS A MECHANIC’S LIEN  A Mechanic’s Lien is a security interest in the title to property for the benefit of those.
Surety Basics 2013 Construction Opportunities Conference
The Building and Construction Industry Security of Payment Act 2002 (Vic) made simple Western Suburbs Law Association Tuesday 4 June 2013 Michael Heaton.
Construction Contracts What You Need to Know March 19, 2015.
Changes To California’s Mechanic’s Lien Laws: Effective January 1, 2012 and July 1, 2012 Hanson Bridgett LLP.
Surety Bonds Managing the Risk of Contractor Default.
 A set of contract documents that, through consensus, balance interests and promote best practices among all parties involved in the construction project.
Protection for Third Party Vendor Contracts Surety Bonds For Public Entities.
Richard E. Thompson II, Esq.
© Roetzel & Andress, LPA STATUTORY CHANGES IN FLORIDA’S CONSTRUCTION LAWS July 2012 Presented by: Thomas P. Wert, Esq.
Contract Bond Forms What to Look For and What Might be Missing Presented by Steve Nelson EVP & General Counsel SureTec Insurance Company 1.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Understanding Surety Concerns with the AIA A312 Payment Bond Form Presenter: [Insert Name]
CASUALTY LOSS RESERVE SEMINAR SESSION 2 SEPTEMBER 10, 2001 CONTRACT SURETY CASE RESERVES STEPHEN J. TRECKER SENIOR VICE PRESIDENT XL SURETY PHILADELPHIA,
Highway to Hell or Strawberry Fields Forever Identifying and Dealing with Avoidable Project Risk.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
27-1 Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
BIDDING PRIVATE AND PUBLIC WORK Major Differences between Private and Public How to determine whether a project is Public or Private: "Who owns the dirt"
Construction & Beyond Surety Bonds For Public Works.
Surety Bonds The Sensible Choice for Managing Risk.
CONSTRUCTION CHANGE DIRECTIVES UNDER THE NEW PUBLIC BID LAWS Speaker: STEVEN B. LOEB, Esq. BREAZEALE SACHSE & WILSON, LLP Tel: (225)
NASP 2009 Annual Conference. Advanced Subrogation: Roadblocks & Speed Bumps Harris E. Berenson, Esq., Liberty Mutual Insurance Company Samuel J. Pace,
Presented by: Brienne Berscheid Assistant Vice President & Construction Escrow Underwriter Construction Escrow Documentation Requirements.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
MECHANICS LIENS: NEW CHANGES & OLD ISSUES Ryan Hiss, Lyman & Nielsen, LLC Brienne Berscheid, Chicago Title Insurance Company.
It Starts with Being Proactive Regarding Lien/Bond Rights   Preserving lien / bond rights allows YOU to secure (collateralize) potential nonpayment against.
Lecture 11: Methods of Payments p. 2 Bank Guarantees
© 2006 Gibbs, Giden, Locher & Turner LLP California Public Works Remedies 1. Payment Bond 2. Stop Notice Claim.
EQUIPMENT CONTRACT RUS FORM 395
Five Things Every Agent and Underwriter Should Know About the Law
What Small and Emerging Contractors Need to Know Understanding Selected Key Provisions of Construction Contracts © Copyright 2017 NASBP.
Nebraska Construction Prompt Pay Act and Healthcare Reform
What Small and Emerging Contractors Need to Know Understanding the Basics of Contract Surety Bonds © Copyright 2016 NASBP.
MECHANICS LIENS: New Changes & Old Issues
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2017 NASBP.
Understanding The Benefits Of Surety Bonds
What Small and Emerging Contractors Need to Know Understanding General Agreements of Indemnity © Copyright 2017 NASBP.
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Find the Problems with the Provisions May 11, 2016 Presented By:
COST OF THE WORK: Tricks and Traps to Avoid in Contract Drafting
Presentation transcript:

Why Bond Forms Matter… A Practical Guide to Better Bonding Presenters: Joanne S. Brooks, Esq., Vice President and Counsel, The Surety and Fidelity Association of America Deborah S. Griffin, Esq., Senior Counsel, Holland & Knight LLP Michael C. Zisa, Esq., Partner, Peckar & Abramson P.C. Moderator: Carrie L. Ciliberto, Esq., Deputy Executive Director & Counsel, ConsensusDocs

The ConsensusDocs Coalition

Equal Votes for All Coalition Members Consensus Process Align Owner Interests with the Project Team Balanced Risk Allocation Industry Best Practices and Trends Fair Contracts Save You Time and Money! Free Prequalification and Bond Forms Subscription Contract Drafting Principles

Historical Context Heard Act Miller Act Performance and Payment Protection Bond incorporates the contract

Importance of Bonds Often overlooked but critical Defines rights and obligations Predictability in enforcement Fair and reasonable

Common Forms Indemnity Miller Act and Little Miller Acts Custom American Institute of Architects (AIA) ConsensusDocs

Onerous Bond Provisions Unduly burden one party Hamper competition Impact pricing Flow down to lower tiers Eliminate use of smaller contractors

Examples of Onerous Provisions Automatic Increase in Penal Sum Consequential Damages Long term Warranties Waiver of Notice of Default Short take over timeline (3-7 days) Limit Surety options to only one

Performance Bonds

Performance Bond: Pre-Conditions to Surety's Obligations How are the surety's obligations triggered? - AIA A312 (2010): No owner default Considering declaring in default Request for meeting (optional) Declaration of default and termination Agreement to pay balance of contract price - ConsensusDocs 260: No owner default "Contractor is in Default pursuant to the Contract and Owner has declared the Contractor in default…" Agreement to pay balance of contract price Pros and Cons

Performance Bond: Surety's Performance Options Completion by Contractor Completion by Surety (Takeover) Tender Pay and walk away Deny

Performance Bond Surety's Options: Completion by Contractor Why is this an option? How does it work? – owner / contractor contract relationship status quo Does surety need owner’s consent? - ConsensusDocs and AIA both require owner consent Pros and cons

Performance Bond Surety's Options: Completion by Surety (Takeover) Why is this an option? How does it work? – new contract between surety and owner - Surety subs to original or new contractor Does surety need owner’s consent? - ConsensusDocs requires; AIA does not Pros and cons

Performance Bond Surety's Options: Tender How does it work? Surety arranges for completion of the contract by contractor who enters into a direct contract with the owner. New bonds required? Yes. Does surety need owner's consent? Yes. Pros and Cons

Performance Bond Surety's Options: Payment of Damages Can surety just pay and walk away? AIA A312 (2010): With reasonable promptness, after investigation, determine the amount for which it may be liable to the Owner Surety’s liability is limited to the amount of the Bond Liability may include broader categories of damages including legal, design professional and delay costs If Owner refuses payment the Owner shall be entitled to enforce any remedy available to the Owner ConsensusDocs 260: Waive its right to complete the Work Reimburse the Owner the amount of its reasonable costs, not to exceed the Bond Sum less the Contract Balances

Performance Bond Surety's Options: Deny Liability Why is this an option? How does it work? Surety notifies owner; owner controls completion; may send surety a bill for excess cost and damages - What happens to original subs? Does surety need owner’s consent? No Pros and cons - Some owners prefer to control completion

Performance Bond: Surety's Cap on Liability Is the Bond Amount a Cap on the Surety’s Liability? AIA A312 (2010): If the Surety elects to act under Section 5.1, 5.3 or 5.4, the Surety’s liability is limited to the amount of this Bond If the Surety elects to undertake to perform and complete the Construction Contract itself, through its agents or independent contractors, the cap may not apply ConsensusDocs 260: Explicitly states bond sum is “maximum amount” of surety’s obligation Electing to undertake to perform requires consent but the cap continues to apply

Performance Bond: Limitations Period What is the limitation period? – Two years unless prohibited by law where the action is filed. What triggers the start of the limitation period? AIA 312 (2010) – whichever of the following events occurs first: A declaration of Contractor Default; Contractor ceased working; or the Surety refuses or fails to perform its obligations. ConsensusDocs 260 – whichever of the following events occurs first: Default of the Contractor; or Substantial Completion of the Work. Pros and Cons

Payment Bonds

Payment Bond: Definition of Claimant Who is entitled to make a claim? – AIA 312 (2010) An entity or individual with a direct contract with the Contractor or with a subcontractor of the Contractor. An entity or individual who had rightfully asserted a mechanic's lien against the real property upon which the Project is located. Defines what types of "labor, materials and equipment" fall within the coverage of the bond. – ConsensusDocs 261 An entity or individual with a direct contract with the Contractor or having a contract with a subcontractor having a direct contract with the Contractor. Does not extend to those have mechanic's lien rights or specifically define the type of "labor, materials and equipment" falling within the coverage of the bond. Pros and Cons

Payment Bond: Conditions of Surety’s Obligations Contractor fails to make prompt payment of amounts due - Defenses under subcontract or purchase order available Second tier claimants must wait until payment not made within 90 days after last work under ConsensusDocs - No such requirement under AIA

Payment Bond: Owner’s Rights against the Bond None expressly stated under ConsensusDocs form Under AIA, express coverage for defense of mechanics liens, contingent on: ‒Lack of Owner default ‒Owner promptly notifies contractor and surety of claim ‒Owner tenders defense of claim to contractor and surety

Payment Bond: Condition of 2 nd Tier Claimants Rights AIA 312 (2010)-The 1986 version of the form did provide a ripeness requirement. This requirement was eliminated and there is no ripeness requirement in the 2010 document. ConsensusDocs 261-There is no surety obligation until the claim has aged for 90 days.

Payment Bond: Notice Requirements Claimant: Direct subcontractor AIA 312 (2010)-Claimants, who are employed by or have a direct contract with the Contractor, have sent a Claim to the Surety (at the address described in Section 13) ConsensusDocs 261-No notice requirement for first tier subcontractors or suppliers

Payment Bond: Notice Requirements Claimant: Lower Tier Subcontractor AIA 312 (2010) - written notice, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were, or equipment was, furnished or supplied, within 90 days and sent a Claim to the Surety, if notice of non payment is given by the Owner to the Contractor, that is sufficient to satisfy a Claimant’s obligation to furnish a written notice of non-payment. ConsensusDocs written notice to the Contractor, the Owner and the Surety within 90 days after the Claimant last provided or performed, stating with substantial accuracy the amount claimed and the name of the Party to whom the materials were furnished, or for whom the work or labor was provided or performed.

Payment Bond: Time for Surety to Respond Not specified under ConsensusDocs form Under AIA, surety must respond to claimant’s claim within 60 days ‒ but failure does not waive contractor defenses except as to undisputed amounts Response must state disputed amounts and basis for challenging disputed amounts

Payment Bond: Limitation Period What is the limitations period? – One year unless prohibited by law where the action is filed. What triggers the limitation period? - AIA 312 (2010) – whichever of the following occurs first: ‒The Claimant sends notice to surety; or ‒The last labor, materials or equipment were provided by anyone. - ConsensusDocs the claimant last provided labor, materials or equipment on the Project. Pros and Cons