RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Concerns with RUC Capacity Short Charge and Energy Trades.
DSWG Update to WMS May 17, DSWG Goals Update.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
The Convergence of Market Designs for Adequate Generating Capacity Peter Cramton and Steven Stoft 24 March 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Ancillary Services – Day-Ahead & Real Time Markets Mini Market.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Item 8, Technical Advisory Committee Meeting April 8, 2010.
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Unit-Specific Bid Limits based on Modified Generic Cost.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
1 TAC Report to the ERCOT Board February 16, 2005.
Nodal Short Pay and Uplift Process CWG Meeting May 28, 2008.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2004.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
Small Resettlements A Proposal to Reduce Impact on ERCOT and Market Participants.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
EILS Discussion February WMS. Charge to WMS from PRS The benefit. The cost based on the EILS PRRs. Changes in Market since April 17, 2006.
Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
1 TAC Report to the ERCOT Board November 14, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
1 Frequency Control Task Force Report to WMS July 19 th, 2006.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
QSE Managers Working Group Meeting Notes 9 October, 2008 Report to WMS 22 October, 2008 David Detelich - Chairperson.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Credit Working Group Background Information Credit Aspects of Mass Transition Update – February 3, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
Technical Advisory Committee Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
PRR619 Procedural History DSWG discussed the need to reduce market exposure to default should negative bids be selected and result in negative $/MW MCPC.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
CRR Deration and NPRR821 WMS 09/06/2017.
Exceptional Fuel Costs in LMP
A Midsummer Night’s DREAM
Interpreting DREAM NPRR 777.
Reflecting Losses in DR within ERCOT August 22, 2012
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Presentation transcript:

RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678

RPRS Procurement QSE Managers Working Group Brandon Whittle presented detailed discussion of how RPRS procurement engine works. RPRS procurement process does appear to reflect the intentions of the market participants with two areas identified for improvement: –Development of metrics to screen contingencies with no solution. –Method for identifying online units targeted for non-spin reserve service. Continue working with ERCOT regarding when and how much sigma bias should be used in the load forecast. Continue looking at ways to use the Non-Spin Reserve Market to address reliability related issues rather than relying on RPRS which is primarily for ensuring there is enough next day BES.

RPRS Procurement QSE Managers Working Group June 20 example: RPRS appeared to have significantly over- procured Unresolvable Contingency: –Gibbons Creek – Greens Prairie Dckt, Dansby – Atkins overloads Mitigation plan now in place, contingency removed

Summary of PRRs for Revised Allocation of Capacity Procurement Costs Problem: The current process pays for RPRS at MCPC based on a quantity X while collecting for the same type of capacity from “short” QSEs at MCPC for quantity Y. When X is less than Y QSEs receive the difference between dollars paid and dollars collected on a load ratio share. This creates an inequity in the market because credits are based on load ratio share and not on QSE’s relative “short” or “long” position in the market. Solutions: Three solutions have been proposed to address the allocation problem. Along with arguments for and against each, these alternatives are summarized in the table below.

PRRBasic DescriptionArguments ForArguments AgainstPossible Changes / Enhancements 674PRR-01 Temporary Alteration of Settlement Equations Related to the RPRS Under Scheduled Charge Submitted as a temporary solution, it recommends uplifting all RPRS procurement costs. Comments were subsequently submitted by the originating authors implying a permanent change and utilizing generic pricing for RPRS procurement. The basic argument for this change is that RPRS procurement is for reliability reasons and therefore should be uplifted and based on generic costs. It eliminates the “excess funds” problem. The recent sigma bias and June 20 th capacity procurement events support the position that RPRS procurement is reliability driven. Satisfying n-1 constraints while ensuring that power balance is achieved in the Step 2 (assignable portion) of capacity procurements also supports some rationale for a system- wide uplift. It provides an incentive for QSEs to go “short” since the capacity costs that are uplifted will be diluted and hence be lower on a per MWH than the true cost of procuring the capacity. It penalizes those QSEs that have already hedged against capacity shortfalls through bilateral contracts, thereby creating the situation where a QSE involuntarily pays twice for a hedge. It assumes that because capacity is procured for reliability reasons it should be priced at generic cost. At the RPRS meeting the originating authors appeared to be willing to withdraw the portion of their comments recommending paying for all RPRS using generic costs.

PRRBasic DescriptionArguments ForArguments AgainstPossible Changes / Enhancements 676PRR RPRS Solution with Nodal RUC-type Procurement Using the approach to be used in the RUC nodal process, this PRR recommends assigning capacity procurement costs first to those QSEs that are short subject to a pre-defined limit, and then uplifting the remainder on a load ratio share basis. It suggests pricing all procurements at generic costs. It discourages QSEs from going short in order to avoid “first in line” assignments. It uses an approach that will be used in the Texas Nodal market. It limits the financial penalty to short QSEs. It eliminates the “excess funds” problem. It assigns costs that may be more rational to uplift particularly if they are more in line with the current Step 1 costs. It assumes that because capacity is procured for reliability reasons it should be priced at generic cost. At the RPRS meeting, the originating author appeared willing to consider modifications to allow MCPC payment for Step 2 type costs. One way this could be implemented is by keeping the current Step 1 and 2 processes in order to derive the capacity cost rate.

PRRBasic DescriptionArguments ForArguments AgainstPossible Changes / Enhancements 678PRR Allocation of RPRS Over- Collection to long QSEs This PRR recommends distributing “excess funds” to QSEs that are “long”. The credit is pro-rated based in each QSEs ‘long” position. It eliminates the “excess funds” problem. It maintains and encourages QSEs to be “long” in the market. If one assumes that the current procurement process is correct and only subject to “fine tune” adjustments then this PRR offers a logical and efficient approach that is also consistent with the underlying intent of the current Protocols. By limiting the argument to “excess funds” the PRR sanctions the current capacity cost assignment process. Several RPRS participants have expressed the view that the current process over-penalizes QSEs that are “short”. None have been offered so far. An argument has been made for “long” QSEs” getting paid the marginal cost of the capacity, but instead this PRR uses average costs for the “excess funds” issue.