1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.

Slides:



Advertisements
Similar presentations
WestConnect, RTO1 Western Electricity Coordinating Council Board of Directors Meeting June 5, 2002 WestConnect RTO Cary Deise Arizona Public Service Co.
Advertisements

March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
Arizona Corporation Commission Workshop
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
NORTHWEST POWER POOL Reliability Update
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
WestConnect RTO Remarks of Charles Reinhold Project Manager FERC’s Regional Technical Conference Phoenix, Arizona September 24, 2003.
1 JPA Meeting Joint Planning Agreement Western Area Power Administration Desert Southwest Region July 13, 2005.
WELCOME PUC Rule 3627 Stakeholder Participation. Who we are: Xcel Energy Staff Introductions Public Service Company of Colorado.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
California Energy Commission Workshop Nuclear Power Plant Issues
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
1 FRCC Compliance Organization and Entity Registration 2008 FRCC Compliance Workshop.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
1 Western Wind and Solar Integration Study Site Selection Analysis 5/14/2008.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
Charles Hosken, General Manager Imperial Irrigation District
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
WestConnect Regional Transmission Service Tariff March 16, 2015.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Arizona Corporation Commission Docket No. E-00000D Biennial Transmission Assessment Workshop II September 18, 2008.
SPDG and Central Arizona College A Successful Partnership.
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
BTA Workshop May 22, 2008 Ten-Year Transmission Plan for the Santa Cruz Water & Power Districts Association (“Santa Cruz”) 10/26/2015K.R. Saline & Assoicates,
Arizona Corporation Commission Energy Workshop February 16, 2001.
APS Overview Richard Nicosia. APS Snapshot Largest and longest serving electric utility Operations dating back to th largest employer headquartered.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
1 Benefits of Transmission Ownership Bob Johnston CEO of MEAG Power.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
CAP Trail Master Plan: Pinal County Segment CAP Trail Draft Master Plan Presentation to Pinal County Board of Supervisors November 4, 2015.
Dynamic Signal Workshop January 14, 2016 APA Office Phoenix, Arizona 1.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
APA Customer Bubble Charts Work in Progress Updated January 25, 2016 (a.m.) (Contact: John Underhill ) 1.
Arizona Corporation Commission Biennial Transmission Assessment Workshop May 22 & 23, 2008 Phoenix, AZ.
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
CSC DETERMINATION PROCESS
Director, Transmission Services
PMC Membership as of 5/1/2016 Enrolled TO Coordinating TO 1
Proposal to Remove from Service the PV-COI RAS
Pacific Power Seismic Preparedness Update
SunZia Project Description
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
How the Missouri River is Operated - WAPA’s Role - Mid-West Electric Consumer Association Annual Meeting December 11, 2018 | Denver, CO Lori L. Frisk VP,
WestConnect Regional Transmission Service Tariff
Presentation transcript:

1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008

2 CATS HV Study Area

3 Summary With a 25 MVAR capacitor at Thornton: The Ten-Year Plan exhibits no pre or post outage condition voltage or thermal issues in CATS HV system N-1 performance with additional local load beyond 2016 load level: –voltage violations +100 MW –thermal violations MW

4 Addendum to 2007 Study Thermal Overloads and Voltage Violations identified in 2016 “growth” scenario cases Review Western 115kV upgrades to 230kV construction (poles and wire) but still operated at 115kV Conclusions –Upgrades Mitigate Voltage and Thermal Violations –CATS HV System can accommodate at least 300MW of additional loads beyond 2016 time frame with proposed upgrades Approved by CATS HV participants

5 CATS HV Participants Transmission Owners –Arizona Public Service Tucson Electric Power –Salt River Project Western Area Power Administration –Southwest Transmission Coop. Load Serving Entities –Arizona Public Service Electrical District 2 –Central Arizona Project Electrical District 3 –San Carlos Irrig. Project Electrical District 4 –Trico Distribution Coop. Electrical District 5 Governmental Entities –AZ Attorney General’s Office Arizona Corp. Commission –Arizona Power Authority City of Casa Grande –Town of Eloy Town of Coolidge –Town of Maricopa Pinal County

6 Study Group Participants –Arizona Public Service –Electrical District 2 –Electrical District 3 –Electrical District 4 –Electrical District 5 –Salt River Project –Southwest Transmission Coop. –Tucson Electric Power

Study Plan 2018 Transmission Plan for CATS HV detailed system with WestConnect coordinated base case Resource Scenarios based on probable energy zones (500MW increments) Document all findings and conclusions coincident with SWAT/WestConnect Annual Report by October 2008