Compliance Update September 2006. Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was 151.3 ERCOT’s CPS1 scores show significant.

Slides:



Advertisements
Similar presentations
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Advertisements

NERC Orientation Joint Guidance Committee WECC Leadership
Status of NERC Standards Activity Joint Guidance Committee Meeting January 23-24, 2007 Steve Rueckert - WECC Director, Standards and Compliance.
Allan Wick, CFE, CPP, PSP, PCI, CBCP Chief Security Officer WECC Joint Meeting October 8, 2014.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Date Texas RE Board Update to TAC November 5, 2009 Susan Vincent Director, Legal Affairs.
Physical Security CIP NERC Standing Committees December 9-10, 2014.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Current Status Of The ERO Transition Activities To Comply With The 2005 EPAC ERCOT Board Meeting February 21, 2006 Sam Jones, COO.
1 Texas Regional Entity Report December Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – Initial.
Texas Regional Entity Compliance Report TAC July 9, 2009.
Federal Energy Regulatory Commission June Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
Texas Regional Entity Compliance Report Board of Directors June 15, 2009.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
NERC as the ERO Craig Lawrence Manager of Organization Registration, Certification, and Compliance Monitoring.
Update On The ERO Transition Activities To Comply With The 2005 EPAC ERCOT TAC Meeting March 9, 2006 Sam Jones, COO.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
1 Texas Regional Entity Compliance Update July 2007.
Texas Regional Entity Compliance Report Board of Directors May 19, 2009.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
Project (COM-001-3) Interpersonal Communications Capabilities Michael Cruz-Montes, CenterPoint Energy Senior Consultant, Policy & Compliance, SDT.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Texas Regional Entity Compliance Report Board of Directors February 16, 2009.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
Standards Review Subcommittee Update August 17, 2010.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
November 2, 2006 LESSONS FROM CIPAG 1 Lessons from Critical Infrastructure Group Bill Bojorquez November 2, 2006.
Texas Regional Entity Report Mark Henry June 6, 2008.
ERS Update – DSWG Presentation September 21, 2012.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
Electric Reliability Organization and Issues in Texas Technical Advisory Committee January 4, 2006 Jess Totten Director, Electric Industry Oversight Division.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
Compliance Update Larry Grimm ERCOT Compliance To The ERCOT Board of Directors September 20, 2005.
NSRS Update Recent NERC Standards Activities RSC – June 2013 Presented by: Lisa Martin, NSRS Chair.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Page 1 of 21 Texas Regional Entity ROS Presentation June 11, 2009 T EXAS RE ROS P RESENTATION J UNE 2009.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Standards Review Subcommittee Update August 18, 2015 Chair Rebecca Berdahl, BPA.
Texas Regional Entity Compliance Report Larry Grimm September 4, 2008 TRE TAC September 4, 2008.
WECC – NERC Standards Update
MOPC Meeting Oct , 2016 Little Rock, AR
Compliance Report to ERCOT BOD December 2006
Steve Rueckert – Director of Standards
Updated ERO Enterprise Guide for Internal Controls
WECC Regional Standards Update
Compliance Report to ERCOT TAC February 2007
Merrill Brimhall – Engineer, Staff
Reliability Standards Development Plan
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
NERC Reliability Standards Development Plan
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
Performance Measure Recommendations
NERC Reliability Standards Development Plan
WECC – NERC Standards Update
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Presentation transcript:

Compliance Update September 2006

Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant improvement over the same month for the past three years since the implementation of PRR 525 with the exception of January  PRR 525 Performance Scores for August indicate 32 QSEs passed / 1 non-wind-only QSE failed the measure Scores posted on the ERCOT Compliance Website Performance of Wind-Only QSEs is not improving, possibly declining

ERCOT’s CPS1 Monthly Trend

ERCOT CPS1 by Interval

QSE PRR Minute Interval Scoring

SCE Performance Monitoring  SCE Performance Monitoring scores for all QSEs are published on the Compliance Website SCE Performance Scores

525 Passing 10-Min Interval Percentage Trends

Resource Plan Performance Metrics August 2006 Results

NERC ERO Developments  On July 20 th, FERC approved NERC’s application to become the Electric Reliability Organization (ERO).  Draft Texas Regional Entity budget submitted to NERC in June.  Proposed Regional Entity Work Plan submitted to NERC in July.  Draft Delegation Agreement between NERC and ERCOT filed August 4 th.  ERCOT Compliance submitted, to NERC on September 8 th, contact information from ERCOT Entities responsible for NERC Reliability Standards.

NERC Standards (  The Interpretation of PER Requirement 1 is posted for a 30-day pre-ballot review. This is an interpretation, not a standard, and it may establish whether ERCOT TDSP and QSE real-time operators need to hold NERC Operator Certifications. The ballot pool may be joined up until Monday, Sept. 18. After this, a 30-day voting period will begin.Interpretation of PER Requirement 1  Another group of standards have an open ballot pool until Sept. 18, followed by voting: FAC-010 — System Operating Limits Methodology for the Planning Horizon FAC-010 FAC-011 — System Operating Limits Methodology for the Operations Horizon FAC-011 FAC-014 — Establish and Communicate System Operating Limits FAC-014  More Pre-ballot Windows and Ballot Pools Open from Sept. 6 to Oct. 5, 2006, for voting in October: Violation Risk Factors Matrix Missing Measures and Compliance Elements Balance Resources and Demand Standards  The Transmission Relay Loadability Standard Drafting Team posted the first draft of its standard for a 45-day comment period from August 16 through September 29, This will codify lessons learned in implementing the 2003 Blackout Recommendation #8a, including items that ERCOT System Protection WG members are working with today.Transmission Relay Loadability  NERC is hosting a standards workshop in Dallas on October  A workshop specifically on Cyber Security Standards will be in Dallas on Oct 5-6.