CMWG Update to WMS 1-9-13 Report of CMWG Meetings of 12-14-12 & 1-4-13.

Slides:



Advertisements
Similar presentations
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Advertisements

ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Real Time Mitigation During Exceptional Fuel Cost Events.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
ISO Comparison – CAISO Alex Lee (ERCOT)
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
March 7, 2013 Technical Advisory Committee (TAC) meeting update to RMS Kathy Scott March 20, 2013TAC Update to RMS 1.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date May 15, 2014.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Congestion Management Working Group WMS update 11/7/2012.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
1 WMS Report TO TAC April 2007 (which is in March)
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
CMWG Update to WMS M Wagner Edison Mission Marketing & Trading.
WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
CMWG Update to WMS Report of CMWG Meeting of
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
Exceptional Fuel Costs in LMP
Presentation transcript:

CMWG Update to WMS Report of CMWG Meetings of &

CRR Auction Calendar—Rolling 6 Month Auctions to Start 4/13 See CMWG ERCOT calendar for docs Decision for WMS—break for Christmas/New Year Holidays?

Draft NPRR on changes to CCT, Overmitigation and Tie Breaking Support for moving it forward to PRS process Would change process for Constraint Competitiveness Tests (CCT)— replacing annual designation of Non/Competitive with a daily process— annual test will be done for advisory purposes [CCT] – Monthly/Daily (CCTs) will be replaced with a CCT that in Security-Constrained Economic Dispatch (SCED) process – Will consider only constraints that are active in SCED & current system conditions IMM would have ability to designate constraints as either competitive or non-competitive, regardless of CCT results Only those Resources that have a significant contribution in getting the DME considered for mitigation for a non-competitive constraint will have mitigation applied in SCED [overmitigation] The formula for mitigating energy offers in SCED is changed to include a small adder to the reference price from SCED Step 1 in order to minimize issues caused by the tie breaking logic [tie breaking]

Some Proposed Changes to SP CAP Document Proposed by Priority Power Proponents addressed suggestions from earlier meetings. Now Proposing – Net margin trigger threshold from $65k to $80k (current is $95k) – Extend caps to similar constraints once triggered (new) – Reset trigger over rolling 12 months (vs. current annual), recalculated daily – Caps would remain in place for 6 calendar months. Cap would terminate 5 months after the rolling 12-month net margin from rents falls below the $80,000 /MW/year trigger. But would again apply when hit the $80k – Apologies if I have details incorrect—tried to get them right.

Misc Discussion Items CRR Auction Revenue Distribution—no proposed changes in written form were presented Rio Hondo – Ajo outage (Fall 2012) Dsicussed timeline of outage and ERCOT Notification processes ERCOT has been encouraged to notify market when they ask TOs to put outaged equipment back in service—early Brown Killeen Line Line derated due to interference with some equip that is not transmission related—expected fix by end of Q3

Not Discussed at CMWG but potential Parallel Issue with Settlements Should 6.6.9Emergency Energy Settlement continue to cap all at MOC or only those mitigated? Resources are considered for Emergency Operations Settlement under the following conditions: 1. During Emergency conditions (when Emergency Base Points are in effect). 2. In accordance with paragraph (8) of Section , General Capacity Testing Requirements, QSEs that receive a VDI to operate the designated Generation Resource for an unannounced Generation Resource test. 3. A QSE that represents a QSGR that comes On-Line as a result of a Base point less than its Resource Registration applicable Seasonal net minimum sustainable rating (MOC includes a Startup and Min Energy in the variable O&M component), limited to the first q Settlement Intervals. 4. QSEs that received Base Points that are inconsistent with Real-Time Settlement Point Prices. 5. QSEs that receive a manual override from the ERCOT Operator. Settlement is based on the Emergency Base Point Price by SCED interval averaged across the 15 minute settlement interval: Emergency Base Point Price per QSE per Settlement Point per Resource by interval—The average incremental energy cost calculated per the Energy Offer Curve, capped by the Mitigated Offer cap pursuant to Section , Mitigated Offer Cap, for the output levels between the SCED Base Point immediately before the Emergency Condition and the Emergency Base Point of Resource (or SCED base points in case of 2-5).