SoLID review DAQ recommendations Alexandre Camsonne.

Slides:



Advertisements
Similar presentations
Bob MichaelsParity Collab. Mtg. May 17, `07 Integrating Compton DAQ and Analysis Bob Michaels with Reminder about Nov 2006 Results Specification of new.
Advertisements

May 17th 2007 Happex Collaboration Meeting 1 Compton polarimeter Electron detector upgrade and status PREX/Happex Collaboration Meeting May 17 th 2007.
Compton integrating method Beam test summary PREX/Happex Collaboration Meeting Alexandre Camsonne.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
Outline Experiments Setup and DAQ configuration Fastbus for SBS: performance and status GEn/GMn - trigger and DAQ GEp - trigger and DAQ GEM readout Outline.
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
Possibility for Double DVCS measurement in Hall A Alexandre Camsonne SBS Meeting June 4 th 2013.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Pions for SoLID May 7 th 2013 SoLID EC meeting A. Camsonne.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
David Abbott - Jefferson Lab DAQ group Data Acquisition Development at JLAB.
SuperBigbite DAQ and Trigger electronics Alexandre Camsonne Hall A Jefferson Laboratory SBS Review.
Multi-UAV swarming Advisor: Dr. Manish Kumar Mentor: Mr. Balaji Sharma
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
Hall A DAQ meeting January 12 th Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus.
Address Recommendations Jian-ping Chen, JLab SoLID Collaboration Meeting May 14-15, 2015.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
String-18 Development Workshop, Overview Azriel Goldschmidt AMANDA/ICECUBE Collaboration Meeting Berkeley March 2002.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
SoLID Pre-R&D List SoLID Collaboration Meeting September 11-12, 2015.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne VI. Nuclear Physics (NP)
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne November 18 th 2011 VI. Nuclear.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
CODA Graham Heyes Computer Center Director Data Acquisition Support group leader.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
Update/Overview of SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting Dec , 2012.
R. Michaels, JLAB PREX Mtg, July 2008 Compton DAQ (General) Remaining experts : Sirish Nanda, Alexandre Camsonne, me Recent Exercises Port to vxWorks 5.5.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
Update on SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting November 8-9, 2013.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Hall D Computing Facilities Ian Bird 16 March 2001.
Rainer Stamen, Norman Gee
Counting Mode DAQ for Compton
Trigger, DAQ, & Online: Perspectives on Electronics
Hall A Compton Electron detector overview
Alexandre Camsonne August 27th 2016 SoLID collaboration meeting
Status Update Jian-ping Chen, JLab SoLID Collaboration Meeting
VETROC for Edet DAQ Bob Michaels (presenting) Scott Barcus Alexandre Camsonne Ben Raydo and the GRINCH group (Todd Averett et. al.) Compton Meeting.
during Fall GMp run (high current)
Example of DAQ Trigger issues for the SoLID experiment
Alexandre Camsonne January 12th 2016 SoLID collaboration meeting
General Update Jian-ping Chen, JLab SoLID Collaboration Meeting
Alexandre Camsonne January 13th 2015
Alexandre Camsonne September 12th 2015 SoLID collaboration meeting
General Update Jian-ping Chen, JLab SoLID Collaboration Meeting
Possible parasitic measurement during Fall GMp run
Status Update Jian-ping Chen, JLab SoLID Collaboration Meeting
August 19th 2013 Alexandre Camsonne
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

SoLID review DAQ recommendations Alexandre Camsonne

Recommendations 2c 1.The plans for the High Level Trigger and the needs for slow control need to be worked out in detail and the implications for resources need to be evaluated. 2.The implications of the need for these resources in the context of availability of resources at the laboratory need to be understood. 3.Closer communication with the other JLab experiments and the JLab computing center is strongly encouraged. 4.Having a functional simulation and reconstruction routines as soon as possible should be a high priority in the software effort. Such software will pay off many times over in experimental design and avoiding pitfalls.

DAQ observations

Dead time correction PVDIS 1b.2 Test with small scale setup Simulation Discuss with DAQ group for particular features needed – Example : helicity gated deadtimes

L3 trigger 2c1 Test on small scale L1 trigger L3 farm : collaborate with Hall D, try to test simulated data on their setup Need simulated digitized data and tracking algorithm to test online Need to figure out funding

Ressources 2c2 Computing ressources needed for L3 Tape SILO needs, network Manpower

L3 trigger 2c2 Test on small scale L1 trigger L3 farm : collaborate with Hall D, try to test simulated data on their setup Need to figure out funding

Communication with other groups 2c3 Try collaborate with Hall D Constant communication with JLAB DAQ and electronics group Hall C interested in using VETROC for logic and readout check experience with APV and FADC from HPS – Already planning to reuse HPS trigger scheme

Recommendation 2c4 See software talk

Forgotten recommendation Bunker design – Radiation – Cooling of bunker to be evaluated / design

Pre R&D Test trigger rate capability ( 3 months + 1 JLAB ) Test triggering schemes ( implementation 3month / test 6 month + 1 person JLAB) GEM APV rate capability ( before end of August : 3 months +1 person (UVA+Stony Brook) MRPC : high resolution timing L3 : performance tests and data reduction ( 6 months / 1 student or postdoc and JLAB staff) – Need simulated data ( software ) – Reconstruction algorithm to test ( software )

Hardware FADC availables VXS crates and Intel CPU GTP borrowed VETROC available R&D need – Individual FADC reading – Trigger setup – Deadtime measurement for PVDIS – ( High resolution TDC )

Manpower JLAB : – Alexandre Camsonne – Robert Michaels ( Compton development ) – Electronics group – DAQ group Stony Brook – Seamus Riordan – Krishna Kumar – Postdoc – Student Need to make detailed manpower and task schedule for R&D and experiment

Timeline Summer SBS projects – GTP : calorimeter – VETROC : used by Compton – FADC : FADC counting DAQ deployment – L3 farm test will Hall D – GEM : MPD test Development : – Deadtime mesurement – FADC readout and trigger serialization ( could be used by other experiments NPS, SBS )

Conclusion L3 needs addressed with Hall Slow controls being addressed Several tests this summer can address recommendation Working on detailed man power loaded schedule