12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer1 HEC Beam Test Primer Production modules of the HEC have been tested in particle.

Slides:



Advertisements
Similar presentations
CBM Calorimeter System CBM collaboration meeting, October 2008 I.Korolko(ITEP, Moscow)
Advertisements

Group Meeting 03/02/2004. Format of Weekly Group Meeting  Daily chore  Research report: electronic presentation required  Journal report.
Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
Simulation Project Major achievements (past 6 months 2007)
Pascal PERRODO, ATLAS-LAPP
Single Particle Energy Resolution Vishnu V. Zutshi.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
HCAL Digitization Rick Wilkinson. Program Flow CaloHitResponse CaloSamples (analog signal) HcalElectronicsSim HBHEDataFrame (or HF, or HO) SimHits DetId= ,
Yu. Artyukh, V. Bespal’ko, E. Boole, V. Vedin Institute of Electronics and Computer Science Riga, LATVIA 16th International Workshop on Laser.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
On The Geometry of the HEC Readout Channels Local HEC coordinate system Readout families Readout channels Volumes and geometrical centers Neighbors Michel.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Preliminary comparison of ATLAS Combined test-beam data with G4: pions in calorimetric system Andrea Dotti, Per Johansson Physics Validation of LHC Simulation.
C. Seez Imperial College November 28th, 2002 ECAL testbeam Workshop 1 Pulse Reconstruction Worth considering the experience of other experiments using.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
1 N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Operation and performance of the NESTOR test detector.
Pavel Šťavina, Bratislava 2004 Slovak contribution to experiment ATLAS  Even though Slovakia is small country with limited finances we have fulfilled.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
Pspice Simulations - Intro. To Capture/PSpice - Simulation of EST - Simulation of Existing Test Beam.
Ian Ross Rose-Hulman Institute of Technology Mentor: Dr. Richard Teuscher University of Toronto ATLAS Group ATLAS Calorimetery: Cosmic Ray Commissioning.
Combined HEC/EMEC testbeam data can be read and analyzed within the ATLAS Athena framework A “cookbook” gives an introduction for how to access the data.
Kati Lassila-Perini/HIP HIP CMS Software and Physics project evaluation1/ Electron/ physics in CMS Kati Lassila-Perini HIP Activities in the.
9-13/9/03 Atlas Overview WeekPeter Sherwood 1 Atlfast, Artemis and Atlantis What, Where and How.
8 June 2006V. Niess- CALOR Chicago1 The Simulation of the ATLAS Liquid Argon Calorimetry V. Niess CPPM - IN2P3/CNRS - U. Méditerranée – France On.
January 21, 2007Suvadeep Bose / IndiaCMS - Santiniketan 1 Response of CMS Hadron Calorimeter to Electron Beams Suvadeep Bose EHEP, TIFR, Mumbai Outline:
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
May 1-3, LHC 2003V. Daniel Elvira1 CMS: Hadronic Calorimetry & Jet/ Performance V. Daniel Elvira Fermilab.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
Offline and Monitoring Software for the EMEC+HEC Combined Run Combined Test Beam and LArg Software and Performance 11 September 2002 Rob McPherson University.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
BES III reconstruction software planning for Summer 2004 BES III reconstruction software planning for Summer 2004 Li Weidong
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Combined HEC/EMEC testbeam data can be read and analyzed within the ATLAS Athena framework A “cookbook” gives an introduction for how to access the data.
TRANSMISSION LENGTH STATUS HAROLD YEPES-RAMIREZ IFIC, January 12 th
M. LefebvreATLAS LAr week, November 19th HEC-EMEC beam test data analysis Filtering weight synchronization and timing issues TDC timing Cubic timing.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 22 February 2011 Time Meeting, BNL.
Monitoring for the EMEC/HEC Combined Run in August HEC/FCAL/Combined Testbeam Meeting 16 April 2002 Rob McPherson for the UVic group (Fincke, Kanaya, Keeler,
The ATLAS Electromagnetic and Hadronic End-Cap Calorimeter in a Combined Beam Test Tamara Hughes University of Victoria WRNPPC 2004.
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
LHC Symposium 2003 Fermilab 01/05/2003 Ph. Schwemling, LPNHE-Paris for the ATLAS collaboration Electromagnetic Calorimetry and Electron/Photon performance.
June 2004 ATLAS WeekAlexander Solodkov1 testbeam 2004 offline reconstruction.
Test Beam Meeting Monday, January 31, 2000 Fpix1 Calibration Status 1.What we have 2.What to do Monitor Software to use now 1.Current Version 2.Calibration.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
4 Dec., 2001 Software Week Data flow in the LArG Reconstruction software chain Updated status for various reconstruction algorithm LAr Converters and miscellaneous.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
CscClusterization and Micromegas Woochun Park Group Meeting.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
or getting rid of the give-away particles in a test-beam environment
Beam test of Silicon-Tungsten Calorimeter Prototype
EZDC spectra reconstruction and calibration
Online Monitoring : Detector and Performance check
on behalf of ATLAS LAr Endcap Group
PCM (Pulse Code Modulation)
Introduction The aim of this talk is to try to get a feeling on the expected degradation of performance of a calibration once we move from MonteCarlo.
ScECAL+AHCAL+TCMT Combined Beam FNAL
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
HEC-EMEC Test Beam Software
HEC Beam Test Software schematic view T D S MC events ASCII-TDS
Presentation transcript:

12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer1 HEC Beam Test Primer Production modules of the HEC have been tested in particle beams in 1998, 1999, 2000 and 2001 –Lots of data (electron, pions, muons, 6 to 200 GeV) –Pulse shape sampled for many 25ns time samples –Calibration parameters obtained from special runs –Signal peak reconstruction parameters obtained from noise measurements and knowledge of pulse shape –hec_adc software framework –NIM paper accepted for publication Getting ready for combined beam tests –HEC/EMEC scheduled for August 2002 –HEC/EMEC/FCAL in 2003

12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer2 HEC beam test setup beam 1 st wheel 2 nd wheel beam 4 samplings in depth

12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer3 HEC beam test setup Signal shape sampled by FADC at 40MHz: time samples measured each 25ns in ADC units for each cell First sampling cell map

12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer4 HEC Beam Test Software crude schematic view HEC raw beam test data EPIO hec_adc monitoring EPIO-ASCII converter ntuple user analysis HEC-MC GEANT3 ASCII Data file ASCII-TDS converter EPIO-TDS converter TDSTDS MC events MC-TDS converter Analysis package ATHENA framework hec_adc framework

12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer5 HEC Beam Test Software A few analogies… hec_adcAthena hec_adc.datacardJob Options file user_ini*.finitialize() user_evt*.fexecute() user_ana*.f, user_ter.ffinalize() Combined beam test: Athena-based code!!