RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.

Slides:



Advertisements
Similar presentations
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Advertisements

APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
AGS pp Status Feb. 17, 2015 Time Meeting Haixin Huang.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
Haixin Huang AGS Cold Snake: Status and Plans.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
E.C. Aschenauer RSC - Meeting 2012/03/232  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Presentation transcript:

RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues

RHIC Polarized Proton Parameters ParametersGoalAchieved Interaction points6 8  * in blue  * in yellow Working points ramp: (28.685, ) Store: (28.69, 29.68) Ramp: (28.680, ) Store: (28.69, 29.68) Luminosity/Week18-32 pb^-125.4pb^-1 (the best, 4/5-12) Polarization50%50%* Peak bunch intensity1.4*10^111.8*10^11 Peak luminosity1.7* 10^32 cm^-2s^-11.6* 10^32 cm^-2s^-1 *Average of jet polarization is 46% for both rings. Taking into account for the polarization profile correction factor (R=0.2), The polarization seen by experimenters is boosted by Sqrt(1+R)=> 50%.

Overall Luminosity and Polarization Haixin Huang3 Jump quads on Declare physics 9MHz cavity on Last 9MHz Luminosities are before rescaling with new cross section. (Wolfram)

Luminosities in a Few Consecutive Stores Haixin Huang4 The impact of AnDY on integrated luminosity is about 5%. This does not include failures due to the complication.

Cross Sections for PHENIX ZDC Haixin Huang5 (Angelika)

Is It Due to Higher Luminosity? Haixin Huang6 (Angelika)

Integrated Luminosities Haixin Huang7 Preliminary (Ingrassia)

Time in Store Haixin Huang Lower energy runs Time in store was 37% for run11 pp run. If taking out the two weeks lost due to cryo and power distribution problems, it is still only 46%, compared to the low 50% numbers in last two runs. 46%

Blue abort kicker noise. This has been a problem in the past, but it was intermittent. It took us awhile to realize the source of the problem: abort kicker. Fixing it finally took a few more days. We delayed physics declaration by one week, but the impact of this problem is longer than that. Cryo circuit break trips. It happened twice (Feb. 14 and Mar. 6). And took out total of ten days the second time. This is an human error issue and lessons are learned here. Power distribution problem for injection. This was due to aging cables (more than 40 years?). It took out two days out of operation. 9MHz cavity failure on Apr. 13. We had to lower bunch intensity and recommission the ramp to switch back to 28MHz with lower bunch intensity. Luminosity suffered. As a result, the total physics running time was shortened by three weeks. Haixin Huang9 Major Failures

l It seems we had more RHIC P/S failures (mostly trim quads and sextuples) this run. l PASS system failure is also on the high occurrence list in the early part of the run. l The pp run was started as a commissioning run for PHENIX VTX detector. We experienced higher number of access hours by PHENIX this run. l LINAC availability (tank 6-9) was an issue this run, after a key technician retired. l As we push vertical tune near 2/3 and the requirement to control snake angle difference, tune and orbit feedbacks are critical to the operation. There was a learning curve on developing it and using it correctly. l 9MHz cavity development took longer than expected. l The statistics of the down time of this run are being collected. It will be analyzed when they are available. Haixin Huang10 The Additional Source of Downtime of This Run

200MeV Polarization since Run6 Haixin Huang11 The upgrade and modifications since run9 should improve polarization. Is the lower polarization due to the aging of the laser device? Or different intensity at 200MeV polarimeter for different years? 78-80% 79-80% (From Rapria, et al in PAC11)

Polarization Comparison between AGS and RHIC AGS Blue_cal Blue1 Blue2 Yellow_cal Yellow1 Yellow2 Run Run Run The R value for polarization profiles at injection (from Sasha): blue yellow Run Run The spin transfer efficiency between AGS and RHIC: 95.8% for blue and 99.1% for yellow. 1.All polarization values are averaged for the who run with corresponding data (AGS and RHIC). Intensity varied during each period. The AGS polarization was measured with vertical target. Statistical errors are small, about %. 2. The run6 was for May and June data only. We had a larger correction factor for 100GeV A_N. 3.The Run9 was for 250GeV run period only (which happened to have lower polarization at the time.

l We scanned snake current +-5A (+-150mirco-rad), no change of polarization transmission efficiency. But we plan to do more. l We scan the vertical tune on the ramp and it stays at a plateau. Tune control on the ramp is also very good. l We greatly improved the rms orbit this run through orbit feedback. The BPM offset sign reversal and realignment of vertical should improve the orbit, too. l Vertical chromaticity is in the 2-3 range over the sensitive range ( GeV). l Possible sources of polarization loss on the ramp: misalignment between magnets and BPMs; coupling at later part of ramp; and horizontal tune/chromaticity because of coupling. Haixin Huang13 Polarization Sensitivity Tests Done

Polarization vs. Vertical Tune on the Ramp Haixin Huang14 Better efficiency at higher tune (0.71 and 0.72) shows that we have better rms orbit this run. The impact on the polarization at current working point is small, though. 3/4 resonance 7/10 resonance

Haixin Huang15 Ramp Measurements Ratio of the two ramps between100->100: The up/down ramps are confirmed to be identical. So the polarization los each way is about 10%. With 65% at injection, we don’t have a consistent story of polarization at store between these online measurements and jet measurements.

No difference with Different Ramp Rate Haixin Huang16 Spin tracking with three particles crossing around a strong intrinsic resonance with two different ramp speed (7.5 times different). (Francois)

l Higher polarization out of AGS (jump quads). l Higher polarization at RHIC store (tune and orbit on the ramp). l Highest peak luminosity in RHIC so far (9MHz, orbit/tune). l Orbit feedback works. We have excellent orbit control on the ramp. l 9MHz cavity is operational. We may benefited from less e-cloud effect already. So far no indication of intensity issue. l 10Hz orbit feedback works. Beneficial to luminosity. l Up/Down ramp from 100GeV to 250GeV to compare polarization levels at the two energies. l Chromaticity feedback works for these ramps. Essential for the down ramp development. l Injection jet polarization measurement done with a short notice. Haixin Huang17 What Have Been Achieved This pp Run

l Collect statistics for the run. l Follow up on various machine availability issues. l Data mining for the beam parameters vs polarization/luminosity. l Tracking studies with realistic beam conditions. l Beam physics related issues: l Coupling on the ramp and at store; l Larger transverse emittances this run. Haixin Huang18 Plan (incomplete list)

Coupling Visible on BBQ Tune Spectrum Haixin Huang19 Coupling is visible on the later part of ramp and at store. A possible source for polarization loss on the ramp and during store (horizontal tune is high, closer to 0.7)