CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Construction Contracting
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
ABC Change Orders College of Environmental Design
Construction Cost Estimating Class #2: Contract Documents Prof. Ralph V. Locurcio, PE.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
CARLIN LAW GROUP, APC Dispute Resolution Procedures Contract Claims Requirements Public Contract Code § (schools) Public Contract Code §20104 Government.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
CVE 4070 ENG-1000 Intro to Engineering CVE-1000 Intro to Civil Engineering Construction Overview Prof. Ralph V. Locurcio, PE.
Project Close Out CTC-470.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Construction Engineering 221 Contracts & Contractor Procurement.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for Methods of Measurement.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
CONSTRUCTION ADMINISTRATION Changes and Extra Work in Construction Management Dr. Alaattin Kanoğlu Spring, 2013 Professonal Practice Management I.B.U.
Construction Contracts and Project Delivery Methods
CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
King Fahd University of Petroleum & Minerals
CVE 4070 Construction Engineering Shop Drawings Quality Control
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CHANGE ORDER & BACKCHARGES PREPARED BY ABDULAZIZ M. AL-BESHR ID# PREPARED FOR Dr. ABDULAZIZ BUBSHAIT.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
CON 2001-CVE 4070 Construction Engineering Project Organization & Stakeholders Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Value Engineering Prof. Ralph V. Locurcio, PE.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
Chapter 13 Estimates for Remodeling Work
CVE 4070 Construction Engineering Quality Control Value Engineering
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.
CON 2001/CVE 4070 Construction Engineering Construction Estimating
Measurement and Payment
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
Helen S. Henningsen Department of Veterans Affairs Office of General Counsel.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
CONSTRUCTION CHANGE DIRECTIVES UNDER THE NEW PUBLIC BID LAWS Speaker: STEVEN B. LOEB, Esq. BREAZEALE SACHSE & WILSON, LLP Tel: (225)
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
QUANTITY AND COST ESTIMATION OF RESIDENTIAL BUILDING
Class #1 Contract Delivery Systems
Estimating and Scheduling CEE 492
Administration of a FIDIC Contract - Project Control
Estimating Project Costs
(Additional materials)
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Unique General Conditions of the Alabama Building Commission (ABC)
Construction Contracts
Directed Change Constructive Change
Presentation transcript:

CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE

Change order defined…  A written agreement to modify, add to or otherwise alter the work, timing or payment set forth in the original contract documents, for an agreed upon sum or compensation, which is signed by both parties to the original agreement.

Reasons for changes…  Change of purpose or need…  Changes to methods or manner of work...  Correct errors or omissions…  Differing site conditions…  Value engineering…  Contractor suggestions…  Almost any other reason not envisioned when the original contract was written.

Timing of changes…

Types of change orders…  Oral change orders  Written and/or directed change orders  Bilateral change orders  Unilateral change orders  Constructive change orders

Oral change order…  An oral directive to accomplish work that is not part of the original scope of work.  May be issued by the owner’s rep or other party representing the owner.  May be precluded by the contract, but will be upheld in court if the contractor performs work that is accepted.  Very dangerous because terms may not be clear, conditions may change, memories may differ as to what was agreed.

Written or directed change…  A formal document directing a change in scope or method.  Generally bilateral, but not essential.  Becomes part of the contract.  Issued before work is accomplished.  Parties agree on specific scope and associated costs.  Culminated by “notice to proceed”.  Signed by parties authorized by the owner and builder.

Unilateral change…  Used in emergency situations or when time does not permit a fully processed bilateral change.  May be issued over builder’s protest.  May be backed by law in government contracts.  Intended to expedite a necessary change to the contract.  Must be replaced by a written bi- lateral change

Bilateral change…  Both parties agree to the scope and terms of the agreement.  The normal or desired form of change.

Constructive change…  An “informal” act that authorizes or directs a modification to the contract.  May be act of commission or omission.  Must be claimed in writing by the contractor within a specified time (usually 10 days).  These are a major source of disputes.

Situations for constructive change…  Engineer’s interpretation of work.  Improper inspection or rejection.  Impossibility or impracticability of performance.  Unclear/conflicting contract documents.  Owner fails to decide in timely manner.  Unclear standards of work.

Change order process…  Identify of need/reason for change  May be initiated by owner or contractor  Initiator prepares detailed scope  Change approved by owner  Submit to designer of record for approval  PM makes detailed cost estimate  CM makes detailed estimate  Negotiate final cost (PM & CM)  Owner agrees & signs change document  Notice to proceed issued to contractor

Change order process…

Change order request… Proceed to Approval

Change order approval… Begin Approval Process

Change order cost estimate(s)…  Study the plans  Organize your estimate  Determine critical items & dimensions  Determine materials & methods  Determine quantities & labor  Calculate the cost of each item  Add taxes + overhead & profit  Negotiate with the contractor

Making a detailed estimate  Take-off (count) quantities from plans  Determine cost of materials in units  Determine cost of labor in units  Calculate cost of materials + labor  Add sales taxes on materials (6%)  Add labor taxes on labor cost (~25%)  Add Overhead & Profit (~10%) Note: obtain costs from RS Means or similar data

Foundation excavation-1…

Foundation-2… Excav

Foundations…  Concrete…  volume of concrete in CF  cost of concrete in $$$/CF  cost of labor in $$4/CF  Excavation  volume of excavation in CF  cost of excavation labor in $$$/CF  cost of equipment in $$$/CF or $$$/HR  Foundation Cost = sum(conc + excav + labor)

Masonry walls… W1 W2 W3/W6 W4 W5 W7 W8 W9 12”CMU 8” CMU Insul Brick

Walls…  Walls…  length of walls in LF  height of walls in LF  area of walls in SF  cost of wall material in $$$/SF  cost of wall labor in $$$/SF  cost = material + labor  Repeat for different materials  Add all components for total cost of walls

Floor slab… FS-1 FS-2

Floor Slab…  Floor Slab  length of floor-1 in LF  width of floor-1 in LF  depth of floor-1 in LF  volume of concrete in CF  cost of concrete in $$$/CF  cost of labor in $$$/CF  repeat for floor-2  Floor = slab-1 + slab-2

Cost of Change Order  Cost of foundations + cost of walls + cost of floor slabs + other costs  Sum cost of all materials  Sum cost of all labor  Add sales taxes on materials (6%)  Add labor taxes on labor cost (~25%)  Add totals  Add Overhead & Profit (~10%)  Final estimate of change order

Impact costs…  Unforeseen costs that impact the progress of work as a result of the change, but are not calculated, or agreed to, at the time that the change is made.  Usually expressed as a claim for additional work at the end of a contract.  Some contracts may preclude these, but courts may honor them if actual costs or burden can be proven.

Format for Change Order

HW #7

Almost the last slide…  Change Order Estimate  Due Nov 10

Questions…