Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.

Slides:



Advertisements
Similar presentations
Perspectives for an energy increase of MAMI C Andreas Jankowiak Institut für Kernphysik Johannes Gutenberg – Universität Mainz Cristal Ball.
Advertisements

1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/ Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
K.T. McDonald DoE Review Aug. 10, E-166 Experiment E-166 is a demonstration of undulator-based polarized positron production for linear colliders.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
Status and new developments at ASTRID2 ESLS XXII, Grenoble 25-26/ Niels Hertel, ISA University of Aarhus, Denmark.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
RF particle acceleration Kyrre N. Sjøbæk * FYS 4550 / FYS 9550 – Experimental high energy physics University of Oslo, 26/9/2013 *k.n.sjobak(at)fys.uio.no.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
Mitglied der Helmholtz-Gemeinschaft Petersburg Nuclear Physics Institute, Russia Storage cells for internal experiments with Atomic Beam Source at the.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
ELENA Support system 6/11/2014 Antti Kolehmainen on behalf of WP Support system
Low Emittance RF Gun Developments for PAL-XFEL
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Linac Status June 16, 2015 Time Meeting D. Raparia.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
ELECTRON MOVING AT CONSTANT VELOCITY
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
First Experiments with the Polarized Internal Gas Target (PIT) at ANKE/COSY Ralf Engels for the ANKE-Collaboration Institut für Kernphysik, Forschungszentrum.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
Status Report of the Realignment for J-PARC 3GeV RCS N. Tani, H. Hotchi, M. Yamamoto, J. Kamiya, K. Horino, M. Kinsho J-PARC Center, JAEA 1 Outline 1.
MAX IV linac overview and scope of automation Sara Thorin.
October 14, 2004SPIN20041 The Bates South Hall Ring: A Unique Instrument for Studying Polarization D. Cheever, K.Dow, M. Farkhondeh, W. Franklin, D. Hasell,
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Report Technical Director Storage-Ring-Installation Completed
High energy beam transport.
Status of HESR 18th March Gießen Dieter Prasuhn.
J-PARC main ring lattice An overview
Sara Thorin, MAX IV Laboratory
Options and Recommendations for TL and Dumps
Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.
Tango status at Elettra
CLIC Undulator Option for Polarised Positrons
Compact and Low Consumption Magnet Design The DESY Experience

Beam Injection and Extraction Scheme
Potential Use of PEP-II Magnets by Project X
LCLS Gun Commissioning Status & Plans David H
FFAG Accelerator Proton Driver for Neutrino Factory
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Extraction Michael Bevins May 17, 2007
ThomX – Commissioning Meeting – 25/01/2018
Bunch Compressor Beam Line Optics
MEIC Alternative Design Part V
Electron mode A B C D > 4 GeV e- θ g e- DR α PS
Isotope Readiness Review Run Plans
Presentation transcript:

Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006

The Harmonic Double Sided Microtron (HDSM) for MAMI C LINAC I (4.90GHz) LINAC II (2.45GHz) 10m 43 turns B=1.539T max I n j e c t i o n M e V E x t r a c t i o n M e V No. 2 No. 1 No. 4 No. 3 Matching-Section 4.90GHz

Status at the Glasgow-Meeting:

The next months (Sept): Final setup and technical commissioning of the 4.90 GHz linac, rf-systems, magnets and beam diagnostics devices of the linac axis. first injection test

Vacuum tubes and steering magnets 193 tubes („harp“), 384 steering magnets

first vacuum chamber manufactured in the Institute 7m All 4 dipole vacuum chambers were fully manufactured at KPH (welding of Al bars and plates) and are installed. 90° bending dipoles vacuum chambers free aperture in x: ± 8mm and y: ± 7mm

Next steps: (2006) first tests in diagnostic pulse mode (very low beam power) up to max. energy of 1.5 GeV guiding beam in the beam transfer tunnel tests in cw-operation and high current (100  A) tests of all beam transfer systems (A1, A2, A4) first tests for experiments (only 1.5 GeV) From 2007 on: beam for experiments (1500 MeV, tests, data taking) optimal orientation of polarization in all halls and for all energies possible by use of Wien-filter variable beam extraction (in steps of ~15 MeV between 872 MeV and 1320 MeV, and 1500 MeV)

Beam Extraction: correction magnets

Extraction System of the HDSM turn 43 fixed extraction magnet (1.5GeV) turn 30 turn 1 movable extraction magnet (0.87GeV – 1.32GeV) Extraction beam paths