Adaptive Signal Control Initiatives and Validation Program Presenters Edward Fok, FHWA Resource Center Transportation Technology Specialist Dr. Douglas.

Slides:



Advertisements
Similar presentations
William Lohr, P.E Federal Highway Administration Minnesota Division Office.
Advertisements

Structural Design Program Review Massachusetts Department of Transportation September 20-23, 2011.
ODOT-OES Environmental Update Meeting September 16, 2010.
Intelligent Transportation Systems GDOT ITS Concept of Operations Presentation to ITS GA June 28, 2007.
EDC Summit State-based Technology Discussions 1. The Innovations Warm Mix Asphalt (WMA) Precast Bridge Elements Geosynthetic Reinforced Soil Safety Edge.
EDC Summit Technology & Innovation Plenary 1. The Innovations Warm Mix Asphalt (WMA) Precast Bridge Elements Geosynthetic Reinforced Soil Safety Edge.
Planning for Success: Applying Systems Engineering to ASCT Implementation TRANSPO 2012 October 29, 2012 Eddie Curtis, PE FHWA Office of Operations / Resource.
1 Prescriptive Process Models. 2 Prescriptive Models Prescriptive process models advocate an orderly approach to software engineering Prescriptive process.
Utah’s Use of CMGC & Project Delivery
Capital Investment Program Listening Session Presented at APTA Annual Meeting -- 10/03/2012 RailVolution /14/
Research Advisory Committee Annual Meeting FHWA Briefing Michael Trentacoste Associated Administrator Research, Development, & Technology Director, Turner.
Planning for Success: Applying Systems Engineering to ASCT Implementation MOITS – Traffic Signals Subcommitte National Capital Region Transportation Planning.
1. George Washington Lead Change December 25, 1776, Trenton, New Jersey 2.
Module 1 What are Prefabricated Bridge Elements & Systems for Accelerated Bridge Construction (ABC/PBES)? Module 1 What are Prefabricated Bridge Elements.
SHRP2 Implementation | July 22, 2014 Implementation Update AASHTO RAC Meeting, July 22, 2014 Debra Elston, Director, Office of Corporate Research, Technology,
FHWA Update 2011 VOBug Meeting Helena, MT Thomas Saad, P. E. FHWA Resource Center Phone:
SHRP2 Implementation Update to the Standing Committee on Highways Pam Hutton, AASHTO May 29,
THANK YOU  John Horsley and the entire leadership of AASHTO  AGC of America and ARTBA (American Road and Transportation Builders Association)  NACE,
Wisconsin DOT EDC Initiatives Rory Rhinesmith, P.E. Deputy Administrator – DTSD Bureaus.
Moving Research into Practice.  Implementation is the routine use of a SHRP 2 product by users in their regular way of doing business.  Users can include.
PROJECT DESCRIPTION BORDER WAIT TIME WORKING GROUP.
TRIBAL INVOLVEMENT IN EVERY DAY COUNTS IVAN MARRERO, P.E. ASSISTANT DIVISION ADMINISTRATOR FHWA-OKLAHOMA DIVISION.
Oregon Jobs and Transportation Act Section 18 External Stakeholder Meetings.
 ELECTRI Council Meeting  Information Technology Assessment for Line Electrical Contractors Vanessa Valentin, Ph.D. Assistant Professor Department of.
Mike Bowen FHWA – Kansas Division Fall TOPICS Trust Fund Status Reauthorization/Funding Every Day Counts III Performance Management Rulemaking.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
ADAPTIVE SIGNAL CONTROL TECHNOLOGY MODEL SYSTEMS ENGINEERING DOCUMENTS 1 December 20, 2012.
T3 Webinar September 2012 Measures of Effectiveness and Performance Evaluation Procedures to Validate Traffic Signal Operational Objectives Douglas Gettman,
FHWA Resources Promoting Adoption of Operations Jeffrey A. Lindley NTOC Summit November 7, 2011.
PennDOT’s Study of NCHRP Research Results Implementation TRB State Representatives & AASHTO National RAC Meetings July 27, Michael Bonini Transportation.
North Central Texas Council of Governments Transportation Department Summary Presentation January 2004 MOBILITY 2025: THE METROPOLITAN.
FHWA Update Butch Wlaschin, P.E. Director, Office of Asset Management AASHTO Highway Subcommittee on Construction 2010 Annual Meeting Burlington, Vermont.
MARYLAND FREIGHT SUMMIT Freight in the Mid-Atlantic Region Jeffrey F. Paniati Associate Administrator for Operations Federal Highway Administration September.
Efficiency through technology and collaboration SHRP2 and Every Day Counts Products September 9, 2015 David Otte - KYTC Jason J. Siwula, PE – KYTC.
FHWA Update AASHTO Subcommittee on Design July 26, 2010 Columbia, South Carolina Jon Obenberger, Ph.D., P.E. Preconstruction Team Leader Infrastructure.
Highway Transportation Engineering ITS Case Study Component 1 – Student Guide.
What’s New with County Road Construction Bruce G. Stelzner Bruce G. Stelzner Chippewa County Highway Commissioner Chippewa County Highway Commissioner.
1 Accommodating Utilities in Highway Rights-of-Way Federal Agency Update IRWA/AI Conference Las Vegas, NV January 13, 2009.
Community Context Audits And Public Involvement Plans Rickie Clark, INDOT Joyce Newland, FHWA Presenter Title, INDOT Event Date.
Projects of National and Regional Significance Program.
Mn/DOT and Economic Development ACEC Annual Meeting March 2, 2010.
Regional Concept of Transportation Operations: The Hampton Roads Experience Presented by: Camelia Ravanbakht, PhD Talking Technology & Transportation (T3)
Adaptive Signal Control Technology: Bringing a Systems Approach to Implementation and Evaluation October 18, 2011 Kevin Fehon, P.E., PTOE DKS Associates.
STANDING COMMITTEE ON HIGHWAYS BUSINESS MEETING FHWA Updates Walter C. Waidelich, Jr. Associate Administrator for Infrastructure May 29, 2014.
IEEE Activities in Smart Grid & Green Technologies Dr. Bilel Jamoussi South Africa 26 October 2009.
Implementation: Results from the Using Your Regional ITS Architecture Peer Exchange Network Workshop Mac Lister FHWA Resource Center ITS America Annual.
Wireless Sensor Network Solutions Regional Mobility Solutions Sensys Networks and the Sensys Networks logo are trademarks of Sensys Networks, Inc. Other.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
CS223: Software Engineering Lecture 2: Introduction to Software Engineering.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
SHRP2 Capacity Implementation | February 2013 When Research Meets the Road Capacity Focus Area February 4, 2013.
National ITS Architecture Deployment Support October 27, 2009 T3 Webinars are brought to you by the ITS Professional Capacity Building Program (ITS PCB)
Module 1 Introduction Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users.
1 Briefing on the TPB Transportation Planning Process Certification Summary Report Sandra Jackson Federal Highway Administration Transportation Planning.
Winton Emmett, Chief Project Implementation North January, 2016 Division of Local Assistance John Hoole, Chief Project Implementation South.
1 NTOC Talking Operations – Road Weather Management – September 30, 2008 VII & Road Weather Pat Kennedy, Transportation Specialist FHWA/Office of Operations,
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
U.S. DOT Next Generation Project: A National Framework and Deployment Plan Summit for Large Cities Chicago, IL – May 21, 2009.
Adaptation to Climate Change and the European standardization Madrid, 18 January 2016 Andrea NAM Programme Manager, CEN-CENELEC © CEN-CENELEC
Purdue Road School March 8, EDC Pillars Shortening Project Delivery Accelerating Technology and Innovation Deployment.
1 NTOC Talking Operations – Road Weather Management – September 30, 2008 PERFORMANCE MEASURES FOR ROAD WEATHER MANAGEMENT Roemer Alfelor FHWA Road Weather.
FTA Mobility on Demand Funding: Overview of Program and Partner Opportunities June 1, 2016.
Some Thoughts on Improving Pavement Research Implementation
2013 Nevada Transportation Conference
Bell Road Adaptive Signal Control Technology (ASCT) Deployment Project
Overcoming Barriers to Implement Research Projects
Are your Traffic Signals Ready for Automated Traffic Signal Performance Measures? NOCoE Webinar June 15, 2017.
SPR-B Research Coordination Webinar
DESIGN-BUILD PROGRAM OVERVIEW
STANDING COMMITTEE ON HIGHWAYS BUSINESS MEETING FHWA Updates Walter C
Presentation transcript:

Adaptive Signal Control Initiatives and Validation Program Presenters Edward Fok, FHWA Resource Center Transportation Technology Specialist Dr. Douglas Gettman, Kimley-Horn & Associates Edward Smaglik, Northern Arizona University Assistant Professor of Civil Engineering

Better, Faster, Smarter Shortening Project Delivery Planning & Environmental Linkages Legal Sufficiency Enhancements Expanding Use of Programmatic Agreements Use of In–Lieu Fee and Mitigation Banking Clarifying the Scope of Preliminary Design Flexibilities in ROW Flexibilities in Utility Accommodation and Relocation Enhanced Technical Assistance on Ongoing EISs Technology Innovation Warm Mix Asphalt Precast Bridge Elements Geosynthetic Reinforced Soil Safety Edge Adaptive Signal Control Technology (ASCT)

What have we learned… Systems produce substantial benefits over coordinated TOD signal timing – Travel time, Delay, Emissions, Congestion, Safety Most effective where: – demand conditions are Variable and unpredictable – Linear Arterials, limited success within tight grids – Under Saturated

Barriers to Adoption of ASCT  Complexity  Cost  Uncertainty about Benefits 4

Validation Program for ASCT Generic Process and tools to measure any benefits from deployment of ASCT Complementary to the Model System Engineering Document

What is Validation? Validation: Objectives are tested – Did it do what we want it to do? Verification: Requirements are tested – Did we get what we asked for?

Model Systems Engineering Document for ASCT Systems Basic Systems Engineering Deliverables Concept of Operations Requirements High Level Design Verification Plan Validation Plan 7

Model SE Document for ASCT Needs Validation Verification Requirements Design & Implementation 8 Testing

ASCT Validation Process Needs Validation Verification Requirements Design & Implementation 9 Testing

Our Goals for Today Describe the challenges to validate ASCT Describe the theoretical underpinning of our approach. Describe the tools and the process developed to validate ASCT and the plans to test these techniques in Mesa, Arizona.

Questions?