Interplay of transverse damper and crab cavities W. Hofle BE/RF/FB W. Hofle, 4th Crab Cavity Workshop16-Dec-10 Acknowledgements: RF group, G. Arduini,

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Ion instability at SuperKEKB H. Fukuma (KEK) and L. F. Wang (SLAC) ECLOUD07, 12th Apr. 2007, Daegu, Korea 1. Introduction 2. Ion trapping 3. Fast ion instability.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Introduction to the High Bandwidth Transverse Feedback W. Hofle on behalf of HBTFB Team Proposed New System vs. Existing Feedback System Brief History.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
W. LHC Studies WG Day Review MDs Transverse Damper from Run1 to Run2 reported by W. Hofle for ADT & friends LHC MSWG Special Meeting.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Update on Crab Cavity: Impedance (at fundamental), RF noise, operational scenario P. Baudrenghien, R. Calaga, T. Mastoridis March 21 st, th HiLumi.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
LHC transverse Damper Observations versus expectations W. Hofle BE/RF/FB CERN BE-RF team for ADT L. Arnaudon, P. Baudrenghien, A. Butterworth, G. Cipolla,
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Beam dynamics in crab collision K. Ohmi (KEK) IR2005, 3-4, Oct FNAL Thanks to K. Akai, K. Hosoyama, K. Oide, T. Sen, F. Zimmermann.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
W. Hofle / March 5, 2008 Extended LTC meeting 1/22 Acknowledgements: P. Baudrenghien, A. Butterworth, E. Ciapala, B. Goddard, A. Koschik, F. Killing, G.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
LHC Wire Scanner Calibration
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Beam-beam effect with an external noise in LHC
Longitudinal beam parameters and stability
Wire, flat beams and beam-beam MDs in 2017
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Transverse Feedback System (LHC Damper)
LHC Emittance Measurements and Preservation
Luminosity Optimization for FCC-ee: recent results
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Monday 18 October : Collimation system
Tuesday TOTEM and transverse loss map (1) OK
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
SPS Transverse Damper System
Limits on damping times
Monday February 28th 8h00: Injection
Check of filamentation time with octupoles on and damper off
Summary Thursday h21: Stable beams fill #1303.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

Interplay of transverse damper and crab cavities W. Hofle BE/RF/FB W. Hofle, 4th Crab Cavity Workshop16-Dec-10 Acknowledgements: RF group, G. Arduini, R. de Maria

Outline  Motivation: Scenarios for crab cavities and LHC transverse damper  Demonstrated performance of LHC transverse damper in 2010 run  Relevant parameters for mitigation of blow-up related to crab cavity noise  Bunch trains scaling to 7 TeV and possible improvements in transverse damper  Summary and possible studies at the LHC W. Hofle, 4th Crab Cavity Workshop16-Dec-10

Motivation  main RF phase error results in time of arrival error in the crab cavity  consequently beam receives dipole kicks in crab cavity  can give rise to coherent motion and emittance increase due to random kicks, also coherent instabilities (see R. Thomas’ talk)  mitigations:  low RF phase noise (see Philippe Baudrenghien’s talk)  operate transverse feedback to suppress random transverse excitation and cure coherent instability, needs operation of transverse feedback with colliding beams W. Hofle, 4th Crab Cavity Workshop16-Dec-10  transverse impedance of crab cavities (installed at high  ) drives coherent instabilities that can be cured by transverse damper (see E. Shapochnikova’s talk)  question of whether we can operate the transverse feedback system with colliding beams is very important to the crab cavity scheme

Scenario for crab cavity  crab cavities made invisible to beam until beams collide and voltage ramped up by detuning and/or active feedback  crab crossing activated with colliding beams  important for transverse FB: local versus global crab crossing scheme  in global scheme additional issue that the head tail movement can produce a false signal in the damper pick-ups  this can be mitigated by having damper pick-ups at a multiple of  phase advance from the IP 1/5 (maybe good for local scheme, too) W. Hofle, 4th Crab Cavity Workshop16-Dec-10  local scheme easier as there should be no headtail motion around the ring  in global scheme more difficult to get clean damper pick-up signals  possibility of a headtail feedback (at high frequency) to damp any residual head tail movement could be considered (global scheme)

Original scenario for LHC damper  use transverse damper for injection oscillation damping  use for tune measurement, PLL as required, as an exciter (abort gap cleaning)  cure coupled bunch instabilities at 450 GeV, during ramp and at top energy, when required  switched off damper with colliding beams (stability provided by beam-beam tune spread)  but actually used in collision  key point in design is BPM resolution in the micrometer range, to limit emittance increase  reduce effect of external perturbations on beam (new “hump”) W. Hofle, 4th Crab Cavity Workshop16-Dec-10

Demonstrated performance of LHC damper 2010 run W. Hofle, 4th Crab Cavity Workshop16-Dec-10

W. Hofle, 4th Crab Cavity Workshop  excitation: of transverse oscillations, tune meas. / abort gap cleaning … Pick-up 1 Kicker Signal processing  beam  signal Pick-up 2  gain g need real-time digital signal processing Match delays: t signal = t beam + MT 0 T 0 : beam revolution time M=1: very common -> “One -Turn-Delay” feedback But M>1 also possible phase and delay adjustments  feedback: curing transverse coupled bunch instabilities  damping: of transverse injection oscillations Transverse Damper / Feedback 16-Dec-10

W. Hofle, 4th Crab Cavity Workshop The LHC Transverse Damping System high power part  26 kickers  16 wideband amplifiers, i.e. 32 tetrodes in total (RS2048 CJC, 30 kW) Damper system Beam 1 IP4 damper kicker Beam 2 Wideband amplifier Unit HHVV HHHH VVVV HHHH VVVV Module Naming: #1 to #16 (power team), H1, H2, H3, H4, V1, V2, V3, V4.B1/B2 Module share common resources, power converters, LL 16-Dec-10 > 900 kV integrated kick strength

ADT amplifiers in tunnel point 4 RB44 and RB46 W. Hofle, 4th Crab Cavity Workshop16-Dec-10

beam position VME module signal processing VME module DSPU (“Damper Loop”) based on 1T-FB module Overview of signal processing commission in A3 commission in A4 intensity nomalised bunch position digitised and synchronised (two pick-ups) 4 x i.e. one system per beam and plane W. Hofle, 4th Crab Cavity Workshop16-Dec-10

Time line of LHC damper commissioning 2010  Marchset-up of damper BPM front-ends for pilot beam (later repeated for higher intensity)  injection damping beam 2 vertical (V.B2) commissioned  turns damping time, 125 hours GeV, V.B2  V.B1 injection damping commissioned  H.B1 and H.B2 injection damping commissioned  Junecommissioning damper in ramp, switch to high intensity  first use of feedback with colliding beams  set-up for 150 ns bunch trains  noise improvements < 2  m resolution (rms) achieved  gain increase for “hump” mitigation, < 20 turns damping time (450 GeV)  ns set-up (means more bandwidth required from damper)  ecloud studies comparing 50 ns and 75 ns bunch spacing W. Hofle, 4th Crab Cavity Workshop16-Dec-10

W. Hofle, 4th Crab Cavity Workshop damper offdamper on First Damping of Injection errors 16-Dec-10

Injection damping fill 1268 (August 9, 2010) horizontal plane beam 1 W. Hofle, 4th Crab Cavity Workshop 450 GeV: Initial operation in gain data logged since summer, can be retrieved for analysis 16-Dec-10

Reducing effect of external perturbations using the transverse feedback “hump control” the “hump” is an external perturbation (not an instability) seen in LHC that moves in frequency with time and changes its strength  a high gain is required in the feedback to reduce effects on the beam narrow range of tune acceptance due to 7 tap FIR filter, but blow-up caused only around betatron frequency where beam reacts  good performance in terms of S/N of damper pick-up signal processing permits to run at high gain, is essential, 7 tap filter helps to use both available pick-up signals to their maximum W. Hofle, 4th Crab Cavity Workshop16-Dec-10

Hump mitigation measures We can see the hump and the damper can act on its amplitude TFB OFF -10 dB -24 dB -10 dB -20 dB W. Höfle, R. De Maria See talk by G. Evian Dec-10W. Hofle, 4th Crab Cavity Workshop

Emittance evolution during tests with strong damping at 450 GeV following these tests we switched to high gain at 450 GeV with damping times of less than 20 turns to mitigate effect of hump issue for tune feedback, needed to reduce gain at start of ramp to permit lock Noise in the TFB pick-up compatible with operation at high gain  might see some small blow-up above - 10 dB To be compared with ~1.5-2  m/h observed for B2-V in the presence of hump F. Roncarolo -20 dB OFF 0 dB -6 dB -20 dB -10 dB 0 dB -20 dB OFF 0 dB -6 dB -20 dB OFF 0 dB -6 dB -24 dB -14 dB -4 dB -10 dB reported by G. Evian 2010

damper on, then collapse separation bumps high gain for crab cavity mitigation 20xx squeeze damper not used in 2010 foreseen for 2011 maintain damping time in ramp (exact function for 2011 to be implemented) strong damping (not used in 2010) injection damper gain cycle time Q-FB on Damper gain: 2010 and evolution W. Hofle, 4th Crab Cavity Workshop16-Dec-10 increased damping for hump mitigation 2 nd half of 2010

Damper tests at 3.5 TeV with different gains tests of August 16, 2010 fill 1287 with colliding beams Status at that time:  operationally we used a gain setting of -19 dB for all TeV with colliding beams; damper switched on before beams are put in collision  different  -functions lead to effectively different damping rates for the two beams and planes, exact damping rates not exactly known aims of tests:  check the damping at 3.5 TeV with colliding beams (in an end of fill study)  establish damping rate at 3.5 TeV with colliding beams before different gains are applied method:  use Q-kickers to kick one beam at a time (apply full kick strength)  observe signals in damper (8192 turns), closed loop as function of gain setting 16-Dec-10W. Hofle, 4th Crab Cavity Workshop

Fill #1287  filling pattern: 25b_16_16_16  0.95x10**11 injected  emittances (20h19) before ramp in  m: beam 1 (H/V): 2.6 / 2.4, beam 2 (H/V): 3.0 / 3.3  stable beams at 23h01  initial luminosity: 3.56x10 30 at approx. 0.92x10 11  luminosity proportional to luminosity decay observed: 0.66x 0.66  (20.5/23) 2 = 0.79 [from intensity decay] x 0.84 [from emittance increase]  emittances were roughly 3.2 / 3.4 for beam 1,and for beam 2 H 3.6 and V 4.6 (maybe with tails, can be checked in more details from logging, BSRT/FBCT/Lumi) beam-beam tune shift; 3 collisions:  = 3x = ; (taking 0.82x10 11,  avg = 3.66  m) initial at start of fill:  = Beam conditions 16-Dec-10W. Hofle, 4th Crab Cavity Workshop

Observation of bunch 1 of both beams in collision collision pattern (observation of bunch 1 in the following): (filling pattern: 25b_16_16_16) Beam 1 bunch 1  Beam 2 bunch 1IP1 Beam 1 bunch 1  Beam 2 bunch 1IP5 Beam 1 bunch 1  Beam 2 bunch 8911 IP2 Beam 1 bunch 8941  beam 2 bunch 1IP8 The two bunches 8941 and 8911 have only two head on collisions. beam-beam tune shift: 3 collisions:  = 3x = (at time of experiment: taking 0.82x10 11,  avg = 3.66  m) [ initial at start of fill:  = ] 16-Dec-10W. Hofle, 4th Crab Cavity Workshop

Time domain data (-25 dB and -7 dB gain) horizontal plane, beam 1 data from bunch 1 oscillations (8192 turns), Qkicker used at full strength gain setting: -25 dB and -7 dB, beam 1 kicked, horizontal plane factor 8 gain increase on one beam does not lead to a factor 8 increase of damping  beams coupled, gain for damper on other beam was kept constant -7 dB -25 dB beating of  and  modes well visible for low damper gain factor 8 gain increase 16-Dec-10W. Hofle, 4th Crab Cavity Workshop

Damper used at 3.5 TeV with different gains (horizontal plane) red: beam 2 kicked gain beam 2 damper increased x16 in steps of x2 blue: beam 1 kicked gain beam 1 damper increased x16 in steps of x2 Data from bunch 1 oscillations (8192 turns) gain setting: -25 dB to -1 dB in steps of 6 dB (-19 dB used operational) 16-Dec-10W. Hofle, 4th Crab Cavity Workshop

Damper used at 3.5 TeV with different gains (vertical plane) red: beam 2 kicked gain beam 2 damper increased x16 in steps of x2 blue: beam 1 kicked gain beam 1 damper increased x16 in steps of x2 Data from bunch 1 oscillations (8192 turns) gain setting: -25 dB to -1 dB in steps of 6 dB (-19 dB used operational) 16-Dec-10W. Hofle, 4th Crab Cavity Workshop

analysis: U. Wienands 3.5 TeV: Kicking non colliding bunch with damper on (20 August 2010) used Qkicker to kick the beam and synchronised observation with damper 16-Dec ms damping time

W. Hofle, 4th Crab Cavity Workshop analysis U. Wienands Damping time versus gain at 3.5 TeV 16-Dec-10 final operation in 2010

W. Hofle, 4th Crab Cavity Workshop Damping time versus gain at 3.5 TeV  suggests practically no or very little damping at zero gain analysis U. Wienands 16-Dec-10

W. Hofle, 4th Crab Cavity Workshop Damping times achieved and canonical operation in 2010 implementation of trim of gain in physical parameters for 2011 (damping time) set gain to equal values in all planes for all beams for 2011, maintain constant damping time during the ramp (needs update of control system software LSA) 20 to 40 turns damping also tested at 3.5 TeV, but not used during Physics runs

Relevant parameters emittance increase due to external perturbation (like through crab cavity), or “kicker” noise pick-up signal noise damper gain, measure of fraction of oscillation detected that is corrected V. Lebedev, V. Parkhomchuk, V. Shiltsev, G. Stupakov, SSCL Pre-print (1993) run at high gain, limited by PU noise (possibly also stability issues)

From numerical simulations K. Ohmi san et al. (PAC 2007) 7 TeV with nominal emittances (3.75  m):  = 0.22 mm at  =100 m  0.6% would be 1.3  m corresponds at 3.5 TeV to 1.8  m  achieved already today some margin from higher beta’s at pick-ups, i.e. beam is actually larger than 0.22 mm at our pick-ups if  > 100 m, so should be ok today already working with higher intensities/lower emittances will result in higher beam - beam tune spread and hence requires proportionally better resolution of PUs RF noise will determine at what gain we need to run given a certain tune spread Maximum gain in transverse FB will be limited by stability issues (< 10 turns difficult) for an emittance life-time of 1 day at with an RF noise characterized by a correlation time and an amplitude (0.22 mrad)  need 0.6% PU resolution (with respect to beam size) nominal tune spread by beam-beam

Bunch trains  from noise point of view: RF phase noise filtered by cavity  hence bunch by bunch fluctuations expected to be small  gain roll-off of transverse feedback therefore not considered an issue for mitigation of transverse excitation  slight time of arrival variation from bunch to bunch due to beam loading in main RF  kicks by CC if CC voltage does not follow this modulation, result is a different orbit for the bunches orbit effect is not an issue for damper, but may need quantification  gain roll-off can be an issue for instability damping, E. Shaposhnikova took conservative approach with respect to damping times (450 GeV) available from transverse feedback (i.e. take slower rate  20 MHz) W. Hofle, 4th Crab Cavity Workshop16-Dec-10

Potential damper S/N improvements towards 7 TeV and needs  beam will be smaller so pick-up resolution normalized to beam size worse  sqrt(2) improvement required to maintain current performance  use of more pick-ups (averaging improves S/N)  higher beta functions at pick-ups (comes for free with CC scheme in collision ?)  electronics improvements / cabling to be quantified (start with this …) W. Hofle, 4th Crab Cavity Workshop16-Dec-10

Summary  nominal damping times of transverse feedback system achieved in 2010  validates assumptions for transverse impedance limits for CC  used with colliding beams at 3.5 TeV with moderate gain setting  promising for CC  bunch train operation with 50 ns spacing started  25 ns is goal  scaling to 7 TeV requires some improvement in damper S/N to maintain same performance as at 3.5 TeV, potential to do so exists  studies with high gain and colliding beams and high gain advised in LHC to understand better this regime (quantify emittance blow-up as function of damper noise and gain) BPM resolution ok for nominal beam however limit RF noise as we have stability limits for transverse damper and higher tune spread needs improvement in damper BPM resolution (beta functions ?) W. Hofle, 4th Crab Cavity Workshop16-Dec-10