LIGO-G010075-00-D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.

Slides:



Advertisements
Similar presentations
Gravitational Wave Astronomy Dr. Giles Hammond Institute for Gravitational Research SUPA, University of Glasgow Universität Jena, August 2010.
Advertisements

19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
8/13/2004 Stefan Ballmer, MIT / LIGO Hanford 1 Length and angular control loops in LIGO Stefan Ballmer Massachusetts Institute of Technology LIGO Hanford.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Spring LSC 2001 LIGO-G W E2 Amplitude Calibration of the Hanford Recombined 2km IFO Michael Landry, LIGO Hanford Observatory Luca Matone, Benoit.
LIGO-G D Detector Installation and Commissioning Stan Whitcomb NSF Annual Review 30 April 2001 Caltech.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
Locking improvements after the end of VSR1 Gabriele Vajente for the Locking Group 14 th ILIAS WG1 meeting Cascina – March 6 th 2008.
Polarization Techniques for Interferometer Control Peter Beyersdorf National Astronomical Observatory of Japan LSC March 2002 Advanced Configurations LIGO-G Z.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
E2E school at LLO1  Han2k »Model of the LHO 2k IFO »Designed for lock acquisition study  SimLIGO1 »Model of all LIGO 1 IFOs »Designed for –noise hunting.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
NSF : Nov. 10, LIGO End to End simulation overview  Time domain simulation written in C++  Like MATLAB with Interferometer toolbox  Major physics.
Matthew Evans, Ph237 April Application of Simulation to LIGO Interferometers  Who am I? »Matthew Evans, Ph.D. from Caltech on Lock Acquisition 
LIGO-G W Where Did the LSC Signals Come From? Fred Raab 27 June 02.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
Koji Arai – LIGO Laboratory / Caltech LIGO-G v1.
Virgo Control Noise Reduction
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
LIGO-G D Installation and Commissioning Status Stan Whitcomb Program Advisory Committee 14 June 2001 Caltech.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
LIGO-G Z LIGO Commissioning Report LSC Meeting, Hanover August 19, 2003 Peter Fritschel, MIT.
Interferometer Control Matt Evans …talk mostly taken from…
1 1.ISC scope and activities 2.Initial Virgo status 3.Design requirements 4.Reference solution and design status 5.Plans toward completion 6.Technical.
Amaldi conference, June Lock acquisition scheme for the Advanced LIGO optical configuration Amaldi conference June24, 2005 O. Miyakawa, Caltech.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
LIGO-G D The LIGO-I Gravitational-wave Detectors Stan Whitcomb CaJAGWR Seminar February 16, 2001.
LIGO-G D “First Lock” for the LIGO Detectors 20 October 2000 LIGO Hanford Observatory Stan Whitcomb.
Enhanced LIGO with squeezing: Lessons Learned for Advanced LIGO and beyond.
G D LSC Changes in Preparation of High Power Operations Commissioning Meeting, May 5, 2003 Peter Fritschel, Daniel Sigg, Matt Evans.
LIGO- G R Amaldi7 July 14 th, 2007 R. Ward, Caltech 1 DC Readout Experiment at the Caltech 40m Laboratory Robert Ward Caltech Amaldi 7 July 14.
Matt Evans, LSC March 2003 (G E)1 Lock Acquisition in LIGO  Who am I? »Matt Evans »Caltech graduate  What is Lock Acquisition? »The process.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
LIGO-G D Commissioning, Part II PAC 12, June 2002 Peter Fritschel, LIGO MIT.
Conversion of the Glasgow 10m Prototype for Detuned Operation Bryan Barr Institute for Gravitational Research University of Glasgow LSC - AIC August 13.
LSC-March  LIGO End to End simulation  Lock acquisition design »How to increase the threshold velocity under realistic condition »Hanford 2k simulation.
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
Lisa Barsotti - University and INFN Pisa – on behalf of the Virgo Collaboration CASCINA - January 24 th, 2005 ILIAS  Locking of Full Virgo Status of VIRGO.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G D Commissioning and Detector Plans Stan Whitcomb Program Advisory Committee 6 June 2003 Caltech.
G Z Test Mass Butterfly Modes and Alignment Amber Bullington, Stanford University Warren Johnson, Louisiana State University LIGO Livingston Detector.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
LIGO- G M Paths to Improving Detector Performance Rainer Weiss, David Shoemaker NSF Review Caltech, 30 April 2001.
LSC Meeting at LHO LIGO-G E 1August. 21, 2002 SimLIGO : A New LIGO Simulation Package 1. e2e : overview 2. SimLIGO 3. software, documentations.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
LIGO-G D Detector Installation and Commissioning Stan Whitcomb NSF Operations Review 26 February 2001 LIGO Hanford Observatory.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
23/7/2003LIGO Document G C1 LIGO S2 Overview Philip Charlton California Institute of Technology On behalf of the LIGO Scientific Collaboration.
LIGO-G Z March 2007, LSC meeting, Osamu Miyakawa 1 Osamu Miyakawa Hiroaki Yamamoto March 21, 2006 LSC meeting Modeling of AdLIGO arm lock acquisition.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
LIGO-G D Commissioning P Fritschel LIGO NSF review, 23 October 2002 M.I.T.
Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer. at the Caltech 40m interferometer. Yoichi Aso*, Rana Adhikari,
Main Interferometer Subsystem
LIGO Commissioning June 10, 2002
Next Generation Low Frequency Control Systems
October 2006, LIGO Hanford Observatory
Aspen January, 2005 Nergis Mavalvala
Fred Raab, LIGO Hanford Observatory November 8, 2005
Status report of Polarization RSE
Installation and Commissioning Status Stan Whitcomb
Commissioning the LIGO detectors
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
Status of the LIGO Detectors
Lock Acquisition Real and Simulated
Advanced LIGO optical configuration investigated in 40meter prototype
LIGO Interferometry CLEO/QELS Joint Symposium on Gravitational Wave Detection, Baltimore, May 24, 2005 Daniel Sigg.
Improving LIGO’s stability and sensitivity: commissioning examples
Advanced Virgo ISC subsystem
Presentation transcript:

LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology

LIGO-G D 2 Promises at Aug 00 LSC meeting  Power recycled Michelson locks Carrier or sideband resonance  Arm cavity locks Feedback to ITM or ETM  …get both locking at same time…  …add second arm cavity…  …full interferometer!

LIGO-G D 3 Livingston overview: what’s new  Installation/alignment of remaining in-vacuum components – Nov  Beam sighted down arm cavities – Jan Within < 3  rad of optic centers  Some realignment of input optics beam required  4 km arm cavity (longest ever!) locked – Feb  Full interferometer locking underway  Learning about differences in seismic environment between both sites  E3: first ‘coincidence’ run – Mar LLO X arm cavity locked for ~ 80% PEM channels acquired at both observatories

LIGO-G D 4 Hanford overview: what’s new  Initial full ifo locking – Oct Intentionally reduced buildup  E2: recombined interferometer – Nov  Full ifo locking with no intentional loss – Jan Carrier power recycling gain: 15 Hour long lock stretches Sensitivity spectra noisy as expected  Noise reduction studies Sensing noise PSL/IO frequency noise Electronics noise (low input power, less filtering)  Olympia earthquake – Feb Damage to magnets on several suspended optics Under repairs

LIGO-G D 5 Interferometer Locking: lock acquisition  Masterminded by Matt Evans (CIT grad student). His reward: PhD thesis Acquisition C code named for him: “Matt’s code”  Basic problem Sensing matrix goes through singularity as both arm cavities start building up power  Solution implemented Judicious use of light power levels to estimate when matrix determinant too small; turn of controller till dofs coast through singularity  LSC digital controls made it possible “Matt’s code” interfaced with “Rolf’s code”  All testing of actual C code was done using E2E model of full ifo Angular fluctuations not included had to rethink use of signals a few times

LIGO-G D 6 Length Sensing Matrix: very near resonance AS_Q: DARM REFL_I: CARM, PRC REFL_Q: MICH PO_I: CARM, PRC PO_Q: MICH Phase modulated light: C and SB Reflection and Pick-off I phase signals both dominated by CARM (~100x), but with different amounts of PRC => Matrix can be inverted! Reflection and Pick-off Q phase signals are clean MICH signals, but ~100x smaller than corresponding I phase signals Phase must be set accurately

LIGO-G D 7 Lock acquisition: the problem  Sensor signals, S, are related to degrees of freedom, D, via the optical gain matrix, Ĝ Ĝ depends on buildup of fields in the ifo, i.e. Ĝ(t) Ĝ must be invertible, i.e. det(Ĝ) = 0  Lock acquisition sequence: states State 2 State 3 State 4 Sideband resonance in arm cavity in State 2/3 kills lock Change in optical gain Matrix for separating CARM, PRC goes through singularity

LIGO-G D 8 Lock Acquisition Program a.k.a. Matt’s code DC and 2f SB Use DC power signals (total power) as well as 2f SB demodulated signals (sideband power) to determine state and optical gain Use measured optical gains in easily locked states (2 and 3) to estimate gain matrix in State 4 Determine occurrence of matrix singularity and turn off control of PRC dof in a carefully tuned window around that zero crossing DC

LIGO-G D 9 Matt’s Code in Action

LIGO-G D 10 Full Interferometer Locking S. Whitcomb

LIGO-G D 11 From “first lock” to stable high buildup lock  Optical lever damping for angular dof on several optics Mitigate 1.06  m light coupling problem  Improved signal-to-noise on critical light power signals (dynamic range)  Wavefront sensor on antisymmetric port  ETM angles differentially  Detour to run recombined configuration First look at ‘differential mode’ E2: >90% duty cycle for lock

LIGO-G D 12 Displacement Sensitivity M. Landry

LIGO-G D 13 What’s next? Near future  LHO 2km Repairs – expect to re-commission in 05/01 Improvements – new 1.06  m insensitive OSEMs  LHO 4km Expect to begin commissioning in 05/01  LLO 4km Characterize environmental noise better Proceed with full interferometer locking Identify in-vacuum problems that must be fixed in next vent Vent coordinated with installation/repair effort at LHO