Management Accounting BA213 Michael Dimond. Michael Dimond School of Business Administration Costing Methods Process Costing Job Costing Activity-based.

Slides:



Advertisements
Similar presentations
CHAPTER 16 Process Costing.
Advertisements

© 2009 Pearson Prentice Hall. All rights reserved. Process Costing.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Process Costing Chapter 17.
Process Costing Chapter 17.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Key T-Account: FIFO Work in Process Inventory, Assembly Beg.
4 - 1 Job Order Costing Chapter Learning Objective 1 Describe the building-block concepts of costing systems.
CHAPTER 4 Job Costing. To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education. All rights reserved. 4-2 Basic.
Process Costing Dr. Baldwin University of Arkansas – Fort Smith Fall 2010.
Product Cost Calculation
Contrôle Interne Avancé-HEC Lausanne-2007/2008 CHAPTER 17 Process Costing.
CHAPTER 4 Job Costing. To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education. All rights reserved. 4-2 Basic.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Order Costing Chapter 4.
CHAPTER 18 Spoilage, Rework, and Scrap To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education. All rights.
CHAPTER 17 Process Costing To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education. All rights reserved.
The Islamic University of Gaza
CHAPTER 4 Job Costing Copyright © 2015 Pearson Education, Inc. All Rights Reserved.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
CHAPTER 17 Process Costing.
CHAPTER 4 Job Costing. Basic Costing Terminology… Several key points from prior chapters:  Cost Objects including responsibility centers, departments,
Chapter 4 Job Order Costing
Process-Costing Systems
Job Costing © 2009 Pearson Prentice Hall. All rights reserved.
4 - 1 Job Order Costing – Chapter 4 Describe the building-block concepts of costing systems. Learning Objective 1.
Principles of Cost Accounting, 16th Edition, Edward J
© 2012 Pearson Prentice Hall. All rights reserved. Process Costing.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Job-Costing and Process-Costing Systems.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 8 Process-Costing Systems.
Process Costing Objectives — Compare job order and process costing — Talk about costs to account for — Understand the concept of equivalent units.
McGraw-Hill/Irwin 4-1 Process Costing and Hybrid Product- Costing Systems 4 Chapter Four.
Management Accounting
Module 6: Process Cost Systems ACG 2071 Created by M. Mari Fall
Process Costing Dr. Hisham Madi. Process Costing  Process-costing systems are used when companies produce a large quantity of identical or very similar.
The Islamic University –Gaza
Prepared by Diane Tanner University of North Florida Chapter 17 1 Process Costing.
Copyright © 2003 Pearson Education Canada Inc. Slide 4-43 Chapter 4 Job Costing.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Process Costing Objectives — Compare job order and process costing — Talk about costs to account for — Understand the concept of equivalent units.
The Islamic University of Gaza
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 18-1 PROCESS COSTING Chapter 18.
Chapter 18 Process Costing
Process Costing Dr. Hisham Madi. Case 3: Process Costing with Some Beginning and Some Ending Work-in-Process Inventory.
Process Costing Lecture 13 1 Readings Chapter 17,Cost Accounting, Managerial Emphasis, 14 th edition by Horengren Chapter 4, Managerial Accounting 12 th.
1-1 CHAPTER 3 Job Costing Dr. Hisham Madi. 1-2 Basic Costing Terminology  Because of the complexity of most manufacturing operations, companies need.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective Distinguish actual costing from normal costing.
Process Cost Accounting General Procedures
3 - 1 Job Order Costing Chapter 4 Job Order Costing.
Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 8 Process-Costing Systems.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Chapter 17.
Prepared by Diane Tanner University of North Florida ACG Process Costing 3-4.
Spoilage, Rework, and Scrap 1. Learning Objective 1 Distinguish among spoilage, rework, and scrap. 2.
Chapter 18 Process Costing. Describe the flow of costs through a process costing system 18-2.
Job costing  Several key points from prior chapters: ◦ Cost Objects – include responsibility centers, departments, customers, products, etc. ◦ Direct.
Chapter 3 Costing Systems: Job Order Costing
Chapter 4 Chapter 3 Job Order Costing Job Order Costing.
Chapter 17 Process Costing.
Process Costing Systems
Job Order and Process Costing
Job-Costing and Process-Costing Systems
Process Costing and Hybrid Product- Costing Systems
CHAPTER 17 Process Costing.
Process Costing CHAPTER 4.
Process Costing Lecture 4. Process Costing Lecture 4.
Chapter 4 Job Costing.
The Islamic University of Gaza
The Islamic University –Gaza
CHAPTER 4 Job Costing © 2009 Pearson Prentice Hall. All rights reserved.
CHAPTER 17 Process Costing.
CHAPTER 17 Process Costing.
CHAPTER 17 Process Costing Spoilage, Rework, and Scrap.
Presentation transcript:

Management Accounting BA213 Michael Dimond

Michael Dimond School of Business Administration Costing Methods Process Costing Job Costing Activity-based Costing (in the text, but not covered in this class)

Michael Dimond School of Business Administration Understanding costs is key to cost management A cost object is anything for which a separate measurement of costs is desired. Examples include a product, a service, a project, a customer, a brand category, an activity, and a department Direct costs of a cost object are related to the particular cost object and can be traced to that cost object in an economically feasible (cost-effective) way. Direct costs are traced to a cost object. Indirect costs of a cost object are related to the particular cost object but cannot be traced to that cost object in an economically feasible (cost-effective) way. Indirect costs are allocated to a cost object. A cost driver is a factor which causes total costs to change in a given period (e.g. sales volume). A change in the cost driver results in a change in the level of total costs. A cost pool is a group of indirect cost items which are separate, but related. A cost allocation base is used to distribute the indirect costs in a cost pool to cost objects.

Michael Dimond School of Business Administration Example of assigning costs to cost object

Michael Dimond School of Business Administration Process Costing Process costing divides the total costs by the total number of units produced. All units (of goods or services) are identical and indistinguishable. This results in an average production cost per unit, which may be classified in as few as two categories: direct materials and conversion costs Process-costing systems separate costs into cost categories according to when costs are introduced into the process. Direct materials are usually added at the beginning of the production process, or at the start of work in a subsequent department down the assembly line. Conversion costs are generally added equally along the production process. Process costing is very high-level and assumes all costs are spread evenly over the production of the identical units. There will be complications when the process creates WIP inventory FIFO and Average cost inventory methods will be treated differently

Michael Dimond School of Business Administration Steps in Process Costing 1.Summarize the flow of physical units of output. 2.Compute output in terms of equivalent units. 3.Summarize total costs to account for. 4.Compute cost per equivalent unit. 5.Assign total costs to units completed and to units in ending work in process.

Michael Dimond School of Business Administration Process Costing Details Assume the company has no beginning WIP inventory

Michael Dimond School of Business Administration Process Costing Details, cont’d

Michael Dimond School of Business Administration Process Costing Details, cont’d

Michael Dimond School of Business Administration Inventory Methods in Process Costing 1.Weighted-average process-costing method calculates the equivalent- unit cost of all the work done to date (regardless of the accounting period in which it was done), assigns this cost to equivalent units completed and transferred out of the process, and to equivalent units in ending work-in-process inventory. 2.FIFO computations assign the cost of the previous accounting period’s equivalent units in beginning work-in-process inventory to the first units completed and transferred out of the process and assign the cost of equivalent units worked on during the current period first to complete beginning inventory, next to start and complete new units, and finally to units in ending work-in-process inventory. 3.Standard-cost procedures attribute costs based on the budgeted standard for the cost item in question. This avoids the intricacies involved in detailed tracking with weighted-average or FIFO methods when there are frequent price variations over time.

Michael Dimond School of Business Administration Job Costing Job costing assigns direct costs to the production of a unique unit of work based on consumption, then allocates the indirect costs using one of two basic approaches: Actual costing: Indirect costs based on the actual indirect-cost rates times the actual activity consumption. Normal Costing: Indirect costs based on the budgeted indirect-cost rates times the actual activity consumption.

Michael Dimond School of Business Administration Steps in Job Costing 1.Identify the job that is the chosen cost object 2.Identify the direct costs of the job 3.Select the cost-allocation bases to use for allocating indirect costs to the job 4.Identify the indirect costs associated with each cost- allocation base 5.Compute the rate per unit of each cost-allocation base used to allocate indirect costs to the job 6.Compute the indirect costs allocated to the job 7.Compute the total cost of the job by adding all direct and indirect costs assigned to the job.

Michael Dimond School of Business Administration Job Costing Details Journal entries are made at each step of the production process. The purpose is to have the accounting system closely reflect the actual state of the business, its inventories, and its production processes. All product costs are accumulated in the work-in-process control account. Direct materials used Direct labor incurred Factory overhead allocated or applied Actual indirect costs (overhead) are accumulated in the manufacturing overhead control account.

Michael Dimond School of Business Administration Job Costing Details, cont’d

Michael Dimond School of Business Administration Job Costing Details, cont’d

Michael Dimond School of Business Administration Job Costing Requires Subsidiary Ledgers Subsidiary ledgers keep track of details of a specific job so management can better control costs