FCC layout: naming, numbering, lengths, preliminary siting Philippe Lebrun, John Osborne & Charlie Cook with input from Brennan Goddard FCC Infrastructure.

Slides:



Advertisements
Similar presentations
A B Q Chord AB is 18. The radius of Circle Q is 15. How far is chord AB from the center of the circle? 9 15 (family!) 12 x.
Advertisements

Common Tangents.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Are you ready for the final quiz? CLICK TO REVIEW MORE CONTINUE TO THE QUIZ This quiz will consist of 10 questions. If you click “continue to the quiz”
ChainTree: A tale of two hierarchies  Transform hierarchy: approximates kinematics of protein backbone at successive resolutions  Bounding volume hierarchy:
Midpoint Formula, & Distance Formula
4-1.  Thinking about angles differently:  Rotating a ray to create an angle  Initial side - where we start  Terminal side - where we stop.
ARCS AND CHORDS. A.105 B.114 C.118 D.124 A.35 B.55 C.66 D.72.
Intersecting & Parallel Lines, Line Segments, and Rays! By: Ms. Castela.
Aim: How can we determine acceleration on a distance-time graph? Do Now: Determine the displacement of the following graph:
Rules Get in groups of 4 Answer each question. If you get the question correct, you get to pick a box. At the end of the period we will open the boxes,
1. What is the value of x? 2. Find the average of 10 and 4.
FCC Infrastructure & Operation studies: progress and outlook Philippe Lebrun, CERN on behalf of the FCC Infrastructure & Operation Working Group FCC Week.
Chapter 11 Review Competition. Question #1 Question #2 Find arc length.
8-8 6 th grade math Similar Figures. Objective To use proportions to solve problems involving similar figures Why? To know how to solve missing sides.
HF2014 Workshop, Beijing, China October 9 th -12 th, 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the.
Objectives: Develop and use formulas for the sums of the measures of interior and exterior angles of polygons Warm-Up: Seven & eleven are both odd numbers.
Preliminary Power Estimates for the FCC-hh FCC Week 2015 Washington, 26 April 2015 Rende Steerenberg, CERN - Geneva2 Rende Steerenberg, Paul Collier,
Chapter 5 Section 5.5 Inequalities in a triangle.
Review of FCC tunnel footprint & implementation Outcome & conclusions Austin Ball, Paul Collier, Massimo Giovannozzi Philippe Lebrun (chair), Lluis Miralles,
Quiz 1.1 – 1.3 Review.
Definitions and Symbols © 2008 Mr. Brewer. A flat surface that never ends.
3-8 Solving Equations and Formulas Objective Students will be able to solve equations for given variables.
Warm Up C. Warm Up C Objectives Use the Distance Formula and the Pythagorean Theorem to find the distance between two points.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Circles…… Area and Circumference The Circumference of a Circle Find the circumference of the following circles. C =  d C = 2  r 8 cm cm 2 C =
7.3B Problem Solving with Similar Figures
Lesson 9.6 Sectors and Segments pp Lesson 9.6 Sectors and Segments pp
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
Sector of a Circle Section  If a circle has a radius of 2 inches, then what is its circumference?  What is the length of the arc 172 o around.
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
Sections Perimeter and Area with Circles.
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
Review of FCC tunnel footprint & implementation Outcome & conclusions Austin Ball, Paul Collier, Massimo Giovannozzi Philippe Lebrun (chair), Lluis Miralles,
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
FCC Underground Infrastructure
Civil Engineering for FCC-eh and LHeC
Civil Engineering update - alignment configuration
Applying the basics of technical drawing
CLIC Civil Engineering Update
Innovative He cycle Francois Millet.
3-5 Slopes of Lines Warm Up Lesson Presentation Lesson Quiz
Standard Form A number expressed in standard form is a number written between 1 and 10 multiplied by 10 to an appropriate power. The use of standard form.
LESSON 10–3 Arcs and Chords.
FCC Civil Engineering update
FCC-ee MDI Civil Engineering update
3-5 Slopes of Lines Warm Up Lesson Presentation Lesson Quiz
Geometry 5-4 Midsegments
Warm Up Find the value of m undefined.
3-5 Slopes of Lines Warm Up Lesson Presentation Lesson Quiz
3-5 Slopes of Lines Warm Up Lesson Presentation Lesson Quiz
CLIC Civil Engineering Update
Polygons whose corresponding angles are congruent and
1-2 Measuring and Constructing Segments Warm Up Lesson Presentation
أياد هاني العلاف قسم البستنة وهندسة الحدائق
8.3 Similar Polygons.
3-5 Slopes of Lines Warm Up Lesson Presentation Lesson Quiz
6-5: Conditions of Special Parallelograms
ISOMETRIC PROJECTION BISECT LINE TO GET RED DOT. Down 80 In 70
3-5 Slopes of Lines Warm Up Lesson Presentation Lesson Quiz
Drill Find x, if the semicircle arc of a circle is 3x + 30 degrees.
Symmetry and Congruence
#17 PA8 Sem2 Practice Exam A #17 PA8 Sem2 Practice Exam B
Determine whether {image} is convergent or divergent.
Objectives Develop and apply the formula for midpoint.
Lines – Gradient – Worksheet B
Presentation transcript:

FCC layout: naming, numbering, lengths, preliminary siting Philippe Lebrun, John Osborne & Charlie Cook with input from Brennan Goddard FCC Infrastructure & Operation Meeting 22 October 2014

Points & Sectors P. Lebrun & J. OsborneFCC I&O meeting Point A Point B Point C Point D Point E Point F Point G Point L Point K Point J Point I Point H Sector AB Sector BC Sector CD Sector DE Sector EF Sector FG Sector GH Sector HI Sector IJ Sector JK Sector KL Sector LA

Points & Sectors Points –Point: a singularity on the perimeter with experimental or technical caverns, access shafts, technical area at ground level –Each point is named by a letter, from A to L clockwise in alphabetical order Sectors –Sector: the length of machine between two Points –Each Sector is named by two letters indicating the Point where it originates and the Point where it terminates, clockwise –Sectors have different lengths (see below) and Functional Sections P. Lebrun & J. OsborneFCC I&O meeting Sector length [km] P = 80.0 kmP = 86.6 kmP = 93.3 kmP = km AB, FG, GH, LA5.4 BC, EF, HI, KL CD, DE, IJ, JK

Functional Sections of FCC-hh P. Lebrun & J. OsborneFCC I&O meeting LSS ESS TSS DS SARC LARC

Functional Sections of FCC-ee P. Lebrun & J. OsborneFCC I&O meeting LSS ESS DS SARC LARC

Functional Sections –Functional Section: part of a sector with a given structure or function –Types of Functional Sections have generic names –A particular Functional Section has a name defined as: - (- ) Examples: LSS-A, ESS-D, DS-AB-1, DS-CD,… –Functions allocated to Functional Sections are given in following P. Lebrun & J. OsborneFCC I&O meeting AbbreviationGeneric nameNumberLength [km] LSSLong straight section61.4 ESSExtended straight section24.2 TSSTechnical straight section4  DSDispersion suppressor160.4 SARCShort arc43.2 LARCLong arc8depends on P

Length & radius of LARC, SARC & DISP P. Lebrun & J. OsborneFCC I&O meeting Perimeter [km] LARC length [km] SARC length [km] L/SARC avg. radius [km] DISP avg. radius [km] Note 1: the cumulated length of TSS is taken as negligible Note 2: the average bending strength of DISP is taken as 0.75 that of SARC/LARC

Allocation of Straight Sections FCC-hh Specific nameAllocation LSS-AExperiment LSS-BInjection LSS-FExperiment LSS-GExperiment LSS-HExperiment LSS-LInjection ESS-DCollimation + Extraction ESS-JCollimation + Extraction TSS-CFeed/Return box TSS-EFeed/Return box TSS-IFeed/Return box TSS-KFeed/Return box P. Lebrun & J. OsborneFCC I&O meeting

Allocation of Straight Sections FCC-hh P. Lebrun & J. OsborneFCC I&O meeting INJ EXP INJ EXP COLL + EXTR FEED/RETURN

Allocation of Straight Sections FCC-ee Specific nameAllocation LSS-AExperiment + RF LSS-BInjection + RF LSS-FExperiment + RF LSS-GExperiment + RF LSS-HExperiment + RF LSS-LInjection + RF ESS-DCollimation + Extraction + RF ESS-JCollimation + Extraction + RF P. Lebrun & J. OsborneFCC I&O meeting

Allocation of Straight Sections FCC-ee P. Lebrun & J. OsborneFCC I&O meeting INJ + RF EXP + RF COLL + EXTR + RF EXP + RF INJ + RF

(1a) 93km “optimised” racetrack PRELIMINARY

(1a) 93km “optimised” racetrack PRELIMINARY

(2a) 93km “optimised” racetrack PRELIMINARY

(2a) 93km “optimised” racetrack PRELIMINARY

(3a) 100km “optimised” racetrack 20,800m PRELIMINARY

(3a) 100km “optimised” racetrack 20,800m PRELIMINARY