24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.

Slides:



Advertisements
Similar presentations
Ways to Improve the Hazard Management Process
Advertisements

G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
Mission Success Starts With Safety GSFC Electrostatic Discharge (ESD) Control Program Are you plugged in? Jeannette Plante, Program Manager, Code 300.
NASA’s Goddard Space Flight Center LRO SRR Project Management.
Define & Compare Flowcharts of Each Method Tom Delong.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
NASA Goddard Space Flight Center Direct Readout Laboratory NPP/JPSS HRD/LRD Status Patrick Coronado NASA Goddard Space Flight Center directreadout.sci.gsfc.nasa.gov/ipopp.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
The Maintenance and Engineering Organization
Level 1 - LRO Requirements ESMD-RLEP-0010
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
Supernova/Acceleration Probe (SNAP) Reliability & System Safety Dick Bolt David Bogart June 28, 2001.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
Responding to Recalls LUHS uses new tool and team to quickly catch recalled medical devices, products and drugs Team Leaders: Jen Carlson, Environmental.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Expendable Launch Vehicle Payload Safety Program Cal Staubus.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
NASA Technical Standards Working Group Presentation to White Sands Test Facility Dr. George Alcorn Goddard Space Flight Center GSFC.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
NASA PREFERRED TECHNICAL STANDARDS PUBLISHED
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Slide 1V&V 10/2002 Software Quality Assurance Dr. Linda H. Rosenberg Assistant Director For Information Sciences Goddard Space Flight Center, NASA
Philip Luers NASA/GSFC Code 561 August 16-17, 2005
Quality Activity Matrix Presented by Sandra Toalston President, SanSeek 1.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
Presented to: Verification and Validation Summit By: James Daum NextGen and Operations Planning Safety Manager AJP-1900 Date: November 05, 2009 Federal.
The Role of NCAS Assessments NASA Supply Chain Conference Goddard Space Flight Center November 14, 2007.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety The NASA Safety.
1 Lunar Reconnaissance Orbiter (LRO) Overview CRaTER PDR 6/27/2005 Craig Tooley.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
Dr. Richard R. Vondrak Director, Robotic Lunar Exploration Program Science Mission Directorate NASA Headquarters September 2004 NASA Robotic Lunar Exploration.
1 Identification of non-applicable chapters and sections using the NASA-STD Annex Table of Contents as they relate to payload systems, instruments,
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
(1) NASA Expendable Launch Vehicle Payload Safety Program Briefing to 30 th SW April 13, 2010 Cal Staubus ELV Payload Safety Manager.
STAR ONE C1 - Insurance Presentation
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
20c - 1 NASA’s Goddard Space Flight Center Propulsion Chuck Zakrwski NASA/GSFC Code 597 August 16-17, 2005.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
ITAR Restricted Data 1THEMIS Mission CDR 6/18/04 System Safety Overview WBS Element Tim Keepers (301)
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
Failure Modes, Effects and Criticality Analysis
Millennium Engineering and Integration Company A NEW DOCUMENTATION PROCESS TO STREAMLINE RANGE SAFETY PROCEDURES 0 O. “Rusty” Powell, Allan Smith, Jeff.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
Camera PDR/CD1 Planning 19 September 2008
ATEC Safety Verification Process
THEMIS Mission Assurance
Peer Review Agenda (Suggested).
BRIAN KLATT MISSION ASSURANCE MANAGER
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Integration and Test Organization Chart
LRO SRR Planned for 8/16-18/2005.
Instrument PDR Summary of Objectives
PSS verification and validation
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005

24b - 2 NASA’s Goddard Space Flight Center LRO System Safety - Requirements LRO Spacecraft PAIP NPD NASA Policy for Safety and Mission Success Level I Level II Level III NPR NASA Safety Manual AFSPCMAN Range Safety User Requirements RLEP Mission Assurance Requirements (MAR) LRO System Safety Program Plan Instruments’ Performance Assurance Implementation Plans (PAIPs) Instruments’ System Safety Program Plans NPD NASA Safety and Health Program NASA-STD ELV Payload Safety Review Process

24b - 3 NASA’s Goddard Space Flight Center LRO Systems Safety - Requirements NASA Safety Policy NPD defines LRO’s safety objectives NASA Safety Manual NPR8715.3, and Range Safety User Requirements Manual AFSCM (Volumes 1, 3 and 6) define process, design, and operational safety requirements Requirements for operations/processing: –At GSFC: GPD , “Goddard Space Flight Center Safety Policy,” and 540-PG , “Mechanical Systems Safety Manual Volume I and II” –At Launch Site: Range Safety User Requirements Manual, AFSCM (Volume 6)

24b - 4 NASA’s Goddard Space Flight Center LRO System Safety - Process Develop LRO System Safety Program Plan (SSPP) and oversee implementation of SSPP Perform Preliminary Hazard Analysis (PHA) that lists hazards, estimated severity and frequency, and potential controls Perform System Hazard Analysis (SHA) to verify system compliance with safety requirements and recommend actions to eliminate or control risks Perform Operations Hazards Analysis (OHA) to demonstrate planned I&T activities meet facility safety requirements Perform Operating and Support Hazard Analysis (OSHA) to evaluate procedurally controlled activities for hazards and controls during prelaunch processing. System Safety Manager is part of the LRO Systems Engineering team and participates in risk assessment.

24b - 5 NASA’s Goddard Space Flight Center LRO System Safety - Deliverables LRO System Safety Program Plan (SSPP) Hazard Analyses (PHA, SHA, OHA, O&SHA) Safety Compliance Checklist Missile System Prelaunch Safety Package (MSPSP) Hazard Control Verification and Tracking Ground Operations Procedures Safety Noncompliance Requests System safety deliverables from the Instruments will be used as inputs to the LRO level safety documents

24b - 6 NASA’s Goddard Space Flight Center LRO System Safety - Hazards Pressure Systems (Propulsion) Fuel (oxidizer) Ordnance (Pyrovalves)/ Pyro release Mechanisms Batteries Ionizing Radiation (LEND, CRaTER for calibration) Non-Ionizing Radiation –Laser –RF Structure and Mechanism Deployables (Solar Arrays, HGA) GSE –Electrical –Pressure Material Handling Equipment

24b - 7 NASA’s Goddard Space Flight Center Safety Conclusion The LRO safety requirements are well understood. Preliminary hazards have been identified and plans are in place. Mitigation activity planned is feasible. LRO safety is ready to proceed to PDR

24b - 8 NASA’s Goddard Space Flight Center Back up charts Reliability Code 302 Reliability engineers coordinate the reliability program. Reliability analyses are conducted (FMEAs, FTAs, Parts Stress Analysis, and Worst Case Analysis) Comparative numerical reliability assessments and reliability predictions are performed. Trend data will be collected and monitored. Limited life items are identified with the LRO Materials Engineer and tracked as needed (operating times, cycles, etc.) Active Risk Management (ARM) tool used across project to manage risk Formal Risk Management Board established, meetings held monthly