Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.

Slides:



Advertisements
Similar presentations
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Advertisements

ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
HCAL with Resistive Plate Chambers José Repond Argonne National Laboratory Presented at the Chicago Linear Collider Workshop January 7-9, 2002.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 24 November 2003 What’s new since September…
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
1 News and preparation of the Semi-Digital Hadronic CALorimeter prototype Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
C. Combaret TILC april m2 GRPC Acquisition System C. Combaret, IPN Lyon For the EU DHCAL collaboration
1 Status of GEM DHCAL Andy White For GEM-TGEM/DHCAL Group March 21, 2011 ALCPG11 Workshop Univ. of Oregon Introduction 30cmx30cm 2D readout with KPiX chip.
Towards an RPC-based HCAL Design Stephen R. Magill Argonne National Laboratory Digital HCAL for an E-Flow Calorimeter Use of RPCs for DHCAL RPC Design.
Development of a DHCAL with Resistive Plate Chambers ECFA/DESY Workshop at NIKHEF, Amsterdam, Netherlands April 1 - 4, 2003 José Repond Argonne National.
Andy White University of Texas at Arlington For GEM DHCAL Group ESTB Workshop SLAC 2012 Introduction KPiX Readout FTBF Beam Test Setup Beam Test Analysis.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb Paris, 8 October 2010.
Recent DHCAL Developments José Repond and Lei Xia Argonne National Laboratory Linear Collider Workshop 2013 University of Tokyo November 11 – 15, 2013.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb International Linear Collider Workshop Beijing,
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
An update on Power Pulsing with SDHCAL Kieffer Robert IPN Lyon « CALICE collaboration meeting » May 2011, CERN
Resistive ….. I.Laktineh IPN-Lyon. Motivation Calorimeters are expected to play an important role in future experiments (ILC, CLIC…) based on PFA concepts.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
Status summary of RPC R&D for INO ICAL detector B.Satyanarayana, TIFR, Mumbai Satyajit Jena, IIT Bombay, Powai For INO Collaboration.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
Calibration of a Digital Hadron Calorimeter with Muons Burak Bilki d, John Butler b, Tim Cundiff a, Gary Drake a, William Haberichter a, Eric Hazen b,
Construction and Operation of DHCAL Fermilab Test Beam Facility Lei Xia ANL_HEP.
Update on DHCAL and RPC progress Lei Xia ANL - HEP.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
Semi Digital HCAL Data analysis results Robert Kieffer Institut de Physique Nucléaire de Lyon 10/02/
A Hadron Calorimeter with Resistive Plate Chambers José Repond Argonne National Laboratory CALOR 2006, Chicago, June 5 – 9, 2006.
MicroMegas for DHCAL Status and activities at LAPP Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise.
Marcello Abbrescia Muon general meeting, Mon 29-Apr p. 1 R&D on improved RPCs for phase 2 upgrade M. Abbrescia on behalf of the RPC upgrade group.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
CALICE calorimeters Power Issues Kieffer Robert IPN Lyon « Linear Collider Power Distribution and Pulsing workshop » May 2011, LAL
1 Short Status of TB Analyses in SDHCAL Imad Laktineh.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
An update on Power Pulsing with SDHCAL Kieffer Robert IPN Lyon « CALICE collaboration meeting » May 2011, CERN
Future DHCAL Activities José Repond Argonne National Laboratory CALICE Meeting, CERN, May 19 – 21, 2011.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
1 Micromegas for sampling calorimetry Chronology & people  Initiated by LAPP LC-group in 2006 (C. Adloff, M. Chefdeville, Y. Karyotakis, I. Koletsou)
Monitoring of cell to cell inhomogeneity and transfer into simulation M. Vander Donckt.
1 Construction of technological semi-digital hadronic calorimeter using GRPC Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Vincent Boudry LLR, École polytechnique (on behalf of the CALICE collaboration) Calor 2010 IHEP, Beijing May 14 th, 2010 Test beam studies for a Highly.
Manqi Ruan Status & plans for gaseous semi-digital HCAL in European.
GRPC development in Lyon
Monitoring of cell to cell inhomogeneity and transfer into simulation
European DHCAL Meeting 13/06/08
Test Beam Request for the Semi-Digital Hadronic Calorimeter
The European DHCAL status
A proposal to equip the high eta muon stations with High Rate GRPC
DHCAL TECH PROTO READOUT PROPOSAL
A Digital Hadron Calorimeter Resistive Plate Chambers
Construction and Testing of a Digital Hadron Calorimeter Prototype
GRPC activity for EuDHCAL in IHEP-Protvino
(My personal) CALICE Report
Semi-Digital Hadronic CALorimeter
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
José Repond Argonne National Laboratory
GEM-based Digital Hadron Calorimetry for SiD
GEM-based Digital Hadron Calorimetry for SiD
Summer 09 Testbeams SDHCAL prototypes
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
Development of Resistive Plate Chamber for charge particle detection
Presentation transcript:

Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group

The Glass RPC SDHCAL prototype 40 1m 2 layers of – steel absorber (1,5cm) – 6mm thick glass RPCs in 5mm thick steel cassettes Total of 5 λ I Avalanche mode TFE (94.5% Isobutane (5%), SF6 (0.5%) Multiple thresholds to allow for the recognition of the dense shower center. 1 cm 2 charge collectors with 3 thresholds Power-pulsed electronics Requires no cooling ! 221/10/10IWLC 2010

3 Cross-section of GRPCs PCB support (FR4 or polycarbonate) PCB (1.2mm) Mylar layer (50μ) Readout ASIC (Hardroc2, 1.4mm) PCB interconnect Readout pads (1cm x 1cm) Mylar (175μ) Glass fiber frame (1.2mm) Cathode glass (1.1mm) + resistive coating Anode glass (0.7mm) + resistive coating Ceramic ball spacer (1.2mm) Total thickness including embedded electronics: 5.825mm Gas gap 21/10/10IWLC 2010

Resistive coating 4 CoatingResistivityMultiplicityHV ConnectionApplication Graphite 400 kΩ/ □ 7.4 kV ✓ Licron >20 MΩ/ □ ✓ ✗ LostSpray Statguardfew M Ω/ □ ✓✓ Roll (liquid paint) Colloidal graphite few M Ω/ □ ✓✓ Silk screen printing 21/10/10IWLC 2010

GRPC read-out 3 DIFs (Detector InterFace boards) 144 ASICs (HARDROC2 chips) reading 64 1cm 2 PADs each 21/10/105IWLC 2010

Cosmic test bench 6 Up to five 8x32 cm Chambers for tracking Trigger scintillator 21/10/10IWLC 2010

Efficiency homgeneity vs HV scan 3 different areas HV scan on 3 different areas. Statguard coated chamber. 7 Top-Right Top-Center Down-Left Results obtained using tracking DIF6 DIF9 DIF10 21/10/10IWLC 2010

Beam tests 1 m 2 Statguard chamber CERN-PS in May 2010 – 10 GeV  2 1m 2 colloidal graphite chambers H4 (150 GeV  ) in September 2010 Beam 21/10/108IWLC 2010

 HV: 7.5 kV  Position scan area  Homogeneous  >95% 1m 2 GRPC map Efficiency homogeneity studies 9 Results obtained using time selection only 21/10/10IWLC 2010

Multiplicity homogeneity studies 21/10/1010  HV: 7.5 kV  Multiplicity highly depends on threshold level  Homogeneous  <1.3 for threshold ~0.25 MIP Results obtained using time selection only 1m 2 GRPC map IWLC 2010

Principle of power pulsing Power On Period: 10ms (100 Hz) DutyCycle: 2/10 2 ms Enable Acquisition Trigger for chip readout Injecting on falling edge through a 2pC build in capacitor Scintillator Coincidence « In Spill » Signal & Veto From Acquisition DIF Trigger Power On 24 Hardroc2 Busy Trigger Enabling Power Pulsing: consumption goes from 2A to 0.7A 21/10/1011IWLC 2010

Beam conditions: High Rate Aim: PowerPulsing tests using B field. Beam Beam 32x48 cm 2 GRPC field B field 3T Magnet Power Pulsing Test Beam 21/10/1012 IWLC 2010

Power Pulsing 1ms after power-ON : no efficiency loss 1ms after power-ON : no efficiency loss. Studies are still ongoing to reduce waiting time to 0.1 ms 3T B field 21/10/1013IWLC 2010

Analysis Summary Efficiency more than 95%. Multiplicity < 1.3 Pad/MIP (must be re-defined using the 3 thresholds) Detection rate: Steady up to 100 Hz/PAD Noise rate: ~0.1 Hz/cm² Detector working in a 3 Telsa field Good efficiency/multiplicity homogeneity on large chamber Validity of power pulsing concept proven. 21/10/1014IWLC 2010

15 The ASICs are ready for the 40 layers. Currently under test, using a robot. Max test time : 10 minutes/ASIC using Labview-based application Electronics: ASICs test facility 21/10/10IWLC 2010

Towards 1m 3

17 Final total thickness 11 mm aperture 12.5 mmSuccessful insertion from above Chamber assembly going on 21/10/10IWLC 2010

Test bench for production 1821/10/10IWLC x2 X-Y scintillator planes Cosmic rate 200Hz Gas+HV/LV supplies for up to 7 gRPCs that can be tested in few hours Gas mixer

Mechanics Self supporting structure Spaced using bolted spacers ANSYS simulation of stress and deformation : <150µm 21/10/1019IWLC 2010 Plate assembly under test

Summary 1 m 2 glass RPCs have good efficiency, multiplicity, power pulsing works. – Not detailed but under control: ageing, gas flow, HV & gas services 1 m 3 construction ongoing to be finished first term 2011 Ongoing; – threshold calibration using charge injection – Latest Colloidal graphite testbeam result analysis 21/10/10IWLC