Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.

Slides:



Advertisements
Similar presentations
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Advertisements

Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
 Safety  Schedule: Past, Present and Future  RHIC and Experiment Reports  Machine and System Reports  AOB.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Experimental background at the presence of pressure rise in RHIC Angelika Drees, Ubaldo Iriso-Ariz RHIC How to measure collision rates Vacuum and collision.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
October 14, 2004 Single Spin Asymmetries 1 Single Spin Asymmetries for charged pions. Overview  One physics slide  What is measured, kinematic variables.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
4K Wave Cold in both rings PS gave us e-lens PS work during Day PP12 lattice test evening First Collisions Overnight Stores 109x109 Start Physics The Story.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run16 Y. Akiba.
Run-5 Cu-Cu Integrated Luminosity
Presentation transcript:

Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again

Run 13 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2013 – FY 2017), 27 Sep Feb, Begin cool-down to 4.5K 15 Feb, Cool-down to 4.5K in Blue and Yellow Ring complete, begin magnet setup 26 Feb, first collisions 15 Feb -1 Mar, RHIC √s = 510 GeV pp machine setup 1-8 Mar, machine ramp-up with 8 hr/night for experiment setup 9 Mar (store 17201), begin √s = 510 GeV pp physics run today, 9 Apr… 27 May, end 15 cryo weeks 6 Jun, switch to √s = 15 GeV/n AuAu if pp goals are met and end 12.7 week √s = 510 GeV pp physics run 27 Jun, end ~2.5 week √s = 15 GeV/n AuAu physics run or 15.9 week √s = 510 GeV pp physics run, begin cryo warm-up 30 June, cryo warm-up ~complete (19.9 cryo-weeks) See for the Run Coordinator’s detailed planhttp://

Ions (maximum) Past 2 Weeks Physics stores L peak (maximum=2.7E32) Using Run 13 cross sections with log based singles correction L average (maximum) Run 12 lattice 17340

Run 12 lattice

Preliminary, with Run 13 cross sections, PHENIX and STAR standard singles correction SUPERCEDED

Preliminary, with Run 13 cross sections, PHENIX and STAR log based singles correction LATEST

Preliminary, with Run 13 cross sections, singles corrected PHENIX Goal, 250 pb -1 recorded, 750 pb -1 delivered, ≥ 55% polarization STAR Goal, 165 pb -1 recorded, 275 pb -1 delivered, ≥ 55% polarization PHENIX GOAL STAR GOAL Decision time for low energy AuAu 15 cryo weeks Preliminary, with Run 13 cross sections, PHENIX and STAR log based singles correction

Example Store for STAR (17340) with “physics” time cuts Log based singles correction  8.48E8/2.8mb = 3.03 pb-1 Standard singles correction  6.371E8/2.5mb = 2.55 pb-1 Integrated lumi Log/Standard = 1.19 ZDC Standard singles corr. ZDC Log singles corr. Raw ZDC coinc integrals } ~x1.2 (1.1 lumi) ~x1.5 (1.3 lumi)

Yellow average = 44.3 ± 0.8% Blue average = 47.7 ± 0.7% stores (eLens lattice) Yellow average = 47.2 ± 1.4% Blue average = 40.7± 1.2% stores – (Run 12 lattice)

Yellow average = 48.2± 0.4% Blue average = 53.1 ± 0.5% Average = 50.7% stores (eLens lattice) Yellow average = 49.3± 1.1% Blue average = 46.8 ± 1.2% Average = 48.1% stores (Run 12 lattice)

Preliminary, with Run 13 cross sections, PHENIX and STAR log based singles correction Using average polarizations from CNI polarization from

Preliminary, with Run 13 cross sections, PHENIX and STAR log based singles correction Using average polarizations from CNI polarization from

Additional Information

Yellow average = 48.12± 0.4% Blue average = 53.1 ± 0.5%

Yellow average = 57.7± 0.4% Blue average = 55.9 ± 0.4% Average = 56.8%

Blue jet target weighted average = 50.3% ± 0.5% Yellow jet target weighted average = 53.4% ± 0.5% And Yellow beam at injection jet target Run 12 result = 63.0 ± 4.4%

Yellow average = 53.4 ± 0.5% Blue average = 50.3 ± 0.5%

+$1,132K in BNL bank through Feb 2013 Feb 2013 bill $28.89 actual billed at $53/Mwhr Dec-Jan-Feb

For Run 13 the PAC recommends the following (in order of priority): 1.Running with polarized proton collisions at 500 GeV to provide an integrated luminosity of 750 pb -1 at an average polarization of 55%. 2. Depending on the amount of running time remaining after priority #1 a. If less than 3 weeks remain, a week of 200 GeV Au+Au collisions. b. If at least 3 weeks of running time remain, 3 weeks of 15 GeV Au+Au collisions days of 62 GeV p+p collisions. 4. At the discretion of the ALD, 4 days of low-luminosity running to accomplish the pp2pp goals.