Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 1 Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics.

Slides:



Advertisements
Similar presentations
Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.
Advertisements

CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group 10th ICATPP Conference on Astroparticle,
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology On behalf othe CMS ECAL Collaboration High-resolution, high-granularity.
CMS ECAL Prompt Feedback Group Toyoko J. Orimoto, California Institute of Technology A Brief History: From GRUMM to First BeamThe Future of the ECAL PFG.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
ECAL TIMING. 20/04/092 Ratios’ Method Basics Position of pulse maximum parameterized using the ratio of two consecutive samples, i.e., R = A(t)/A(t+1)
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
Approved Plots from CMS First Beam Runs 2-October-2008.
The ATLAS Pixel Detector - Running Experience – Markus Keil – University of Geneva on behalf of the ATLAS Collaboration Vertex 2009 Putten, Netherlands,
June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
The CMS Electromagnetic Calorimeter Roger Rusack The University of Minnesota On behalf of the CMS ECAL collaboration.
CMS ECAL Elba May 2006 R M Brown - RAL 1 The Status of the CMS Electromagnetic Calorimeter R M Brown On behalf of the CMS ECAL Group.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
CMS ECAL Laser Monitoring System Christopher S. Rogan, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
Toyoko Orimoto, Caltech 1 CMS Electromagnetic Calorimeter US CMS JTERM III 12 January 2009 Toyoko Orimoto California Institute of Technology.
The CMS Electromagnetic Calorimeter at the LHC
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
DOE Review Adi Bornheim California Institute of Technology July 25, 2007 CMS ECAL Status, Test Beams, Monitoring and Integration.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
1 Triggering on Diffraction with the CMS Level-1 Trigger Monika Grothe, U Wisconsin HERA-LHC workshop March 2004 Need highest achievable LHC Lumi, L LHC.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
T. Orimoto, ECAL in CRUZET 1 ECAL in CRUZET CRUZET Data Analysis Jamboree 30 May 2008 Toyoko Orimoto California Institute of Technology On behalf of the.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
SiPM Readback Noise Tagging & HCAL Calibration Dayton Thorpe July 8, 2010.
First CMS Results with LHC Beam
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Paolo Rumerio, CERN On behalf of the CMS Electromagnetic Calorimeter Group CALOR 2006 Chicago, June 5 th – 9 th, 2006 Commissioning of the CMS Electromagnetic.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Resolution Studies of the CMS ECAL in the 2003 Test Beam
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
CMS ECAL Calibration and Test Beam Results
Pierluigi Paolucci - I.N.F.N. Naples
The IFR Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Commissioning of the ALICE-PHOS trigger
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Installation, Commissioning and Startup of ATLAS & CMS Experiments
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Overview of the new CMS ECAL electronics
Presentation transcript:

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 1 Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics How to compose a very very large jigsaw-puzzle ECAL CMS

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 2 The CMS electromagnetic calorimeter In total, more than 75,000 channels 36 Supermodules, 1700 Crystal each 4 Endcap Dees, 3662 Crystals each 8 meters long 90 Tons of Crystal

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 3 Construction Before being sent to the CMS cavern, ECAL HW has been assembled and tested in many laboratories with final construction in several CERN sites. CERN integration center: 4 SMs in preparation Modules are produced in Rome and CERN SM are assembled at CERN On-detector electronics is installed and tested at CERN Prevessin.

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 4 Detector Installation After many years of work ECAL is inside CMS April 2007: first SM July 2007: Barrel Done July 2008: Endcap Done

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 5 Ancillary Systems The very first step is the final commissioning of the ancillary sub-systems (which happened concurrently with the installation): CMS & ECAL Safety System (poster pres.) Cooling Nitrogen flow Detector Control System (poster pres.) These sub-systems have been running now for ~ year and they are very reliable. We are still suffering occasionally from ‘infrastructure’ problems such as the lack of cold water, power cuts, evacuation alarms which provide us with a few hours of rest….

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 6 Commissioning The commissioning of the electronics has two main aspects Hardware: On- & off-detector electronics High and Low voltage system Laser monitoring system Fiber optic links DAQ: Necessary software to run the system

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 7 On-Detector Electronics Signal from the photodetector MGPA: Multi-Gain- Pre-Amplifier with 3 gains (1, 6 and 12) ADC: 4 40-MHz 12 bit digitize the 3 outputs The highest, non-saturated gain is selected and kept in memory waiting for a L1-trigger signal (3.6  s latency) Sent off detector via laser fibers Overall the on-detector electronics is made by ~ 21,000 custom made boards, 2.3 W/ch => 180kW total Trigger information sent every bunch crossing Data information sent every L1

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 8 Off-Detector Electronics CCS: reception/distribution of LHC clock and control signals + front-end initialization TCC: encoding of trigger primitives and transmission to Regional Calorimeter Trigger at 40 MHz + classification of trigger tower importance and transmission to SRP at Level 1 rate DCC: integrity check + data reduction + transmission to central DAQ at Level 1 rate Overall the off-detector electronics is made by 18 VME-9U and 1 VME-6U crates controlled by 28 crate mounted PCs SRP: send to the DCC the list of trigger towers to be read out

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 9 High and Low Voltage systems The HV system provides the necessary voltages to the photo-detectors (APD in the barrel and VPT in the Endcap) Barrel: 18 CAEN crates, each equipped with 4 HV modules. A total of 1224 independent channels providing Volt to groups of 50 crystals are installed EndCap: 2 CAEN crates provide 8 independent channels supplying V for the anodes, and V for the dynodes to groups of ~1800 photodetectors. All VPTs in a quadrant have the same bias voltages. The LV system supplies the voltages to the front-end. The system is produced by Wiener and it comprised a total of ~ 680 LV channels in the Barrel and ~ 150 for the Endcaps

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 10 Laser monitoring system A laser system is used to check transparency changes in crystals: Changes is dose-rate dependent, 1 or 2 per cent at low luminosity Oscillation due to LHC cycle O(10%) at eta=2.5, nominal luminosity Two wavelengths: λ=440 nm, to follow the changes in transparency due to radiation λ=796 nm to verify the stability of other elements in the system.

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 11 Fiber optic links Data transmission between the on- and off- detector electronics uses optical fibers: Data: 1 link / trigger tower Trigger: barrel:1 link / trigger tower; endcap: 5 links / trigger tower Total capacity ~640Mb/s Total data + trigger: ~9000 links

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 12 DAQ commissioning DAQ commissioning deals with all necessary aspects to run the whole ECAL system: Trigger Selective readout Protocol Laser Detector Control Units Condition and Configuration Databases Non-event monitoring Run Control DQM

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 13 Trigger Comparison of trigger decision with off-line emulator Study of trigger rate as a function of threshold SMs with problems (for that run): trigger rate independent of threshold Good SMs: very quite above 1.75 GeV

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 14 Selective Readout Protocol (SRP) The SRP receives from the TCC the list of ‘interesting towers’ and builds around each of them a 3x3 TT matrix which is read-out in full (each TT = 25 crystals) This is the map of the TTs read out in a single event: most of them have only one crystal while the 3x3 groups have all 25 crystals 25 x 9 TT = 225 Crystals Unrolled Barrel view Increasing rapidity  Phi angle

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 15 Laser commissioning During each LHC orbit (96  s) there is a short period (~1 %) with no bunches (abort gap). ECAL uses this gap to fire the laser and take calibration events while running The laser calibration works routinely in local runs while in global runs we still have to finalize the sequence Laser data in global runs laser 600 laser shots for one transparency measurement whole ECAL in ~ 1/2 hour 40 Gb of laser data a day Testbeam data Uncorrected Corrected

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 16 ECAL status ECAL runs routinely with CMS and almost all ECAL sub-systems are operational: Noise level and performance as expected Number of masked (i.e. not used ) channels ~ few per mille.  Of those, a small fraction has been declared dead (link/clock no working)  The remaining masked channels have a variety of problems. We hope to recover a large part of them (it will requite time)

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 17 Local and global runs Local Runs : Use to debug the system, test configuration ECAL only + additional Trigger chain Readout can be local (VME with low rate) or global Beam Run : Since September 10 th LHC has beam! The run structure has deeply changed with a lot of attention given to beam related problems Sub-system time for development restricted Global Run : Coherent exercise of CMS data taking in preparation for collisions 1 week of intense activity 6 GR in 2007, 8 in 2008 Involves more and more subsystems ~ 100 ml cosmic triggers acquired

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 18 Global Cosmic runs During global cosmic runs a very large number of cosmic ray signals have been acquired ECAL is able to: Clearly see the signal deposited by a mip, 250 MeV (with photodector gain raised from 50  200) Trigger on mip signal both using single tower or coincidence Note: we are using ECAL to measure very low energy deposition, far from its optimization => this was very useful Measuring signal so small made us understand ECAL very well

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 19 Cosmic runs - Signal The signal in cosmic ray runs varies a lot since they come with every angle. There is also a high energy component due to muon bremsstrahlung

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 20 Cosmic runs - Timing Using cosmic signals we had timed-in all ECAL-barrel crystals Top earlier Bottom later

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 21 Cosmic runs – Event Display CMS is now working as a single detector, with correlation between sub-detector. In this picture: DT,Muon Drift Tube RPC, Muon ECAL Barrel ECAL Endcaps HCAL, Hadronic Calo. ECAL DT RPC HCAL

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 22 Global runs – Event Display Calorimeter tracking….. ECAL RPC HCAL

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 23 Beam runs ! Starting September 10 th LHC has beam! LHC dumped single shot beam (~ 10 9 proton) on the collimators 150 m away from CMS: Incredible opportunity to time-in the whole ECAL with just few events Total energy in excess of ~ 100 TeV 98% of crystals hit ~ 1-300,000 muons in one hit

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 24 Conclusion and outlook b.c. b.c. = before collisions A very personal ECAL timeline: Commissioning ConceptConstruction You are here Every time we go from b.c.  a.c. there is a dramatic change: I think we are ready a.c. a.c. = after collision

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 25 EXTRA

Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin, Italy 26 CMS rapidity coverage