Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
PRR 692 APPEAL PRESENTED BY: Constellation NewEnergy DATE: November 2, 2006.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
ERCOT PMO Update Robert Connell Director Program Management Fourth Quarter Results (Through 12/31/04) January 11, 2005.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Demand Integration Update to DSWG ERCOT Emergency Responsive Service (ERS) Report to the Public Utility Commission of Texas for the 2013 ERS Program Year.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 ERCOT Wholesale Settlement Module 3. 2 BENA iq = -1 * (Σ (RI iz + LI iz + URC iz + MISD iz + MISR iz ) z + TCRPAY Bei + Σ CSC Bei ) * LRS iq Can you.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher February 22, 2005.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.
1 RPRS Market the issue of capacity inadequacy solved by the Local Congestion procurements ERCOT Feb 19, 2004.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Ancillary Services Replacement Presenter: Ino González Wholesale Market Subcommittee July 8, 2015 ERCOT Public.
DSWG Update to WMS 12/2/2015. NPRR738 ERS Performance Calculations During TDSP Outages A utility outage can prevent ERS Generators from exporting to the.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
2014 & 2015 Unannounced Unit Testing Summary ERCOT ROS February 4 th, 2016.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
ERCOT Wholesale Market Basics Module 3 Settlement.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher October 20, 2004.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
EILS Discussion February WMS. Charge to WMS from PRS The benefit. The cost based on the EILS PRRs. Changes in Market since April 17, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
QSE Managers Working Group Report to WMS September 19, 2007.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
Mass / g Time / min
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Verifiable Cost Escalation Cost Factors ERCOT WMS 11/13/2013.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Voltage Support Settlements Business Requirements.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Load Resource Participation in EILS EILS Subgroup October 27, 2011.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Ancillary Services Replacement
RPRS March 23, 2006 Presented by ERCOT Art Deller Bill Kettlewell
Ancillary Service Trades and Ancillary Service Settlement
Market Notice Regarding Off-line Units
Presentation transcript:

Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements

Under Scheduled Capacity Charge USRP = Min{2 * USQRP * (PCOOMRP + LPCRP + PCRP)/ CapOOMRP, [(PCOOMRP + LPCRP + PCRP) * USQRP] / [Σ(USQRP)]} Where: USRP( $ ) Under Scheduled Charge by hour for the QSE. USQRP( MW ) Under Scheduled Quantity per QSE per hour PCOOMRP( $/hr ) Sum of all OOMC payments across ERCOT LPCRP( $/hr ) Sum of all Local RPRS payments across ERCOT PCRP( $/hr ) Sum of all Zonal/Capacity Insufficiency RPRS payments across ERCOT CapOOMRP( MW ) Sum of all Capacity (HSL) procured for OOMC or RPRS for the hourly interval

The CAP OOMRPi is defined as: “Sum of all Capacity (HSL) (MW) procured for OOMC or RPRS for the hourly interval” HSL is a 96 interval data cut but its values represent hourly MW quantities (EMMS R4). This allows the QSE representing the resource to update the HSL every 15 minutes. For the calculation of USRP, ERCOT will use an average HSL for the hourly interval value. Let’s look at an example =  Calculation of CapOOMRP

Sample Calculation of CapOOMRP Int8Int9Int10Int11Int Hour 3 Hour Three HSL: = divided by 4 = Quantity for CapOOMRP = 128.5

Utilizing Average HSL is consistent with: 1. OOMC Capacity Values Determination 2. Calculation of OOMC and Local RPRS Payments at the Load Sustainable Limit (LSL) Summary:

Questions?