EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December 2011 1 | Energy Networks Association - DCMF.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

Update on IDNO/DNO working group DCMF 12 November 2009.
DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 05 April | Energy Networks Association - DCMF.
3 June 2010 energynetworks.org 1 SPEN Pre 2005 DG Draft Modification Report currently with Ofgem Proposed methodology for charging pre April 2010 EHV generators.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 3 December | Energy Networks.
EDCM update Mo Sukumaran (on behalf of CMG)
Review of industry code governance 26 March 2010.
Update from DCUSA DCUSA Secretariat 16 August | Energy Networks Association - DCMF.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
EDCM submission workshop Andrew Neves CMG Chair 12 May | Energy Networks Association - CMG.
Update from DCUSA Elizabeth Lawlor DCUSA Secretariat 01 December | Energy Networks Association - DCMF.
7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.
Distribution Charging Methodologies Forum (DCMF) 27 th DCMF Institute of Physics London 01 December | Energy Networks Association.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 14 June | Energy Networks.
Considerations for EHV charges for April 2010 María Isabel Liendo SP Energy Networks DCMF, 04 June 2009.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF CMG Amending the DCMF Terms of Reference Distribution Charging Methodology.
03 April 2009 energynetworks.org 1 Common Methodology Group Work Presentation from Workstream 4 Review of the Connection Charging Boundary in the CDCM.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
ElectraLink Update on DCUSA Activities. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation10 (DCP 133, 159, 160, 161, 165,
Update from DCMF MIG Simon Yeo Chair – DCMF MIG 01 December | Energy Networks Association - DCMF.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF WSA Presentation from Workstream A looking at the Network Modelling aspects.
Update from DCUSA Michael Walls DCUSA Secretariat 04 August | Energy Networks Association - DCMF.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
Update from DCUSA Michael Walls DCUSA Secretariat 02 February | Energy Networks Association - DCMF.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
DCUSA Update ElectraLink. The following Change Report are due to be presented to the DCUSA Panel at its meeting on Wednesday 16 January 2013: DCP 143.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
Structure of Charges Year-end review for DCMF 22 November 2007.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
Customer Charge On behalf of all DNs 25 October 2010.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
DCUSA Change Proposals Elizabeth Lawlor DCUSA Panel Secretary 15 February | Energy Networks Association - DCMF.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
January 24, 2016 energynetworks.org 1 The SoC Project A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORKS ASSOCIATION PRESENTED BY ANDREW NEVES.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
DCMF Distribution Charging Methodologies Forum Institute of Physics Thursday 4 April 2013 Distribution Charging Methodologies Forum Institute of Physics.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
DCMF SIG terms of reference Harvey Jones Elizabeth Lawlor 2 December | Energy Networks Association - DCMF.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 02 February | Energy Networks Association - DCMF.
Structure of Charges: Update and next steps DCMF 10 September 2008.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
LC14 Statement Oliver Day UKPN (on behalf of DNOs) 1 | Energy Networks Association 1 December 2011.
Customer Charge On behalf of all DNs 19 November 2010.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
CMG and Workstream Update
Code Governance Review UNC Modification Proposals
Holistic view of Charging Modifications – In flight 11th June 2018
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Exit Capacity Substitution and Revision
Draft Capacity & Connection Plan
Generation Dominated Areas(GDA)
DNPC07 Proposal DNPC07 proposed that Capacity/Commodity split of the LDZ System Charges should be changed to 100/0 The percentage of the Firm Capacity.
Capacity Market Code Modifications
IECR Incremental Step Size
Incremental Entry Capacity Release Methodology Statement
DCUSA PARTY PANEL SECRETARIAT OFGEM CHANGE PROPOSAL SUBMITTED
DCMF STANDING ISSUES GROUP
Presentation transcript:

EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF

Current position 1 December | Energy Networks Association – DCMF Ofgem has decided to approve the EDCM for demand charges only, subject to conditions. See: ks/ElecDist/Policy/DistChrgs DNOs have since submitted revised proposals for demand only Ofgem decided to delay the implementation of the EDCM for generation charges to April 2013, at the earliest Ofgem is consulting on the way forward on generation charges, see: ks/ElecDist/Policy/DistChrgs

Ofgem decision on EDCM demand 1 December | Energy Networks Association – DCMF Ofgem has decided to approve the EDCM for import (demand) charges only. –Approval subject to three conditions –Condition 1 relates to LDNO discount categories (by 30 November 2011) –Condition 2 relates to the sense-checking of LRIC branch charges (by 30 November 2011) –Condition 3 relates to the treatment of spare capacity in calculating network use factors (by 1 June 2012)

Work on conditions 1 and 2 1 December | Energy Networks Association – DCMF WSB has developed proposals to meet condition 1 –LDNO representatives participated in, and provided feedback through, WSB meetings –There are now 5 boundary categories for LDNO discounts WSA has developed proposals to meet condition 2 –The method for sense-checking LRIC charges has been amended as required by Ofgem –Analysis of the impact of these changes sent to Ofgem by DNOs DNOs believe that these conditions have been met, and therefore should be approved by Ofgem

Other changes to the EDCM 1 December | Energy Networks Association – DCMF We have amended the methodology statements and Excel models to reflect Ofgem’s decision postpone the implementation of the EDCM for generation (export) charges Since April 2011, we have carried out extensive tests on the EDCM. Consequently, we have made improvements to the Excel model and methodology statement –To remove identified inconsistencies –To remove ambiguities and add clarity On 30 November DNOs submitted a report, an updated and revised version of the models and methodology statements to Ofgem for approval

Current status on EDCM generation 1 December | Energy Networks Association – DCMF Ofgem is currently consulting on two sets of proposals on generation charges –The first proposal is for a time-limited exemption for pre-2005 connected DG (20 years) –The second proposal contains different options for setting charges to DG that would not be covered by the time-limited exemption. Ofgem has also proposed a timetable for implementation of the EDCM for non-exempt generation –DNOs to submit methodology by April-May 2012 –Implementation on April 2013 Consultation closes on 5 December 2011

DCUSA CP timeline 1 December | Energy Networks Association – DCMF ActivityTarget Date Methodology text submitted for legal review28 November 2011 DCP 109 Consultation issued08 December 2011 WG meeting to review Consultation responses09 January 2012 Change Report presented to DCUSA Panel18 January 2012 Party Voting ( 2 weeks)23 January 2012 Authority Determination14 March 2012 Implementation01 April 2012