Value Stream Management for Lean Healthcare ISE 491 Fall 2009 The Elimination of Waste in Healthcare - Lecture 5.

Slides:



Advertisements
Similar presentations
Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
Advertisements

5S training Office Environments.
The information contained in this presentation, the source code and underlying program are protected by copyright owned by PlusDelta Technologies, LLC.
A Brief Introduction to Lean Concepts for the Office Bill Motley, CEM, CQMgr, PMP Program Director, Production, Quality & Manufacturing Curricula Development.
Process Excellence L6S The “8 Wastes” Discussion
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
Presents Establishing a Lean Quality Approach to Denial and Appeal Management.
An introduction to Lean tools and methodologies
Understanding the Current Condition
Healthcare Performance Group Lean Process Improvement and Value Stream Mapping Clayton State University Kelley Hundt Paul Todd.
Value Stream Management for Lean Healthcare IDM 404 Spring 2015 Lean Six Sigma Terminology SOURCES: Minitab 15 Help Guide The Lean Healthcare Pocket Guide.
1 © 2005 Superfactory™. All Rights Reserved. Lean Office - 5S and Visual Controls Superfactory Excellence Program™
JIT and Lean Operations
Laboratory Management - 1
Value Stream Mapping.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
LEAN and Sustainable Supply Chains CHAPTER 13. Learning Objectives 1. Describe how Green and Lean can complement each other. 2. Explain how a production.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes.
Input Design Objectives
WHA Improvement Forum For December    “Removing Waste and Improving Efficiencies”   Tom Kaster Courtesy Reminders: Please place your phones on MUTE.
How Team-Oriented Problem Solving Unleashes Workforce Creativity Gerard M. Cronin Kaizen Promotion Office Manager Massachusetts General Hospital CCM Vivarium.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT
Value Stream Management for Lean Healthcare ISE 491 Fall 2009 The Identification of Waste in Healthcare - Lecture 4.
LeanSigma ® Facilitator Training Module 5 – Waste.
Value Analysis/ Flow Analysis
Lean Basics Dewey Warden.
Overview of the Balanced Scorecard Concept IDM 404 Spring 2014 Dr. Joan Burtner Associate Professor, Department of Industrial Engineering and Industrial.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
OPERATIONS MANAGEMENT for MBAs Fourth Edition 1 Meredith and Shafer John Wiley and Sons, Inc. Chapter 5: Process Improvement: Reducing Waste Through Lean.
WASTE Process Improvement Consulting.
What is DOWNTIME? Scott Thor © Variance Reduction International, Inc. (VRI), All Rights Reserved.
Philosophy and Key Concepts
Lean Production (MUDA)
KAIZEN IN HOSPITAL MANAGEMENT Dr S Sridharan MBBS, M.Sc (Med.Admn.), MD (Col.), Dip. IT.
Toney L Ferguson M.B.A., M.P.M. Lean Manufacturing.
Value Stream Management for Lean Healthcare ISE 491 Fall 2009 Data Collection - Lecture 6.
Lean Office Training YOU to Recreate Your World Course Agenda »Lean office overview »Definition of waste »Implementing lean tools »Next steps.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
Value Stream Management for Lean Healthcare ISE 491 Fall 2009 Process Improvement in Healthcare - Lecture 3.
Lean Healthcare - The Identification of Waste in Healthcare
1 Slides used in class may be different from slides in student pack Chapter 12 Just-in-Time and Lean Systems  JIT Defined  The Japanese Approach to Productivity.
Lean Healthcare Deployment and Sustainability Overview
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Lean Healthcare - The Use of Value Stream Maps in Healthcare ISE 468 ETM 568 Spring 2015 Dr. Joan Burtner.
Value Stream Management for Lean Healthcare ISE 491 Fall 2009 Lean Six Sigma Healthcare Terminology - Lecture 8.
Waste reminder The 8 Wastes To remember The 8 Wastes, you can use the acronym “DOWNTIME” Defects Efforts caused by rework, scrap, and incorrect information.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
VMPS and Surgery Applying the Virginia Mason Production System to the Operating Room Rabia Nizamani, MD General Surgery, R3 Thursday, July 19, 2012.
Operational Excellence Molina Healthcare Washington Lora Nelson & Alexander Thompson.
Value Stream Management for Lean Healthcare IDM 404 Spring 2014 Lean Six Sigma Terminology SOURCES: Minitab 15 Help Guide The Lean Healthcare Pocket Guide.
Making the Case for Lean Management in Medical Staff Services
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
Shamreen Pradhan ETM Graduate Student
Lean Healthcare - The Identification of Waste in Healthcare
A Brief Introduction to Lean Concepts for the Office
Value Stream Management for Lean Healthcare
Welcome to my presentation
Overview of the Balanced Scorecard Concept
Ideas and skills not used Movement of people or material
Lean Healthcare Deployment and Sustainability Overview
Value Stream Management for Lean Healthcare
8 Wastes of Lean Waste Over-production Defects Inventory
8 Wastes of Lean Last Revised: 8/8/2017.
Eight Wastes – DOWNTIME Acronym
Introduction to Lean and Lean Training
Waste.
Presentation transcript:

Value Stream Management for Lean Healthcare ISE 491 Fall 2009 The Elimination of Waste in Healthcare - Lecture 5

Fall 2009ISE 491 Dr. Burtner Lecture 5 Slide 2 Eight Categories of Waste (in Healthcare) Overproduction Waiting Excess Motion Excess Conveyance Over-processing Inventory Defects Unused Creativity Fall 2009ISE 491 Dr. Burtner

Fall 2009ISE 491 Dr. Burtner Lecture 5 Slide 3 Overproduction (Unnecessary Services) Producing work or providing a service before it is required or requested Some Elimination Strategies  Establish continuous work flow in terms of product or service needed at the appropriate time (for the downstream customer)  Create visual controls to prevent early processing of information or services  Ensure information is only entered into one common database for authorized users  Create checklists to ensure all necessary information is collected at the appropriate time  Ensure distribution lists and reports are distributed to necessary staff only Fall 2009ISE 491 Dr. Burtner

Fall 2009ISE 491 Dr. Burtner Lecture 5 Slide 4 Waiting Waiting for people, equipment, signatures, supplies, information, etc. Some Elimination Strategies  Review and standardize signature and approval requirements.  Cross-train staff to accommodate changes in service demands  Balance workloads throughout the day and ensure staff members are working optimally.  Ensure equipment and supplies are located in close proximity to their required use.  Ensure work items are labeled and a point-of-use (as appropriate) Fall 2009ISE 491 Dr. Burtner

Fall 2009ISE 491 Dr. Burtner Lecture 5 Slide 5 Excess Motion Excess movement of people, equipment, paperwork, electronic communication that does not add value Some Elimination Strategies  Ensure supply areas are well organized utilizing color codes and labels for quick access  Organize computer files for easy retrieval  Establish file naming conventions within departments  Establish standards of communication ensuring doctor’s orders and charts are easily accessible for authorized staff.  Relocate staff, equipment, to closest area that requires service Fall 2009ISE 491 Dr. Burtner

Fall 2009ISE 491 Dr. Burtner Lecture 5 Slide 6 Excessive Conveyance (Excessive Transportation) Delivering work products without adding value In the healthcare environment, the patient is a “work product” that flows through the system Examples  Delivery of equipment too early or too late  Transporting patients to surgery prematurely  Moving samples or specimens to the wrong location  “Placing a gurney in the hall and constantly having to more it” Fall 2009ISE 491 Dr. Burtner

Fall 2009ISE 491 Dr. Burtner Lecture 5 Slide 7 Overprocessing Putting work into accomplishing something that the patient, physician, or healthcare provider either does not ask for or does not want Results in non-value added work that the customer does not want to pay for Examples  Retesting (eg. Performing a second 24-hour urine test because a staff member obtained the first specimen incorrectly)  Ordering more diagnostic tests than the diagnosis warrants (eg. ordering a Chem 24 when a Chem 6 will suffice  Entering repetitive form information  Completing excessive paperwork Fall 2009ISE 491 Dr. Burtner

Fall 2009ISE 491 Dr. Burtner Lecture 5 Slide 8 Inventory Excess or outdated supplies; excess work piles Elimination of inventory frees up space and makes it easier to find essential items quickly Examples  Duplicate medications and supplies in excess of normal usage  Obsolete office equipment  Excessive office supplies  Obsolete charts, files, and medical equipment  Extra or outdated manuals, newsletters, or magazines Fall 2009ISE 491 Dr. Burtner

Fall 2009ISE 491 Dr. Burtner Lecture 5 Slide 9 Defects Also known as mistakes or errors Defect waste includes all processing required to correct a defect or mistake It takes less time to do it right the first time than to discover and correct the mistakes Examples  Medication errors  Incorrect patient information  Incorrect procedure  Missing information  Redraws Fall 2009ISE 491 Dr. Burtner

Fall 2009ISE 491 Dr. Burtner Lecture 5 Slide 10 Unused Creativity Not utilizing the available talents and skills of the staff to their fullest Examples  Insufficient cross-training of staff  Reluctance to elicit process improvement ideas from workers closest to the process  Design of policies, procedures, and practices without sufficient input from workers Fall 2009ISE 491 Dr. Burtner

Fall 2009ISE 491 Dr. Burtner Lecture 5 Slide 11 Primary Sources The Lean Healthcare Pocket Guide XL (2008) Authors: Debra Hadfield, RN MSN and Shelagh Holmes, RN Value Stream Management for Lean Healthcare (2009) Authors: Don Tapping, Sue Kozlowski (CSSBB), Laura Archbold (RN, BSN,MBA), and Todd Sperl (MBB)