Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Flood Hazard Areas & the NJPDES Rule s © 2009 Fox Rothschild Land Use and Environmental Regulation in New Jersey October 14, 2009 Flood Hazard Areas &
11 Virginia Stormwater Management Regulations December 9, 2013 Va Soil and Water Conservation Districts Annual Meeting.
PENNSYLVANIA CODE Title 25.Environmental Protection Chapter 102 Erosion and Sediment Control Clean Streams Law-Act 394 of To preserve and improve.
What is NPDES? “National Pollutant Discharge Elimination System”
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Final Rulemaking Chapter 102 Erosion and Sediment Control and Stormwater Management Summary of Revisions.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
General Ag. Compliance & Chesapeake Bay Update. PA Clean Streams Law & General AG Compliance Prevent discharge of pollutants & water quality impairment.
Indiana 6217 Coastal Nonpoint Source Pollution Control Program – What it is, and What it Means!
Department of Conservation and Recreation 1 Proposed Stormwater Management Requirements for Virginia Rappahannock River Basin Commission June 24, 2009.
Env 247 Overview of Stormwater Management March 1, 2011.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Chanhassen’s 2006 Surface Water Management Plan Carver County WENR Meeting March 27, 2007 Lori Haak Water Resources Coordinator
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Nutrient Management in the Urban Landscape Rebecca Kluckhohn, P.E. Watershed Engineer West Metro Water Alliance Forum, May 18 th 2011 W W e n c k Engineers.
Environmental Viewer and KPDES Permit Maintenance Managers April 2007.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Bureau of Watershed Management Regulatory Proposal Chapter 105 Dam Safety and Waterway Management February 21, 2007.
Module 1: Stormwater Permit Program Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL.
City of Puyallup Planning Commission Presentation February 8, 2012.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
1 Stormwater Management in Virginia: Proposed Amendments to Parts I, II, III, and XIII of the Virginia Stormwater Management Program Regulations Russell.
Overview of Montana’s Stormwater Regulatory Program.
Stormwater Treatment and Flow Control Dan Cloak Presentation to the Citizens Advisory Committee November 13, 2006 Options for implementing new Phase II.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Ordinance No. 489 BMC Chapter SURFACE WATER MANAGEMENT.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
From the Beginning Design Standards and Other Post-Construction Program Elements.
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Chapter 10 Local, Regional, State, and Multistate Water Management Agencies.
Clear, Consistent, & Predictable Rules Unifying State and Local Soil Erosion and Sediment Control Standards for Better Outcomes Eric Beck, P.E. Supervisor,
Bureau of Watershed Management Preliminary Regulatory Proposal Chapter 102 Erosion, Sediment and Stormwater Management December 19, 2007.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Pollution Control: For Field Office Construction Sites.
Durham County Soil & Water Conservation District January 28, 2016 Michael Dupree.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
Supervisor, RIDEM RIPDES Permitting Program
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
MS4 OVERVIEW 2015.
Presentation transcript:

Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21, 2007

Scope and Size Anyone who disturbs the earth –Individuals –Corporations –Farmers –Government Annual Activity –450 individual permits issued –2500 general permit coverage authorized –14,500 erosion and sediment control plans reviewed

The Current Basics Control accelerated erosion and sedimentation Everyone needs to implement and maintain erosion control BMP measures. Written erosion and sediment control plans are required if earth disturbance = 5000 sq.ft., or has potential to discharge to Special Protection Waters Plans must be reviewed and approved if an NPDES Permit is required.

Themes for Change Manage stormwater as a resource Solidify relationship with Water Quality Protection and Permitting regulations Chapter 92 and Chapter 93 requirements Address Post-Construction Stormwater Management Incorporate buffer requirements

Themes for Change Proper organization of planning and permitting requirements Streamline permitting for low risk and high value activities Create a statewide stormwater management baseline requirement

Proposed Changes New section devoted to agriculture –Agricultural requirements revised to be consistent with ACRE. –Specifically describes required erosion and sediment control plan elements (Ex. Pasture BMPs, crop residue, and contour farming) –Allows a simplified plan for low risk farming operations (e.g. no water features) –New programs for agricultural impaired watersheds.

Proposed Changes Earth disturbance activities other than agriculture –Requires buffer along perennial and intermittent streams, lakes, ponds, reservoirs and wetlands Forested buffers required to restore impaired waters. –Integrated approach to stormwater management

Proposed Changes All municipalities required to develop a stormwater management ordinance that addresses both water quality and quantity.

Proposed Changes New post-construction stormwater management provisions –Incorporates written plan requirements of NPDES application into state regulation –Emphasize Applicant responsibility for plan implementation. –Requires permission of owner to discharge stormwater onto adjacent property –Licensed PE’s are expected to be in Responsible Charge of engineered stormwater BMPs.

Proposed Changes Codifies Current PCSM Plan requirements (examples) –Consistent with Act 167 plan and MS4 permit –Avoid & minimize point source discharges –Prevent runoff rate increase, minimize volume of runoff –Preserve natural features –Minimize impervious areas –Special protection BMPs must be considered in HQ, EV, and TMDL watersheds (e.g. green roofs, open space, reuse/recycling)

Proposed Changes Erosion and Sediment Control Permit required for Oil and Gas activities involving 5 acres or more. Naturally occurring geologic formations or soil conditions that may have potential to cause accidental pollution must be avoided or minimized (acid rock, karst areas, landslide prone areas). Antidegradation provisions consistent with Chapter 93.

Proposed Changes Permit authorization for post- construction discharges –Require O&M Plans for PCSW BMPs –Responsible parties required to provide long term O&M for PCSM BMPs

Proposed Changes Streamline NPDES Permitting (Registration/Permit by Rule) –Single family dwellings with earth disturbance of less than five acres –Mine reclamation sites –Emergency clean-up from floods and landslides, or other natural disasters –Others with low impact, minimum risk

Proposed Changes Enables DEP to delegate administration and enforcement of the Chapter to “municipal authorities” in addition to County Conservation Districts with adequate and qualified staff

Benefits PCSM requirements encourage low impact development, and discourages sprawl PCSM planning reduces energy (fuel) use during construction Prevent or minimize stormwater problems with planning and mitigate remaining problems with structural or non-structural BMPs Encourage reuse and redevelopment of existing, developed sites