Resource Cost Working Group December 2, 2015 WMS Update.

Slides:



Advertisements
Similar presentations
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
Advertisements

1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
RCWG Update to WMS July 8, VCMRR008 - Alignment with NPRR700, Utilizing Actual Fuel Cost in Startup Offer Caps NPRR700 approved at May 2015 WMS.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
Real Time Mitigation During Exceptional Fuel Cost Events.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
RCWG Update to WMS July 10, General Update Agenda Items for Today: Fuel Adder NPRR 485-(no vote) Variable O&M for Technology Types (vote) Seasonal.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
STANDARD & GENERIC COSTS FOR WOOD FIRED BIOMASS PLANTS H.BASARAN/B.CHAKKA AUSTIN ENERGY RCWG MEETING SEPTEMBER 21,
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
Resource Cost Working Group October 7, 2015 WMS Update.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
Market Credit Working Group update to the Wholesale Market Subcommittee 09/02/
Credit Updates Vanessa Spells Credit Work Group ERCOT Public December 16, 2015.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
ERS Overview of Upcoming Changes.  Procedure Changes – ERS Generator Resources  Reporting Requirements – ERS Load Resources with Back-Up Generators.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
Utilization of Fuel Costs in Ercot Markets Ino González RCWG Meeting 2/24/2016.
Verifiable Cost Escalation Cost Factors ERCOT WMS 11/13/2013.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public May 18, 2016.
Credit Updates ERCOT Public NPRR 612 – Reduction of Cure Period Subsequent to Event of Default –Approved on 12/09/2014 by Board of Directors. Expected.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Project Update and Summary of Project Priority List (PPL) Activity
Fuel Cost Components for Resource Mitigation
Settlement Update Austin Rosel ERCOT February 27, 2017.
Fuel Cost Components in the Fuel Adder
Exceptional Fuel Costs in LMP
Fuel Cost Components in the Fuel Adder
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Resource Cost Working Group
Verifiable Cost Working Group (VCWG) Update
August 25, 2016 TAC Update to COPS
Fuel Cost Components in the Fuel Adder
Settlement Update Austin Rosel ERCOT October 11, 2017.
Resource Cost Working Group
NPRR 816 / Vendor Index Definitions
Project Update and Summary of Project Priority List (PPL) Activity
Presentation transcript:

Resource Cost Working Group December 2, 2015 WMS Update

Fuel Cost Components in the Fuel Adder VCMRR009 Calculation of Minimum Fuel Requirements Fee RCWG continued discussion of Appealing Verifiable Cost Rejections per Section 12 of the VCM. – First Level of Appeal: Review by an “ERCOT Verifiable Cost Appeals group” that is not part of the ERCOT verifiable cost team. – Second Level of Appeal: Review by the ERCOT Board (not limited to unaffiliated Directors). – Drafting a VCMRR to incorporate these changes RCWG developing list of fuel cost components that can be included in the Fuel Adder.

Fuel Cost Components in the Fuel Adder VCMRR009 Calculation of Minimum Fuel Requirements Fee Natural Gas Cost ComponentsCost TypeIncludeExclude Natural gas commodity cost Variable Pipeline fuel losses Variable Pipeline commodity charges Variable Pipeline capacity reservation demand charges ? Pipeline balancing costs Variable Pipeline minimum requirement charges ? Pipeline penalties ? Storage injection and withdrawal fuel losses Variable Storage injection and withdrawal commodity charges Variable Storage capacity reservation demand charges ? Meter Charges Hedging gains/losses

VCMRR012 - Alignment with NPRR732, Alignment of Verifiable Cost Language Within Protocols NPRR732 revised paragraph (11) of Section that describes how ERCOT will determine Resource costs in the event that a QSE or Resource Entity fails to file verifiable costs within thirty (30) days of a request to file such costs. This VCMRR012 removes language in the Verifiable Cost Manual that would be in conflict with the Protocols as modified by NPRR732 Vote?

General Update Preparing draft NPRR to remove vendor fuel names for fuel indices from protocols. – ERCOT to provide a market notice 60 days prior to the effective date of the vendor change Discussing need for a coal Index price: – Possibility of replacing the $1.50 /MMBtu for solid fuel with a delivered coal index price – May need to utilize a coal index price for exceptional fuel cost and fuel adder calculations for coal and lignite resources