TIARA Mid-term meeting 12-15 June 2012 WP3: Accelerator R&D Infrastructures Anders Unnervik 1.

Slides:



Advertisements
Similar presentations
TIARA-PP Final meeting 25 – 27 November 2013 Work package 3 Accelerator R&D infrastructures Anders Unnervik 1.
Advertisements

TIARA: Status WP4 C. Omet, GSI 1.Update on WP members 2.Tasks 3.Meetings 4.Schedule 5.Status 14/06/2012TIARA Mid Term Meeting1.
WSIS + 10 review meeting “Towards Knowledge Societies for Peace and Sustainable Development” Measurement of the WSIS targets within UNESCO’s fields of.
ASPERA-2 WP2: Extension of the network and update of the status of Astroparticle Physics  Objectives  Structure  Tasks  Milestones & Deliverables Kickoff.
We’re here for you. “European Exchange of Best Practice in Arson Investigation and Prevention” European exchange of best practice in arson investigation.
Sustainable Energy Systems Int’l H 2 Safety Conf, Pisa, Italy, 8-10 Sep IPHE projects focus on pre-competitive collaborative research, development.
Stork is an EU co-funded project INFSO-ICT-PSP STORK PRESENTATION STORK Presentation Lithuania March 2010.
Delegations IV KAM Prague 3rd to 7th September 2014.
1 OECD Work on the Safety of Manufactured Nanomaterials Environment, Health and Safety Division Environment Directorate OECD.
Social Inclusion by Proactive Design InclusiveByDesign Second project meeting June 2001 Florence, Italy.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
The Preparatory Phase Proposal a first draft to be discussed.
WP10 Dissemination Oleg Liber, U. Bolton UK Objectives 1.To disseminate, on an on-going basis, the RTD outcomes: specifications and standards, architectures,
Ingenious-science.eu ECB National Needs Analysis Workshop – Israel Charmaine Kerr ECB Project Coordination.
GINA Final Meeting GINA WP4 Conclusion and Dissemination activities 3 May 2011 ERF Premises, Brussels, Belgium GNSS for INnovative Road Applications.
COST Action TU1302 – Satellite Positioning Performance Assessment for Road Transport (SaPPART) 2015, July 28 SaPPART Satellite Positioning Performance.
OPERATIONAL GUIDELINES Ensuring Ownership of PARSEL by Partners.
Work. in tune with life.. The ENWHP Founded 1996 Secretariat 31 Members Luxembourg Declaration Core Goals: To establish WHP infrastructures To disseminate.
Doing business with CERN Anders Unnervik 3 November 2014.
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
European Cooperation on Nowcasting Yong Wang, ZAMG.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions.
TIARA kickoff R. Aleksan February TIARA 1.WP2 objectives 2.Deliverables 3.Who does what 4.Organization matters 5.Conclusion
CAF Resource Centre at EIPA Open Days Patrick Staes Senior Expert European Institute of Public Administration THE COMMON ASSESSMENT FRAMEWORK.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP1 Management 10-11/07/2012COGEN Europe.
1 TIARA WP5 Status Philip Burrows John Adams Institute for Accelerator Science Oxford University 1 Philip Burrows TIARA Meeting, CIEMAT 14/6/12.
1 ASTRONET Coordinating strategic planning for European Astronomy.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
© Enterprise Europe Network South West 2009 The Eurostars Programme Kenny Legg R&D Funding for the Environmental Sector – 29 June 2010 European Commission.
Sustainability of Comenius Networks Comments, Effects, Experiences, Successions Peter Härtel Brussels, 17 th October 2005.
Entrepreneurship Indicators Project Work Programme Entrepreneurship Indicators Project
Doing business with CERN Anders Unnervik 20 May 2014.
Reformation of Toastmasters Districts in Continental Europe Prepared by Morag Mathieson DTM Committee Chair Presented to DECMs of D59 & D95 on February.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
ZeroWIN 3 rd general meeting Southampton, 5-8 July 2010.
Seite 1 Thematic Activities WP 4 and WP 5 Working Group Meeting, Halle 18 March 2014.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
ECRYPT European Network of Excellence in Cryptology Project Overview.
COST Action and European GBIF Nodes Anne-Sophie Archambeau.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
TIARA-PP Governing Council 1 representative per contractor TIARA-PP Coordinator Industry advisory committee? Project Management (WP1) Project Office Dissemination.
CERN Procurement Procedures for the HL-LHC project Civil Engineering work London, 24 June 2016 Lisa Bellini-Devictor, CERN/IPT-PI.
Brussels, January 16th, Overview and status of the project.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
AMICI WP1 – Management, coordination and dissemination
TIARA Kick-off meeting WP 3
Options for association and collaboration with CERN
CESSDA – for what and for whom?
Purchasing supplies at CERN
Luděk Matyska CESNET ERIC Survey Results Luděk Matyska CESNET
WP 4 CERN Nov 2, 2009.
ARIES WP2 Task 2.3 Coordination, support and enhancement of training activities for accelerators in Europe Meeting:2 Rutambhara Yogi (ESS)
Marine Strategy Framework Directive:
Marine Strategy Framework Directive: an introduction
WG Globalization Akın Akkoyun Barbara Junker
AMICI WP1 – Management, coordination and dissemination
TOP6 – WP4 Coordination and Management JPICH Coordination Office
ASTRONET Coordinating strategic planning for European Astronomy
Marine Strategy Framework Directive: Status of reporting Art. 8/9/10
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
REPORTING ON DELIVERY OF EU BIODIVERSITY ACTION PLAN
NATIONAL STRATEGIES FOR IMPLEMENTING THE
EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE
TOP6 – WP4 Coordination and Management JPICH Coordination Office
Presentation transcript:

TIARA Mid-term meeting June 2012 WP3: Accelerator R&D Infrastructures Anders Unnervik 1

Main objectives a)Provide a survey of the existing accelerator R&D infrastructures; b)identify discrepancies between the existing infrastructures and future needs for accelerator R&D; c)analyse the different possible options for sharing R&D infrastructures and developing joint R&D infrastructures with industry; d)define a technology roadmap for the development of future accelerator components in industry; e)propose appropriate structures that can ensure the sustainability of the process described under a) and b) and propose a common costing method for the operation, upgrade and construction of individual large infrastructures; f)define the general access policy and modalities for accessing R&D infrastructures of TIARA; g)establish technical criteria and evaluation procedures for joining the TIARA distributed infrastructure. Anders Unnervik 2

Planning, 24 months Anders Unnervik Milestone/ deliverable DescriptionDate Milestone MS 8Nomination of WPC for each ARAJan 2011/ July √ Milestone MS 9Interim Infrastructure Survey reportAugust 2011/ October √ Deliverable D 3.1Infrastructure Survey ReportDecember 2011/Feb 2012 √ Deliverable D 3.2Infrastructure Web-based DatabaseApril 2012/May 2012 √ Milestone MS 10Presentation of the IWD to the TIARA collaboratorsMay 2012/June 2012 √ Milestone MS 11Interim Infrastructure Need and Resource comparisonAugust 2012 Milestone MS 12Presentation of structure proposals for joining TIARASeptember 2012 Deliverable D 3.3Infrastructure Need and resource comparisonDecember 2012 Deliverable D 3.4Infrastructure Access reportDecember

Main achievements a)Nominate WP contacts for each Accelerator Research Area (WP4). Done! b)Carry out a survey of accelerator R&D infrastructures in Europe. Done! c)Establish contacts with Industry. Done! d)Design and implement a wed-based database for the surveyed infrastructures. Done! e)3.4.1: Identify the Critical Requirements and their Targets. Done! f)3.5.1 Definition of the appropriate Structure for ensuring the Sustainability. Done! Anders Unnervik 4

Survey of accelerator R&D infrastructures in Europe 140 infrastructures “listed”. Some detailed information still missing, e.g. cost info. Possibly some infrastructures still missing, e.g. light sources Information Web-based database! Anders Unnervik Austria 1 Denmark 1 Finland 1 France19 Germany13 Italy13 Poland 6 Slovenia 1 Spain 8 Sweden 3 Switzerland61 UK13

Contacts with industry Initial list prepared by WP3 representatives, completed by: 1.companies participating in conferences such as EPAC and IPAC; 2.companies proposed by various branch associations in the relevant fields of activity, such as PIGES and EIFAST; 3.input from the Industrial Liaison Officers appointed for each Member State at CERN; List presently (12 June 2012) composed of 356 firms in 13 European countries, all firms have been contacted. 89 firms have indicated an interest to be informed about TIARA. Anders Unnervik 6 ATBEDKFIFRDEITSLESSECHNLUKTOT

Contacts with industry Web-based questionnaire drafted to get more info from firms; May 2012: Presentation of TIARA at a workshop organized by EUSPEN (The European society for precision engineering and nanotechnology); December 2012: Possibly joint workshop with HL-LHC, ESS and Industry, related to superconducting technologies for the next generation of accelerators. Anders Unnervik 7

On-going actions a)3.2.1 CMLIN Assessing the current, medium- an long-term accelerator RDI needs (from WP4); b)3.2.2CAIN Comparison of the R&D needs with existing infrastructures; c) AAI: Analysis of Access of Industry to Existing Infrastructure; d) CRS Determine Criteria and the Rules for Sharing RDI; e)3.3.2 FMI Investigating Financial Models for developing joint RDI; f)3.4.2 ITA Identify the Technology Alternatives and give recommendations on which Alternatives that should be Pursued. g)3.5.2CMUCI Proposal of a common Costing Method for the Upgrade and Construction of individual large Infrastructures Anders Unnervik 8

List of WP3 meetings Anders Unnervik 9 MeetingDateVenueAttendanceObjective(s) Kick-off meeting23-24 Feb 2011CERN9Launch TIARA-PP WP3 meetings Jan 2011CERN5 Review WP3 objectives, milestones and deliverables. Establish work plan 4 July 2011CERN8(1)* Review survey of R&D infrastructures, discuss requirements for the web- based database 7 Oct 2011CERN9(1)*Review survey, agree on Interim ISR 15 Nov 2011CERN5(1)*Review Survey, progress in General WP3 meetings Jan 2012CERN7(1)*Review Survey report 20 March 2012CERN5 (2)*Review Database 4 May 2012CERN7Review Database Mid-term meeting12-14 June 2012CIEMAT6Review Survey, progress in General * Attendance in person (attendance via phone or web)

Updated Gantt chart Anders Unnervik 10

Anders Unnervik 11