High Power RF System Status By: Peter McIntosh Klystron Department PEP-II Machine Advisory Committee Review October 9-11 2003.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
1 Operating Experience and Reliability Update on the 5 kW CW Klystrons at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
KAGEYAMA, T. Open Meeting for Proto-Collaboration March 19, 2008.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
PEP Super-B High Power RF Peter McIntosh SLAC Super-B Factory Workshop in Hawaii April 2005 University of Hawaii.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
Peter McIntosh, PEP-II MAC Review, December PEP-II RF System Status By: Peter McIntosh Klystron Department PEP-II Machine Advisory Committee.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
Vojtech Pacak, PEP-II MAC Review, January PEP-II RF System Status and Upgrades By: Vojtech Pacak Klystron Department PEP-II Machine Advisory.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
ILC Power and Cooling VM Workshop Mike Neubauer 1 Collector Cooling Design example Failures in the field Water quality.
Performance of the Advanced Photon Source 350-MHz 1MW CW Klystrons Doug Horan RF Group Accelerator Systems Division CWRF08 Workshop March 25-28,2008.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Anders Sunesson RF Group ESS Accelerator Division
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
9/6/2007 PEP-II LER RF High Current MD Report Dan Van Winkle, Claudio Rivetta, Kirk Bertsche, Themis Mastorides.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
Operational experience of high-power RF at Diamond Light Source
A 350 MHz, 200 kW CW, Multiple Beam IOT Lawrence Ives, Michael Read, David Marsden, R. H. Jackson, Thuc Bui Calabazas Creek Research, Saratoga, CA. USA.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
ALBA RF Systems Francis Perez.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Areal RF Station A. Vardanyan
High Efficiency Klystron
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
A frequency choice for the SPL machine: Impact on hardware
Physics design on Injector-1 RFQ
Vacuum System Failures at HERA
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
RF operation of REX-ISOLDE
SNS Fundamental Power Coupler History
CEPC RF Power Sources System
PEP-II RF System Status and Upgrades
PEP-II Status and Plans e+e- Factories Workshop
Accelerator R&D Results from the B-factory
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Operational Experience with LCLS RF systems
Presentation transcript:

High Power RF System Status By: Peter McIntosh Klystron Department PEP-II Machine Advisory Committee Review October

Peter McIntosh, PEP-II MAC Review, October Summary PEP-II RF System Klystron Status Waveguide and Circulator Status Cavity System Status HVPS Status RF System Trips Future Plans Conclusions

Peter McIntosh, PEP-II MAC Review, October PEP-II RF System 1.2 MW Klystron Circulator Control Racks Penetration Load

Peter McIntosh, PEP-II MAC Review, October PEP-II RF System Currently have on PEP-II: –8 HER stations: 5 x 4-cavity stations 3 x 2-cavity stations –HER 4-1 installed summer 2003 Max HER V RF = 19.5 MV (750kV/cavity) –3 LER stations: All are 2-cavity stations Max LER V RF = 5.1 MV (850 kV/cavity) In 2004 will be installing: –LER4 (2-cavity station)  additional 1.7 MV Max LER V RF will become 6.8 MV –HER9  Split existing 4-cavity HER station into 2 x 2-cavity stations no overall increase in HER V RF, but more beam power available.

Peter McIntosh, PEP-II MAC Review, October Klystron Status 7 major operational failures: 3 Philips anode, 3 Marconi vacuum, 1 Philips heater Expected klystron lifetime ~30k hours  have 4 with >33k hours

Peter McIntosh, PEP-II MAC Review, October Philips Klystrons - Anodes The anodes on the Philips klystrons are designed to run hot  minimize the deposition of barium from the cathode. A heat trap or ring is employed around the anode to ensure the anode runs at an elevated temperature. Suspect that the anode rings got too hot and the for 3 of the Philips klystrons became detached under normal operating conditions. The filament power was subsequently reduced in Aug 2001 on ALL Philips klystrons (maintaining the correct beam perveance) to protect against further anode ring failures.

Peter McIntosh, PEP-II MAC Review, October Philips Klystrons – Side-bands The +15 MHz instability: –Philips tubes have their 2 penultimate cavities typically tuned close together: C5 = MHz C6 = 493 MHz –Generates Gain at these frequencies if excited. –These cavities have no frequency adjustment mechanism and so are difficult to re-tune. –Theory: Returning electrons from the collector excite either/both these cavity resonances  significant gain at +15 MHz HER 8-3 (Philips S/N 01) Feb 2002 HER 12-1 (Philips S/N 06) Oct 2000

Peter McIntosh, PEP-II MAC Review, October Philips Klystrons – Side-bands Power at +15 MHz is outside the BW of the circulator and is reflected back to the klystron  driving the instability further. Counteracting measures used: 1.Adjust the output match of the klystron  reduces the amount of returning electrons, but also reduces klystron gain at 476 MHz! 2.Alter the waveguide length between klystron and circulator  adjusts the phase of the reflected power. 3.Adjust the circulator bias  change its match characteristics at +15 MHz with marginal affect at 476 MHz. Combination of all 3 employed to successfully overcome this instability for the Philips klystrons. HER 12-1 (Philips tube S/N 06) is much more sensitive to this phenomena than all other Philips klystrons (C5 and C6 tuned much closer together!) and has required frequent attention.

Peter McIntosh, PEP-II MAC Review, October Marconi Klystron (Oct 2002) Vacuum leak identified at the collector braze joint on each of the 3 failed Marconi klystrons. When trying to find the, found each of the collector bodies had deformed. Deformation occurred in approximately the same location for all 3 klystrons. Excessive heating of the collector the primary cause. Marconi S/N 02 and 03 rebuilt at CPI with an improved collector design: –has longitudinal cooling channels as opposed to radial channels. –Baffled water circulation to specifically direct water around the collector braze joint.

Peter McIntosh, PEP-II MAC Review, October SLAC Built 1.2 MW Klystrons SLAC S/N 01 installed March 1997 in HER 12-3 and has operated without any problems. Failure problems with the Philips and Marconi tubes have been rectified without impact to PEP-II operations. It is expected that more Philips tubes will fail in the near future: –will be replaced by SLAC built units currently being manufactured.

Peter McIntosh, PEP-II MAC Review, October Waveguide/Circulator Status 11 x 1.2 MW AFT circulators installed – No failures during PEP-II history. 32 x 1.2 MW Dielectric loads installed – 1 failure during PEP-II history. 562 x WR2100 MEGA waveguide components installed: –In the last 2 years only 1 incident in Nov 2002 on HER 8-3: Matching post on the first Magic Tee failed resulting in a ruptured bellows near the circulator.

Peter McIntosh, PEP-II MAC Review, October HER 8-3 Waveguide (Nov 02) Circulator 1 st Magic Tee Matching Post Damaged Bellows Teflon Barrier

Peter McIntosh, PEP-II MAC Review, October Cavity System Status Cavities are RF processed individually in a dedicated test facility up to a higher V RF than is typically run on PEP-II  up to 850 kV/cavity. Cavities are also RF processed in-situ at this higher level when installed (1.7 MV for each 2-cavity station and 3.4 MV for each 4- cavity station). Cavity operating parameters on PEP-II: Cavity Parameter HERLER NominalTypical*NominalTypical* RF Voltage/Ring Number of Klystrons8733 Number of Cavities Gap Voltage/Cavity (kV) Dissipated Power/Cavity (kW) Beam Current (A) Beam Power/Cavity (kW) RF Window Power (kW) Klystron Power (kW) * Parameters for peak and Integrated Luminosity records May-June 2003

Peter McIntosh, PEP-II MAC Review, October Cavity System Status 26 HOM-damped cavities installed in the HER. 6 installed in the LER. Only 1 major component failure in last 2 years: –a broken HOM-load water fitting on cavity HER 12-1A in Oct 2002 which could not be repaired in-situ, required replacement of the HOM-load. No cavities, coupling networks or RF windows have needed to be replaced once installed. RF Cavity Support Raft Tuners HOM loads Coupling Network RF Window Vacuum Pump

Peter McIntosh, PEP-II MAC Review, October Crowbar SCR Upgrade In summer 2002, the HVPS crowbar SCR stacks were replaced with optical-fired SCRs to improve station reliability. Found in early 2003 that the new SCRs were failing due to broken hermatic seals which leaked oil leading to high current leakage in the devices. Found a large number of new units which had high current leakage, but also a number which were electrically faulty but without the high leakage characteristics. ALL 10 crowbar SCR stacks, containing a total of 240 SCRs replaced ‘again’ with functional SCRs. Voltage divider networks installed on all station crowbar stacks to limit the load at the individual SCRs.

Peter McIntosh, PEP-II MAC Review, October RF System Trips Klystron –Klystron failures (anode failure and collector vacuum leaks) –Side-band instabilities –Arcs Cavity –Vacuum – predominantly HER 12-1 and 8-1  synchrotron radiation from upstream bending arcs also from newly installed stations. –Arcs at the RF window (majority on the vacuum-side, but also some air- side trips) –Reflected power aborts: when beam is lost always get Reflected Energy (RE) interlock at the RF stations  cause not always originating in the RF system! HVPS –SCR stack failures –Current and Voltage regulation (complicated system requiring regular maintenance). –Over Temperature, particularly during the summer months: Additional cooling and protection from sun exposure has successfully limited the number of Over Temp trips in the last 2 years. Waveguide –Component failures: bellows and loads

Peter McIntosh, PEP-II MAC Review, October PEP-II Station Arc Trips

Peter McIntosh, PEP-II MAC Review, October PEP-II Cavity Vacuum Trips

Peter McIntosh, PEP-II MAC Review, October Future Plans Continue adding more RF stations:  higher beam currents in both HER and LER,  higher Luminosity  HER 8-1 and 12-1 will split into 4 x 2-cavity stations:  Allowing more efficient use of available klystron power. Improve RF system diagnostics to more accurately diagnose RF system trips. Convert HVPS rectifiers to optical SCRs (similar to the new crowbar SCRs) to further improve reliability.

Peter McIntosh, PEP-II MAC Review, October Conclusions Of the 15 klystrons installed on PEP-II, 7 have required a major re-build in 6.5 years of PEP-II operation – ~ 1 repair/year! 32 HOM-damped cavity systems now installed, with only 1 major component failure to date. The waveguide feeder and circulator isolation systems have an excellent performance record – only 1 load and 2 waveguide component failures to date. The crowbar SCR upgrade for the HVPS’s, although problematic, was successful! When HER 8-1 and 12-1 are split into 2-cavity stations, it is hoped the number of arcing trips/station reduces. As HER 12-5 and 12-6 accumulate more ‘active’ running time, the number of cavity vacuum trips is expected to reduce.

Peter McIntosh, PEP-II MAC Review, October Conclusions Records for peak and integrated Luminosities have been smashed in the last PEP-II run: –Peak L = x cm -2 sec -1  June –Intg. L = fb -1  May (7 days) Which is testament in no small part to the capability and reliability of the PEP-II RF system. System upgrades are planned to increase further the RF system capability  more stations. With better diagnostics and upgraded LLRF systems, RF reliability should also be improved upon (see Breakout Session: “RF and Feedback”).