October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

Electrical and Computer Engineering Mississippi State University
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Demand Response in the Reliability Pricing Model Chuck Whitlock.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
Concerns with RUC Capacity Short Charge and Energy Trades.
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Stakeholder Meeting February 13, 2008 Interaction between Scarcity Pricing and Demand Response Dongqing Holly Liu, Ph.D. Senior Market and Product Economist.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
2007 ERCOT SOM Report Recommendations Dan L. Jones Vice President Director, ERCOT IMM Potomac Economics ERCOT Wholesale Market Subcommittee Austin, Texas.
1 Market Trials Update NATF June 1, 2010.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
EE/Econ 458 Market Overview: Time-Line and SCUC, RAC, SCED J. McCalley 1.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Wind Management at MISO
Presentation transcript:

October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1

Summary  Background  Framework Market Market Reliability Reliability Ancillary Services Ancillary Services Definitions & Other Definitions & Other 2

Background  Wind Generation Resources Over 8,000 today; 15,000 estimated by 2015 Over 8,000 today; 15,000 estimated by 2015 Inherently variable and incompletely predictable Inherently variable and incompletely predictable Will introduce operational challenges Will introduce operational challenges  Existing thermal Generation Resources can synchronize and be fully loaded ~900 MW10 minutes ~900 MW10 minutes ~1,000 MW10-15 minutes ~1,000 MW10-15 minutes ~3,700 MW15-30 minutes ~3,700 MW15-30 minutes 3

Framework 4 Ancillary Services Definitions & Other

Market  SCED Cannot commit Off-line Generation Resources Cannot commit Off-line Generation Resources Some Generation Resources can synchronize within SCED timeframe Some Generation Resources can synchronize within SCED timeframe Therefore, market solutions ignored, causing potentially artificially higher energy prices Therefore, market solutions ignored, causing potentially artificially higher energy prices  Market Participants may self-commit Exposed to price risk Exposed to price risk Not economically optimal Not economically optimal 5

Market – Efficiency Improvements  2008 State of the Market Report “…Under the nodal market design, the introduction of a day- ahead energy market with centralized Security Constrained Unit Commitment (“SCUC”) that is financially binding promises substantial efficiency improvements in the commitment of generating resources.”  Systematic reliance on non-centralized unit commitment decisions for over 5,000 MW would impair the promised substantial efficiency improvements. 6

Reliability – Normal  Day-Ahead Reliability Unit Commitment Received by 1600 in Day-Ahead Received by 1600 in Day-Ahead  Hour Reliability Unit Commitment Received throughout the Adjustment Period Received throughout the Adjustment Period May be received intra-Operating Period May be received intra-Operating Period 1 hour before Real-Time1 hour before Real-Time  Clawback is 50% (DAM) or 100% (no DAM) 7

Reliability – Emergency  Emergency Condition Occurs when SCED fails Occurs when SCED fails LMPs held for most recently solved interval LMPs held for most recently solved interval  Emergency Mechanisms Verbal Dispatch Instruction unit commitment Verbal Dispatch Instruction unit commitment VDI settled as HRUC [ ] VDI settled as HRUC [ ] No clawback during EEA (DAM) [5.7.2(3)] No clawback during EEA (DAM) [5.7.2(3)] 8

Reliability – Observations  RUC Normal does not utilize flexibility and has clawback Normal does not utilize flexibility and has clawback Emergency may utilize flexibility and has no clawback Emergency may utilize flexibility and has no clawback  Clawback If RTSPP > Energy Offer Curve, Quick Start Units could have provided market solution without RUC Dispatch Instruction If RTSPP > Energy Offer Curve, Quick Start Units could have provided market solution without RUC Dispatch Instruction Similar to Zonal OOME unit commitment Similar to Zonal OOME unit commitment 9

Ancillary Services  NSRS 30-minute timeline 30-minute timeline Dispatch Instructions to 100% of capacity Dispatch Instructions to 100% of capacity  Observation No Nodal comparable mechanism to Zonal Balancing Energy Capable Non-Spinning Reserve Service (BESCNSRS) No Nodal comparable mechanism to Zonal Balancing Energy Capable Non-Spinning Reserve Service (BESCNSRS) 10

10MNSRS  Avoids cost related to sub-optimal operation of On-line reserved capacity  Provides intermediate mechanism to ensure reliability between RRS and NSRS  Recommended in GE Wind Report  Exists in PJM, Caiso, MISO, ISO-NE and NYISO  Would encourage investment in innovative technology 11

Definitions  Observations Terms “commit” and “reserve” intermixed Terms “commit” and “reserve” intermixed Some RUC definitions inconsistent, unclear or recursive Some RUC definitions inconsistent, unclear or recursive  Undefined terms Quick Start Unit Quick Start Unit COP status of Quick Start Units COP status of Quick Start Units 12

Nodal QS Strategy 13 Go-Live Q Version 2.0 Now Q NPRR NOGRR QSTF & Other Forums Phase 1: Issue Definition Phase 2: Comparables Phase 3: Solution No System Change NPRR/NOGRR Comprehensive Solutions NPRR/NOGRR Other Changes

Questions and Answers 14