Module 5: Clear link to results and monitoring of capacity development Supporting change through Capacity Development.

Slides:



Advertisements
Similar presentations
Presented at the ECOSOC 2012 Development Cooperation Forum 1 st High-level Symposium Bamako, Mali 5-6 May 2011 by Timothy Lubanga, Assistant Commissioner.
Advertisements

1 Mateja Bizilj PEMPAL BCOP KEY CONCEPTS AND APPROACHES TO PROGRAMS AND PERFORMANCE Tbilisi, June 28, 2007.
Linking regions and central governments: Indicators for performance-based regional development policy 6 th EUROPEAN CONFERENCE ON EVALUATION OF COHESION.
EuropeAid Making Technical Cooperation more effective __________________ EC Guidelines on Technical Cooperation and Project Implementation Units - Key.
Module 7 Understanding the change process Towards more effective Capacity Development.
1 Module 4: Partners demand and ownership Towards more effective Capacity Development.
EuropeAid Capacity Development support for CSOs CD as key driver of Aid & Development effectiveness art 22 (Busan) CSOs : independent development actors.
Role of CSOs in monitoring Policies and Progress on MDGs.
South Africas MTEF Effective expenditure for development Malawi Poverty Monitoring System Workshop July 2002.
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
USE OF REGIONAL NETWORKS FOR POLICY INFLUENCE: THE HIS KNOWLEDGE HUB EXPERIENCE Audrey Aumua and Maxine Whittaker Health Information Systems Knowledge.
Donald T. Simeon Caribbean Health Research Council
HR Manager – HR Business Partners Role Description
AN INTRODUCTION TO SPHERE AND THE EMERGENCY CONTEXT
Ray C. Rist The World Bank Washington, D.C.
1 Module 6: Clear link to results and monitoring of capacity development Effective Capacity Development From Theory to Practice.
MONITORING AND EVALUATION – A PERSISTENT CHALLENGE 78 th Session of the Evaluation Committee Rome, 5 September 2013.
Human Resource Management (HRM) The Basics of Performance Management.
Monitoring Evaluation Impact Assessment Objectives Be able to n explain basic monitoring and evaluation theory in relation to accountability n Identify.
CONCEPT PAPER RESULT BASED PLANNING. RESULT-ORIENTED PLANNING Overall Objective/ Goal Specific Objective/ Purposes Expected Result/ Output Activities.
1 Module 7: Designing the Change Process Effective Capacity Development From Theory to Practice.
Module 2: Concepts and Principles Supporting change through Capacity Development.
RESULTS BASED MANAGEMENT IN TANZANIA. STAGE 1 Service Delivery Survey - MDAs have to undertake these surveys which focus on external customers and are.
Module 1: Introduction Effective Capacity Development From theory to practice.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
Logistics and supply chain strategy planning
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
KEYWORDS REFRESHMENT. Activities: in the context of the Logframe Matrix, these are the actions (tasks) that have to be taken to produce results Analysis.
Impact evaluation: External and internal stakes Impact evaluation seminar - 2 to 6 December, Phnom Penh.
SECTOR POLICY SUPPORT PROGRAMMES A new methodology for delivery of EC development assistance. 1.
BPK Strategic Planning: Briefing for Denpasar Regional Office Leadership Team Craig Anderson Ahmed Fajarprana August 11-12, 2005.
The LOGICAL FRAMEWORK Scoping the Essential Elements of a Project Dr. Suchat Katima Mekong Institute.
Evaluation of sector programmes and budget support operations in the context of EU development cooperation 1 st M&E Network Forum 07 to 08 November 2011.
UNDAF M&E Systems Purpose Can explain the importance of functioning M&E system for the UNDAF Can support formulation and implementation of UNDAF M&E plans.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
FLAGSHIP STRATEGY 1 STUDENT LEARNING. Student Learning: A New Approach Victorian Essential Learning Standards Curriculum Planning Guidelines Principles.
Module 4: Partners’ demand and ownership Supporting change through Capacity Development.
European Commission Joint Evaluation Unit common to EuropeAid, Relex and Development Methodology for Evaluation of Budget support operations at Country.
1 Joint Donor Staff Training Activity Tanzania, June 2002 Partnership for Poverty Reduction Module 4 - Links between PRSP, Sector Programmes and.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
A short introduction to the Strengthened Approach to supporting PFM reforms.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Kathy Corbiere Service Delivery and Performance Commission
Lesson 4: Evaluation Plan Macerata, 29 th October Alessandro Valenza, Director, t33 srl.
Key Components of a successful Proposal OAS / IACML Workshop on Technical Assistance. San José, Costa Rica May 8, 2007 By: José Luis Alvarez R. Consultant.
Evaluating Engagement Judging the outcome above the noise of squeaky wheels Heather Shaw, Department of Sustainability & Environment Jessica Dart, Clear.
Module 3: Fit to the context and existing capacity Where do we start from? Supporting change through Capacity Development.
Presentation to the Ad-hoc Joint Sub-Committee on Parliamentary Oversight and Accountability Wednesday 20 March 2002 PUBLIC SERVICE MONITORING AND EVALUATION.
Alice Pedretti, Project Manager Effective management of complaints for companies Lessons learned from the Management of Complaints Assessment Tool Amsterdam,
SWA’s Role in Improving Aid Effectiveness in the WASH sector SWA Country Processes Task Team Geneva, November 2013.
Monitoring and Evaluating Rural Advisory Services
Session VII: Formulation of Monitoring and Evaluation Plan
Country Level Programs
Thursday 2nd of February 2017 College Development Network
Session 1 – Study Objectives
Making Technical Cooperation work for capacity building
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 6. Developing indicators.
Monitoring & Evaluation of Adaptation to Climate Change
Monitoring and Evaluating Rural Advisory Services
Claire NAUWELAERS, independent policy expert
Session 2 First steps in the LFA.
Helene Skikos DG Education and Culture
CATHCA National Conference 2018
WHAT is evaluation and WHY is it important?
Implementing Budget Reforms
Monitoring programs and projects
Making Technical Cooperation work for capacity building
Quality management in Youth centres
Presentation transcript:

Module 5: Clear link to results and monitoring of capacity development Supporting change through Capacity Development

This module discusses How to define capacity results How to monitor capacity results

CD Quality grid requirement: 3. Clear link to results and expected outcomes 3.1 Are results and/or outcomes defined beyond what the CD suppport will deliver? Please give examples of key targeted results at the level of enhanced capacity of organisation(s), if relevant, outputs that the organisation(s) produce or at the level of outcomes. 3.2 Have the country partners' inputs, which are required to sustain the results of the programme, been identified and specified? 3.3 What innovative forms of CD support have been considered, e.g. regional sources, staff exchanges or networking?

Why Is this Criteria Important? Thinking about results is at the heart of good design and management Capacity results are as important as other development results but easily lost in the results chain How to capture Capacity Results? Think in terms of the outputs of the organisation/system arising from CD processes Think beyond what external support will achieve…since it has only limited bearing on outcome

Contextual factors and actors within influence Contextual factors beyond influence Wider impact OutcomesOutputs Capacity Recurrent inputs CD processes CD support Internal resources

CD DEVELOPMENT OBJ Increased use of services CD IMMEDIATE OBJ (capacity for what) Performance improved ORGANISATIONAL CAPACITY Knowledge, systems, rules, structure, behaviour, etc CD PROCESS CD ACTIVITIES Courses, mentorship, advise, twinning, exchange, etc. CD INPUTS funds/contracts, trainers, TA PARTNER ORGANISATION/ SECTOR RESULTS CHAIN OUTCOME Use of products and services by clients/ public IMPACT Improved development result eg: better health OUTPUTS Improved products and services CAPACITY EG: PFM, leadership, logistics, technical INPUTS Budget & Staff

Challenges Easy to fall into trap of focusing on donor inputs and outputs, not organisation/ sector outputs Difficulty to specify the performance and capacity changes that are sought, and to propose indicators Theory of change often un-developed/ incomplete Assumption of simple linear causality, and underestimation of impact of other factors on results. Pressure to deliver tangible products, less on facilitating processes, and building sustainable capacity for tomorrow

Specifying CD Results Link changes in capacity to proposed changes in performance Performance = Performance change in organisational/ sector outputs (products and services) Capacity = Enhanced or changed organisational / sector capacity Aim at a realistic balance between: Improvements in capacity that can be achieved over the short to medium term and The level of performance that can be expected to accrue. Ideally reflected in a corporate/ sector development plan

Message 1 Be realistic about what can be achieved: Developing capacity is in most cases harder to achieve and support than envisaged CD and support processes take longer time than envisaged CD support only effective when aligned to partner’s reform process Think carefully about the change process required to achieve desired results; is it simple, complicated, complex (next module)

Message 2 Avoid over-specifying results given complexity/uncertainty of many CD processes Need to be able to bargain and re-strategise along the way…. Changing needs arise from lag between design & implementation Imperfect knowledge when entering the process Be clear on what you want to achieve, leave space to determine how you get there (programme estimates?)

11 Guiding questions for formulating capacity results Who or what (organisation, target group, sector, etc.) needs capacity? Why is the capacity needed – for what purpose? What type of capacity is needed in order to achieve the purpose? Context and Capacity Assessment (QC1) = key sources of information in formulating capacity results Quality of dialogue, level of ownership (QC2) and change readiness will influence what can be realistically achieved

Remember…. This is not about specifying outputs of external assistance The results chain firmly belongs to the host sector/ agency (‘country results framework’) The role of external assistance comes later

Exercise: Make the partner country CD results chain (what are the changes in capacity aimed for): CD outcome CD output(s) Organisational/Sector Capacity changes CD process CD inputs

CD DEVELOPMENT OBJ Increased use of services CD IMMEDIATE OBJ (capacity for what) Performance improved ORGANISATIONAL CAPACITY Knowledge, systems, rules, structure, behaviour, etc CD PROCESS CD ACTIVITIES Courses, mentorship, advice, twinning, exchange, etc. CD INPUTS funds/contracts, trainers, TA PARTNER ORGANISATION/ SECTOR RESULTS CHAIN OUTCOME Use of products and services by clients/public IMPACT Improved development result eg: better health OUTPUTS Improved products and services CAPACITY EG: PFM, leadership, logistics, technical INPUTS Budget & Staff Programme with a CD component or: Programme = Capacity Development

Monitoring Capacity Results Monitoring: processes, organisation and outputs of capacity development Evaluation: the CD results produced and their effect on outcomes and impact M&E framework is the flip side of the results framework and should be developed AT THE SAME TIME M&E is the basis for lessons learned and the justification for changing project structure.

M and E TC support CD processes Recurrent inputs Organisational/ Sector Capacity OutputsOutcomes Wider impact Internal resour- ces Primary focus of evaluation Primary focus of monitoring

Monitoring the Changes in Capacity Purpose is to track changes in capacity over time both for learning and accountability Can be done by looking at: changes in organisational/ sector outputs changes in organisational/ sector capacity changes in CD processes

Changes in Organisational/ Sector Outputs TC support CD processes Recurrent inputs Capacity Outputs Outcomes Wider impact Internal resour- ces

Changes in organisational/ sector outputs Delivery of products and services as foreseen in results framework – capacity for what A helpful proxy indicator but; –Outputs can improve for reasons other than capacity enhancement Indicators include: –producer data: services, products, regulations –client / customer satisfaction

Changes in Organisational/ Sector Capacity TC support CD processes Recurrent inputs Capacity OutputsOutcomes Wider impact Internal resour- ces

Formulate indicators

Changes in organisational/ sector capacity Can be monitored in many ways (tools): –Conduct periodic (self) assessments against a baseline –Conduct Assessments that are Peer-based or benchmarked against recognised standards Indicators need to be jointly selected and understood, not imposed Both quantitative and qualitative indicators required to capture both tangible and intangible elements of capacity Consider use of other methodologies such as MSC, outcome mapping; and use appreciative enquiry

Monitoring the Quality of the Change Process TC support CD processes Recurrent inputs Capacity OutputsOutcomes Wider impact Internal resour- ces

Monitoring the Change Process Success depends on joint effort, so mutual performance monitoring is important What the partner country has done in terms of leading the process What DP has done in terms of supporting the process Can be applied at programme level but also at level of individual expert, action Need to also take account of changing contextual/ PEA factors Arrange as periodic performance dialogue using a structured format Use of QC in EAMR and ROM

Monitoring roles – who does what? Who does what Monitoring of: The partnerThe EC Inputs & processes... periodic, systematic dialogue about mutual performance with TC personnel...together with partner; periodic dialogue on performance assessment; brokering of conflicts, adjustments in timeframes Outputs & outcomes...has main responsibility; serves learning, management and domestic accountability (also others, ….)...help ensure that results are monitored appropriately; appropriate feedback of CD mon. to program adjustments Outcomes & impact...has prime responsibility; serves learning and domestic accountability (also others like watchdogs, think-tanks, ….)...mainly to ‘monitor the monitoring’ by the partner’ with focus on the capacity of the domestic monitoring system (and support it)

Quantity and quality

Exercise: Formulate CD indicators based on the results chain developed earlier