GDE Status / Plans & ILC Timeline Barry Barish FALC 11-July-07.

Slides:



Advertisements
Similar presentations
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Advertisements

6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
January 17, 2008Mike Hildreth – Aspen 2008 International Linear Collider Project Status Mike Hildreth University of Notre Dame Representing the Global.
20-Jan-09 Madrid, Spain Global Design Effort 1 Barry Barish Madrid, Spain 20-Jan-09 Designing the ILC ATF-2 Final Doublet System.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Towards an International Linear Collider Barry Barish GDE 6-June-07.
Towards an International Linear Collider Barry Barish Caltech / GDE 25-July-07.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
14-Feb-08 HEPAP Global Design Effort 1 Navigating the Bumpy Road to the ILC Barry Barish GDE Workshop - Sendai 3-March-08.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
1-Feb-08 P5 Global Design Effort 1 GDE - ILC Barry Barish P5 Meeting - Fermilab 1-Feb-08.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
EUROTeV and the ILC Global Context Nick Walker (DESY) EUROTeV Annual Meeting INFN Frascati 24 January 2008.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
11 June 07 Fermilab Steering Group 1 ILC Baseline Schedule, Milestones, and Decision points Tom Himel.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
25-Sept-07 P5 Fermilab Global Design Effort 1 Report from GDE Barry Barish Caltech / GDE 25-Sept-07.
ILC-EDR Kick-off Meeting Cavities Organization and Charges Sept. 19, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Cavities Held at DESY, Sept ,
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
28-Jan-08 SiD Workshop Global Design Effort 1 ILC Status Impacts of US/UK Budget Actions Replan for GDE Technical Design Phase Barry Barish SiD Workshop.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Global Design Effort September 20-22, 2006 MAC Review R&D Programme (Tools) Eckhard Elsen GDE DESY.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
17-21 April 09 AAP - Tsukuba Global Design Effort 1 First Results of Geological Investigations of Dubna Siting of Dubna Siting Status of the ILC activity.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Oct 22 Group Leaders Planning meeting
ILC Global Design Effort
Barry Barish GDE Caltech
Nick Walker (DESY) EU GDE Meeting Oxford
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

GDE Status / Plans & ILC Timeline Barry Barish FALC 11-July-07

The GDE Plan and Schedule Global Design EffortProject Baseline configuration Reference Design ILC R&D Program Engineering Design Expression of Interest to Host International Mgmt LHC Physics

11-July-07 FALC - Rome Global Design Effort 3 –11km SC linacs operating at 31.5 MV/m for 500 GeV –Centralized injector Circular damping rings for electrons and positrons Undulator-based positron source –Single IR with 14 mrad crossing angle –Dual tunnel configuration for safety and availability RDR ILC Schematic

11-July-07 FALC - Rome Global Design Effort 4 RDR Design Parameters Max. Center-of-mass energy500GeV Peak Luminosity~2x /cm 2 s Beam Current9.0mA Repetition rate5Hz Average accelerating gradient31.5MV/m Beam pulse length0.95ms Total Site Length31km Total AC Power Consumption~230MW

11-July-07 FALC - Rome Global Design Effort 55 RDR Design & “Value” Costs Summary RDR “Value” Costs Total Value Cost (FY07) 4.80 B ILC Units Shared B Units Site Specific K person-years (“explicit” labor = 24.0 M 1,700 hrs/yr) 1 ILC Unit = $ 1 (2007) The reference design was “frozen” as of 1-Dec-06 for the purpose of producing the RDR, including costs. It is important to recognize this is a snapshot and the design will continue to evolve, due to results of the R&D, accelerator studies and value engineering The value costs have already been reviewed twice 3 day “internal review” in Dec ILCSC MAC review in Jan Σ Value = 6.62 B ILC Units

11-July-07 FALC - Rome Global Design Effort 6 Assessing the RDR Reviews (5 major international reviews + regional) –The Design: “The MAC applauds that considerable evolution of the design was achieved … the performance driven baseline configuration was successfully converted into a cost conscious design.” –The R&D Plan: “The committee endorses the approach of collecting R&D items as proposed by the collaborators, categorizing them, prioritizing them, and seeking contact with funding agencies to provide guidelines for funding. –International Cost Review (Orsay): Supported the costing methodology; considered the costing conservative in that they identify opportunities for cost savings; etc. Final Steps –The final versions of Executive Summary, Reference Design Report and Companion Document will be submitted to FALC (July), ILCSC and ICFA (August).

11-July-07 FALC - Rome Global Design Effort 7 Technically Driven Timeline BCD RDREDR Begin Const End Const Engineer Design

11-July-07 FALC - Rome Global Design Effort 8 Engineering Design Phase ILC Engineering Design –We have a solid design concept in the reference design, but it is immature and needs engineering designs, value engineering, supporting R&D and industrialization. GDE will be reorganized around a Project Management Office to reach this goal –M. Ross, N. Walker and A Yamamoto – PM “Troika” + high level engineering managers in the project office –Central management will have authority to set priorities and direct the work –Resources for the engineering design and associated R&D appears feasible –Investments toward Industrialization and siting –Anticipate LHC results by ~2010. We are committed to be ready at that time!

11-July-07 FALC - Rome Global Design Effort 9 Technically Driven Timeline August BCD Construction  Startup RDREDR Begin Const End Const Engineer Design

11-July-07 FALC - Rome Global Design Effort 10 –Three RF/cable penetrations every rf unit –Safety crossovers every 500 m –34 kV power distribution Double Tunnel

11-July-07 FALC - Rome Global Design Effort 11 Conventional Facilities 72.5 km tunnels ~ meters underground 13 major shafts > 9 meter diameter 443 K cu. m. underground excavation: caverns, alcoves, halls 92 surface “buildings”, 52.7 K sq. meters = 567 K sq-ft total

11-July-07 FALC - Rome Global Design Effort 12 Civil Construction Timeline

11-July-07 FALC - Rome Global Design Effort 13 CMS assembly approach: Assembled on the surface in parallel with underground work Allows pre-commissioning before lowering Lowering using dedicated heavy lifting equipment Potential for big time saving Reduces size of required underground hall On-surface Detector Assembly CMS approach

11-July-07 FALC - Rome Global Design Effort 14 Technically Driven Timeline August BCD All regions require ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select

11-July-07 FALC - Rome Global Design Effort 15 Situation : in solid rock, close to existing institute, close to the city of Chicago and international airport, close to railway and highway networks. Geology : Glacially derived deposits overlaying Bedrock. The concerned rock layers are from top to bottom the Silurian dolomite, Maquoketa dolomitic shale, and the Galena- Platteville dolomites. Depth of main tunnels : Average ~ 135 m Americas Fermilab Sample Site

11-July-07 FALC - Rome Global Design Effort 16 ~ 5.5 km Central Area fits inside the Fermilab boundary Site Characterization of the Central Area can be done ~ Boundary of Fermilab Preconstruction Plan for Fermilab

11-July-07 FALC - Rome Global Design Effort 17 Technically Driven Timeline August BCD All regions ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select R & D -- Industrialization

11-July-07 FALC - Rome Global Design Effort 18 The Task Forces The Task Forces were put together successively over a period of five months:  S0/S1-Cavities, Cryomodule  S2 -Cryomodule String Tests  S3 -Damping Rings  S4 -Beam Delivery System  S5-Positron Source S6-Controls, not yet active S7-RF Working in close collaboration with the Engineering and Risk Assessment team.

11-July-07 FALC - Rome Global Design Effort 19 Technically Driven Timeline August BCD All regions ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select R & D -- Industrialization Gradient

11-July-07 FALC - Rome Global Design Effort 20 Cavity Gradient – Goal Current status: Nine 9 cell cavities have been produced with gradients > 35 MeV/m. Not reproducible and needs several attempts at final processing. Goal: After a viable cavity process has been determined through a series of preparations and vertical tests on a significant number of cavities, achieve 35 MV/m at Q 0 = in a sufficiently large final sample (greater than 30) of nine- cell cavities in the low power vertical dewar testing in a production-like operation e.g. all cavities get the same treatment. –The yield for the number of successful cavities of the final production batch should be larger than 80% in the first test. After re-processing the 20 % underperforming cavities the yield should go up to 95%. This is consistent with the assumption in the RDR costing exercise.

11-July-07 FALC - Rome Global Design Effort 21 Cavity Gradient – Results KEK single cell results: 2005 – just learning 2006 – standard recipe 2007 – add final 3 μm fresh acid EP Note: multi-cells are harder than singles

11-July-07 FALC - Rome Global Design Effort 22 Module Test – Goal Intermediate goal –Achieve 31.5 MV/m average operational accelerating gradient in a single cryomodule as a proof-of-principle. In case of cavities performing below the average, this could be achieved by tweaking the RF distribution accordingly. –Auxiliary systems like fast tuners should all work. Final goal –Achieve > 31.5 MeV/m operational gradient in 3 cryomodules. –The cavities accepted in the low power test should achieve 35 MV/m at Q 0 = with a yield as described above (80% after first test, 95% after re-preparation). –It does not need to be the final cryomodule design

11-July-07 FALC - Rome Global Design Effort 23 Module Test – Results DESY

11-July-07 FALC - Rome Global Design Effort 24 Technically Driven Timeline August BCD All regions ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select R & D -- Industrialization Gradient e-Cloud

11-July-07 FALC - Rome Global Design Effort 25 E cloud – Goal Ensure the e- cloud won’t blow up the e+ beam emittance. –Do simulations (cheap) –Test vacuum pipe coatings, grooved chambers, and clearing electrodes effect on e- cloud buildup –Do above in ILC style wigglers with low emittance beam to minimize the extrapolation to the ILC.

11-July-07 FALC - Rome Global Design Effort 26 E Cloud – Results SLAC

11-July-07 FALC - Rome Global Design Effort 27 Technically Driven Timeline August BCD All regions ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select R & D -- Industrialization Gradient e-Cloud System Tests & XFEL

11-July-07 FALC - Rome Global Design Effort 28 String Test – Goal Build 1 RF unit (3 cryomodules + 1 Klystron) to fully check: –What gradient spread can be handled by LLRF system. This test should be done with and without beam loading. –For heating due to high frequency HOMs. –Amplitude and phase stability. –Static and dynamic heat loads. To partially check: –Reliability –Dark current –for degradation or other weaknesses The ILC cryomodule is enough different than that of the TTF that a new system test is warranted.

11-July-07 FALC - Rome Global Design Effort 29 Rough S2 Schedule

11-July-07 FALC - Rome Global Design Effort 30 Technically Driven Timeline August BCD All regions ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select R & D -- Industrialization Gradient e-Cloud Cryomodule Full Production System Tests & XFEL

11-July-07 FALC - Rome Global Design Effort 31 4 th generation prototype ILC cryomodule Cavities & Cryomodules Producing Cavities

11-July-07 FALC - Rome Global Design Effort 32 Schedule in Graphical Form Construction Schedule Cryomodule Production RF System Tests

11-July-07 FALC - Rome Global Design Effort 33 Technically Driven Timeline August BCD All regions ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select R & D -- Industrialization Gradient e-Cloud Cryomodule Full Production System Tests & XFEL Detector Install Detector Construct

11-July-07 FALC - Rome Global Design Effort 34 detector B may be accessible during run accessible during run Platform for electronic and services (~10*8*8m). Shielded (~0.5m of concrete) from five sides. Moves with detector. Also provide vibration isolation. Concept of IR hall with two detectors The concept is evolving and details being worked out detector A

11-July-07 FALC - Rome Global Design Effort 35 Technically Driven Timeline August BCD All regions ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select R & D -- Industrialization Gradient e-Cloud Cryomodule Full Production System Tests & XFEL Detector Install Detector Construct Pre-Operations

11-July-07 FALC - Rome Global Design Effort 36 The WWS Roadmap for ILC Detectors

11-July-07 FALC - Rome Global Design Effort 37 After the DCR The WWS effort has culminated with the production of the DCR (Detector Concept Report) which results from the work developed for the 4 concepts as described in detailed documents called the DODs (Detector Outline Document) After the DCR, the WWS is facing a new challenge set by our colleagues of the GDE: To prepare EDR documents for the 2 “contrasting complementary detectors” of ILC by 2010, by the time of significant LHC results To work out a scenario of construction of these detectors assembled on surface, two years after the construction of ILC begins with detectors ready to go down into the pit less than five years after

11-July-07 FALC - Rome Global Design Effort 38 The Roadmap for Detectors The key elements of the roadmap proposal are: A call for LOIs by ILCSC due for summer 2008 These LOIs can be based on an simple extension of the existing DODs They will be reviewed by IDAG, an International Detector Advisory Group of experts chosen by a Research Director RD (defined below) in agreement with ILCSC IDAG will make recommendations to the RD on the choice of two detectors for the engineering design effort based on detector LOIs The Research Director will present these recommendations to the ILCSC for approval

11-July-07 FALC - Rome Global Design Effort 39 A Research Director The WWSOC thinks that IDAG alone cannot accomplish the executive tasks which are needed to make this process active and viable (in particular keeping active the R&D ‘horizontal’ effort during the EDR phase) We therefore need a Research Director for detectors to provide the necessary managerial tasks Ideally one would need this RD to be nominated early enough by ILCSC to initiate the LOI procedure in collaboration with the IDAG but time seems too short Financial support needs to be provided for the RD An ‘umbrella organization’ defined by ILCSC is needed ASAP to coordinate the detector and machine activities until a world lab is constituted

11-July-07 FALC - Rome Global Design Effort 40 Achieving our ILC Timeline “The other issues” We need to begin a campaign to prepare the way for submitting a winning proposal in about –Science Motivation is very strong, but we need LHC results for validation (~2010) –Must convince broader HEP and science communities on the ILC –Must engage the global governments to take ownership and develop international governance –Must develop a siting strategy The key to maintaining our timeline will be working these issues in parallel with developing an engineering design and completing the R&D

11-July-07 FALC - Rome Global Design Effort 41 Endorsement from FALC? To promote for the ILC specifically, the coordination of resources and the conduct of an R&D program for the engineering design phase. To note that the ILC-GDE will directly negotiate with the laboratories and universities, for the tasks, roles and responsibilities of that institution in connection with the ILC work, subject to available funding. These agreements would be memorialized in MOUs between the ILC-GDE and the participating laboratories and universities. To work towards an appropriate organizational structure for the governance of the engineering design phase, a single oversight Council. In the interim agree to continue the central coordinating role of the ILCSC as established by ICFA.