DN Operation Iain Ward DNCC Manager. Responsibilities  Licence Holder  Obligation For 1 In 20 Capacity  DNCC Operates Networks Under Direction of The.

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Trades and Transfers Activity to Date. 2 Introduction  Trade and Transfer functionality added to RMSEC auction (renamed RMTTSEC) from July, applying.
Accuracy of CV determination systems for calculation of FWACV Dave Lander.
Discretionary Release Interruptible Entry Capacity 1st November 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
National Grid: Gas Transmission System Operator
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
NEC & EMERGENCY ARRANGEMENTS Paul Green 2 nd June 2005 NGT Emergency Planning.
Linepack ‘Park and Loan’ Quantity - Influencing Factors Review Group 291 – July 2010.
Exit Reform Review Transmission Workstream 07 January 2010.
Offtake Metering Errors Stephen Skipp Asset Manager (Transmission and Storage)
NTS Update Gas Customer Forum 25 th September 2006.
Network Analysis - Introduction Transmission Planning Code Workshop 2 1 st May 2008.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Gas Customer Forum Transmission Update Chris Logue 9 th July 2007.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
Accuracy of CV determination systems for calculation of FWACV Dave Lander Update 12 th October 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Consultation on disposal of part of NTS for CCS 11 May 2009 Bogdan Kowalewicz.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Offtake Arrangements Document – An Overview Paul Roberts 12 th May 2005.
Information provision for winter 09/10 Jenny Phillips – GNCC Strategy & Support Manager.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Lessons from developments in the past ten years – GB experience Alison Kay – National Grid, Transmission Commercial Director.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
A National Grid Fit For The Future Chris J Murray. Newton Institute - 26 th May 2010.
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
A GAS FLOW MODEL FOR THE NTS NETWORK MELVIN BROWN CLAUDIA CENTAZZO JOGT Meeting, London, 5 June 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Flow Flexibility Capacity Joint Office 7 th December 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Metering Standards and Impact on Shrinkage Issue for Consideration 1 October 2009 for Gas Transmission Workstream.
Ofgem Information Request on availability of NTS Exit Flexibility Capacity Ritchard Hewitt Gas Code Development Manager National Grid Transmission 7 th.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review Group -140 Thoughts on additional information requirements.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
EU Phase 2 Delivery & UK Link Programme; Impacts on Gemini Process European Workgroup 1 st May 2014.
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
System information provision
MIPI Energy – Daily Reports
2 hour / 5% Rule Bethan Winter.
Publication of Zonal Flex Data
DN OAD Processes: RG 0316 : Offtake Workstream
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Review of Trade and Transfer Winter 09/10
Stefan Leedham Transmission Workstream 2nd November 2006
Proposed Changes to UNC Section Q Emergencies - Mod 035
Presentation transcript:

DN Operation Iain Ward DNCC Manager

Responsibilities  Licence Holder  Obligation For 1 In 20 Capacity  DNCC Operates Networks Under Direction of The DN  Winter / Summer Operating Strategy  Booked Capacities  Short Term Variations  DN Specific Issues  DNCC Makes Within-Day Decisions Regarding  Supply Demand Balancing  Control of Unbilled Energy  Plant Outage  Planned  Unplanned (faults)

Daily Operations – Key Stages  Forecast Demand  Define Diurnal Profile  Programme Intakes  Manage Demand Changes  Respond to NTS Change Requests

Manage LDZ Take, Demand and Stock

Forecast Demand  LDZ Level  Weather Data (NDM)  VLDMC OPNs (DM)  Approx 5% Demand Change per 1 deg C

Demands and Temperature Relationship

Define Diurnal Profile  Diurnal Swing in the Range 12 – 15%  Significance of Minimum Stock Time  Storage Deficit in most DNs  Storage Utilisation in Defined Order  DN Linepack  DN LP Storage  DN Bullets  NTS Flow Variation

Diurnal Profiles Supply Rate Demand Profile B C AA Storage Requirement A + B - C Empty Holders & Linepack, Fill Holders & Linepack

Manage LDZ Take, Demand and Stock

Programme Intakes  Remote Control of Offtake Utilisation  Notifications to NTS via OPN Process  Day Ahead and Within Day Considerations  Meet Sub-LDZ Flow Requirements  Pressure vs Volumetric Control  Shrinkage Considerations  Plant Outage  Reflective of OCS Where Possible  Request Additional Flow Flex via OPN Where Necessary

Theddlethorpe Gas ( MJ - m3) Bacton Gas ( MJ/m3) St Fergus / Teesside Gas ( MJ/m3) St Fergus Gas ( MJ/m3) Easington/ Rough Gas ( MJ/m3) St Fergus / Barrow Gas ( MJ/m3) CV Management

Manage Demand Changes  Forecast Updated 8 Times Daily (UNC timings) plus up to 5 ad-hoc.  Respond to Revised Weather Data  Xmas period 2005; 5 degree error within day.  Rebalance DN Supply to Meet Demand Changes  Revised Offtake Rates  Impact on storage requirement  Allocation to Volumetric Offtakes; balance effect of pressure control?

Respond to NTS Change Requests  NTS To Anticipate Supply Rate Changes, Commercially and Physically Driven  NTS Outages  Planned e.g. On-Line Inspection  Un-Planned e.g. Faults  NTS VLDMC renominations

DNCC Offtake Performance  Booked Flat Capacity Limits Observed at DN Level  Booked Flow Flex Limits Exceeded at LDZ Level  Some Offtakes on Some Days  Pressure Controlled Flows Defined by Consumers  Within-day demand changes flow through into FlowFlex calculation.

LDZ 1

LDZ 2