FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.

Slides:



Advertisements
Similar presentations
Rest Rooms Concessions Rest Rooms Concessions CAUTION TAPE Block sidewalk for safety of bands and spectators. BACK GATE Band Entrance Coordinate and Check.
Advertisements

Sharing the Road with Large Trucks
Surface Sr. Design Week 7. What You Should Have Distances to Mill and Leach as a Function of Depth Cycle Time Calculations for Proposed Truck Fleets.
Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also.
Sequencing Mining Operations with MineSight® ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Picking a Suitable Truck © Dr. B. C. Paul 2000 Revised 2009 Hi!
How to Set Up a Processing Plan in MSOPIT’s Economics Panel.
Production Capacity of Truck and Loader Teams ©Dr. B. C. Paul 2003.
Front End Loader Costs ©Dr. B. C. Paul 2000 Start Detailed Economic Comparison of 3 machines l Strategy Go Through Each Machine and Figure the Cost Compare.
Senior Design – Week Projects. A General Comment Team leaders need to get me team member assignments.
Handling Solution in a Heap Leach ©2009 Dr. B. C. Paul.
McGill Consulting Asif Kan Alexandre Marinho de Almeida Michael Spleit Ahmed Ragab Mine Production Scheduling of a Porphyry copper deposit February 15,
TRUCKS THE MOST COMMON HAULING EQUIPMENT USED FOR MILITARY CONSTRUCTION SITE ARE 2 1/2, 5, AND 20 TON DUMP TRUCKS. THE HAUL CAPACITY CAN BE EXPRESSED.
Classic Open Pit Mining
Roads in MineSight.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
Drinks Bottle Using CREO DEVELOPMENT
An Introduction to MS Reserve
Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected.
Tire Heating – The TMPH Rating ©Dr. B. C. Paul 2000 revised 2008 Note- These slides demonstrate the use of the FPC computer program developed by the Caterpillar.
Adjusting a Mine Cost Service Model. A Note About MSOPIT Compatibility Mine Cost Service Expressed Mining Costs as Costs Per tonne of Ore Mined MSOPIT.
2008 Sr. Design Project ©Jan 2008 Dr. B. C. Paul Plans were made by the Author. MineSight® is proprietary software of Mintec Inc., Maps are taken from.
Checking for Traction Problems ©Dr. B. C. Paul 2000 revised 2008 Note – The methods outlined here are common practice in industry and can be found in.
Stiffness Ratio Stiffness Ratio = B H / B where B H is Bench Height B is the Burden Target Stiffness Ratios 3 to 4 is normal range > 4 does not improve.
Loading Considerations © 2000 Dr. B. C. Paul revisions 2009 Note These slides include screen shots from the Caterpillar Performance Manual Edition 29.
GPS Surveying ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides may.
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
Adding Roads and Benches To A Pit Design ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Checking for Tire Heating ©2009 Dr B C Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
Entering My Haul Road Profile ©2009 Dr. B. C. Paul Note- This presentation draws on previous notes developed as early as 2000 and contains numerous screen.
Sequencing Mining Operations with MineSight®
Post Break Week 2. Comments for Consideration of Coal Miners One issue you have created is extreme variability in your coal tonnage – This will impact.
Getting Cycle Times ©2009 Dr. B C Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the program.
Week 3 Sr. Design. Important Things we Know You will be doing heavy haulage by Barge on the Yukon River for $5 per tonne to Nennana – There will be no.
Obtaining Information From the Geologic Block Model
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
Interpreting VALP Results © 2012 Dr. B. C. Paul Note – MineSight and VALP are both trademarked names belonging to Mintec Inc. These slides suggest ways.
Compositing Assays To The Chosen Bench Height ©2007 Dr. B.C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
12 Quarry Operations ©2010 Dr. B. C. Paul Note – The slides contain many ideas about quarry design that are considered by the author to be common knowledge.
Matching Shovels ©Dr. B. C. Paul 2000 revised 2008 Note – Matching procedures depicted in these slides are widely understood among those schooled in the.
Designing Basic Blasting Shots Part I ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
Week 8. COAL Timing Will Be Big Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year by.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
Next Part of Step II Determining Peak Speed ©Dr. B. C. Paul 2000 revised 2008 Note – The methods outlined here are typical of widely known published engineering.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
RIGHT TURNS A step by step guide intended to support the practical training. Select Slide Show from the top Toolbar then From Beginning. Let it run until.
Degraded Image: Valentine’s Gift By Gabrielle Turgeon.
Cable Shovel Costs ©Dr. B. C. Paul 2000 Do the Cable Shovel l Have a 12 yard P+H Examine Cable Shovel Cycle Time Chart Predicted 26 seconds.
Where is my Dozer ? This is what happens when things get lost and they turn up in the most unexpected places.
Sight Words.
Week 10 ©2012 Dr B C Paul. Copper Your initial road moves have been questioned. –You have drawings showing the end of each stage –Between two of your.
Entering Our Choices into FPC ©2009 Dr B C Paul Note – This slide series contains screen shots of the computer program FPC developed by Caterpillar Equipment.
+ This step by step tutorial demonstrates drawing a keyboard illustration using rectangles, grids, move and transform effects.
True Open Pits ©Summer 2003 Dr. B. C. Paul. Telling a True Open Pit Strip mines advance across the deposit backfilling pits with new overburden as they.
Types of Loaders ©Dr. B. C. Paul 2000 Loading Equipment l Four Basic Types of Loaders Cable Shovel Hydraulic Front Shovel (also called hydraulic excavator)
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Created By Sherri Desseau Click to begin TACOMA SCREENING INSTRUMENT FIRST GRADE.
Checking On Production ©2009 Dr. B. C. Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
Ultimate Earth Mover This is the largest earth mover
Where is my Dozer ? This is what happens when things get lost and they turn up in the most unexpected places.
TRUCKS & HAULING EQUIPMENT
Where is my Dozer ? This is what happens when things get lost and they turn up in the most unexpected places.
Lecture 7 Excavators TSP-308 MPK Ferdinand Fassa.
Seeing Words.
Seeing Words.
MUHAMMAD WAJAHAT AMIN (INTERNEE, MINE PLANNING) OPEN PIT MINING TOPICS.
I believe the reason students have difficulty learning algebra and that most people have trouble doing math word problems is that although children are.
Where is my Dozer ? This is what happens when things get lost and they turn up in the most unexpected places.
Presentation transcript:

FPC Assignment 1

Go to Your Project and Fire-Up MSOPIT

Go Directly to Design Strategy Pick your resource option and run

Size Your Pit Reserves from the Report I can see all my ore Is sulfide I can see I have 432,517,319 tonnes ore 386,365,687 tonnes waste

Setting Production Rate Back half of room – you will mine your tonnage over 40 years Front half of room – you will mine your tonnage over 25 years Create and Word Document – Calculate out your annual ore and waste tonnages – Put the results in your word document Assume even ore and waste tonnage each year – Your mill is a 1 mile drive over level once you leave the mine – Your leach is 1.5 mile at +2.5% grade uphill – Your dump is 2.5 miles at +1.5% grade uphill

Climate Right half the room – You are near Fairbanks Alaska Left half the room – You are near Mexico City

Decision Time Determine how many days per year you can run – Write this in a word document and tell me why Determine how many shifts per day you will run and how long the shifts will be – Write your results in a word document Determine how many hours you will plan on – Then assume that you will only be able to utilize 93% of those hours due to pit delays – Write your results for number of hours per year.

Keep on Truckin Determine your width of road and the turn radius of your sharpest turn. – Hint – click a point hold down right mouse key and drag for distance Look at trucks – Need absolute min 2.5 times truck width – 3 times desirable Suppose your road is 30 meters wide (about 98 feet) – Maximum truck width about 33 feet – Check turn radius too. Which Cat trucks are feasible to use?

Consider Your Loader Your benches are 15 meters high Your loader must have a 15 meter dig height Which loaders are feasible to use?

Narrow Your Truck Field Identify 3 possible trucks that might work – You may want to consider Trucks of 250 tons or better require special haul roads To many little trucks could be a nightmare number running around To few of loading points will cause mill headgrade problems (think at least 3 load points) – For porphyry copper ore determine whether the trucks are weight or volume limited

Look Again at Your Loaders Assume medium dig for a hydraulic shovel, hard for a cable – What kind of fill factors can you get on your bucket or dipper. Match your 3 trucks with loaders – Make sure your loader can get over the side of your truck – Calculate the number of passes and fill factors you will need to load your truck

Get Your 3 possible Equipment Sets Have it ready to turn in on Thursday.