Jan 21/22, 2009PACS PV Review Photometer Spatial Cal1 PACS Photometer Spatial Calibration PVPhotSpatial D.Lutz PACS PV Review Jan 21/22 2009, MPE.

Slides:



Advertisements
Similar presentations
The PACS Status Herschel PV Mid-Term Review ESAC, September 1, Herschel Performance Verification Mid-Term Review PACS Status: Overview Markus Nielbock.
Advertisements

Bruno Altieri Jan # 1 Pointing calibration plan Bruno Altieri (HSC) PACS PV phase.
Bruno Altieri September # 1 PACS photometer pipeline overview Bruno Altieri (ESA/HSC)
PACS CoP & PV Review 21/22 Jan 2009 PVSpecWave1 Spectrometer Wavelength Calibration XHSPOT Proposal: PVSpecWave H. Feuchtgruber.
PACS SOVT-2 (SIMS) and CAPs development MPIA PACS ICC Meeting #32 1 st – 3 rd April 2009, MPE Garching Markus Nielbock (MPIA)
- page 1 July NHSC Mini-workshop PACS NASA Herschel Science Center PACS Photometer AORs How to Prepare an Observation with HSpot: 2 Science Use.
Beating Noise Observational Techniques ASTR 3010 Lecture 11 Textbook.
Sky Coordinate Image Specs Fully processed: –Merged –10-min cadence –“sky to sky” interpolation –Gaussian temporal filter –Renormalized such that time.
Molecular Gas and Dust in SMGs in COSMOS Left panel is the COSMOS field with overlays of single-dish mm surveys. Right panel is a 0.3 sq degree map at.
15 October Observational Astronomy Direct imaging Photometry Kitchin pp ,
PACS Page 1 NHSC Data Processing Workshop – Pasadena Sept 10-14, 2012 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
PACS FM-ILT SPECTROMETER SPATIAL CALIBRATION A. Contursi (H. Feuchtgruber) PACS Science Verification Review – 8/9 November 2007 MPE-Garching.
Which dipoles to use to optimize survey speed? –What tapering? –Trade-off between sensitivity, FOV and low side-lobe levels –Station beam stability, pointing.
FM-ILT Results: Mechanisms FM1 Chopper and Calibration Sources Markus Nielbock (MPIA) Babar Ali (IPAC) Jeroen Bouwman (MPIA) Helmut Dannerbauer (MPIA)
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SOVT-2 and CAPs development MPIA PACS ICC Meeting #31 12 th – 13 th January 2009, Vienna (A) Markus Nielbock (MPIA)
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The SPIRE Photometer and its Observing Modes Bernhard Schulz (NHSC/IPAC)
High Precision Astrometry and Parallax from Spatial Scanning Part 2 Adam Riess and Stefano Casertano.
A look at XMM slew data Richard Saxton, Andrew Read, Michael Freyberg, Bruno Altieri, Puri Munuera.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 SPIRE AOTs, Products and Quick Look Tools Bernhard Schulz NHSC/IPAC on behalf of the.
PACS Spectrometer Spatial Calibration plan in PV phase A.Contursi D. Lutz and U. Klaas.
December 9, 2014Computer Vision Lecture 23: Motion Analysis 1 Now we will talk about… Motion Analysis.
Atmospheric Aerosol Measurements at the Pierre Auger Observatory The Pierre Auger Observatory operates an array of monitoring devices to record the atmospheric.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 Roberta Paladini NHSC/IPAC Photometry Guidelines for PACS data.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The PACS Photometer: Overview and Products Roberta Paladini NHSC/IPAC.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-402 (for Hipe 12.0) Level 1 to Level 2 processing: The JScanam pipeline Prepared.
Data Analysis Software Development Hisanori Furusawa ADC, NAOJ For HSC analysis software team 1.
Mário Santos1 EoR / 21cm simulations 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Epoch of Reionization / 21cm simulations Mário Santos CENTRA - IST.
Optimisation of the PACS Chopper Markus Nielbock Ulrich Klaas Jeroen Bouwman Helmut Dannerbauer Jürgen Schreiber Ulrich Grözinger.
Spectroscopy with PACS M82 PACS line imaging from the SHINING team (Contursi et al First Results workshop talk) Phil Appleton and Dario Fadda for.
PACS SVR 22/23 June 2006 Scientific/Performance Requirements1 PACS Science and Performance Requirements A. Poglitsch.
PACS page 1 NHSC Open Time Cycle 1 Observation Planning Workshop 3 rd - 4 th Jun 2010 – Bernhard Schulz SPIRE Overview Bernhard Schulz, Nanyao Lu, Kevin.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The PACS Spectrometer: Overview and Products Roberta Paladini NHSC/IPAC.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 NASA Herschel Science Center - page 1 PAC S prepared by Nicolas BILLOT
PACS ICC Readiness Review MPE, July 3/ PACS Photometer PV Phase Plan 1 Status Report M. Nielbock: PACS PHOT PV Phase Plan Markus Nielbock (MPIA)
CEA DSM Dapnia SAp Flux calibration of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/Sap.
Overview, Spectrometer Products and Processing Philosophy Phil Appleton on Behalf of PACS Team PACS IFU Spectrometer.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
11-Jun-04 1 Joseph Hora & the IRAC instrument team Harvard-Smithsonian Center for Astrophysics The Infrared Array Camera (IRAC) on the Spitzer Space Telescope.
PACS Page 1 NHSC Data Processing Workshop – Pasadena Aug 26-30, 2013 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-402 (for Hipe 13.0) Level 1 to Level 2.5 processing: The JScanam pipeline Prepared.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
- page 1 July NHSC Mini-workshop PACS NASA Herschel Science Center PACS Spectrometer AORs Phil Appleton 1Roberta Paladini.
New SPIRE features in HIPE 9.1 NHSC; Nov 28, 2012 PACS Page 1 What’s New in HIPE 9.1 ( SPIRE FTS) Nanyao Lu NHSC/IPAC (on behalf of the SPIRE ICC)
Bruno Altieri Jan # 1 Parallel mode Bruno Altieri (HSC) PACS PV phase review MPE,
1 James N. Bellinger Robert Handler University of Wisconsin-Madison 11-Monday-2009 Laser fan non-linearity James N. Bellinger 20-March-2009.
- page 1 PACS Phil Appleton on behalf of the NHSC/HSC and the PACS ICC ; especially Bart Vandenbussche and Pierre Royer (KUL Belgium) Instrument Performance.
A. Ealet Berkeley, december Spectrograph calibration Determination of specifications Calibration strategy Note in
Markus Nielbock (MPIA) – Herschel Pointing PACS ICC Meeting #38 Herschel Pointing Summary and Recent Developments Markus Nielbock (MPIA Heidelberg) with.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th – 10 th Oct 2014 Overview of SPIRE Photometer Data Reduction Pipeline Kevin Xu NHSC/IPAC.
Markus Nielbock (MPIA) – PACS Photometer Flux Calibration Herschel Calibration Workshop PACS Photometer Flux Calibration: Update Markus Nielbock (MPIA.
Markus Nielbock (MPIA) – PACS Calibration Status Report Herschel Calibration Steering Group Meeting #24 PACS Calibration Status Report Markus Nielbock.
Markus Nielbock (MPIA) – PACS Photometer Flux Calibration EPOS Meeting PACS Photometer Flux Calibration Current Plans Markus Nielbock MPIA, 22 th February.
Herschel Calibration Workshop
photometry and spectroscopy with PACS
NHSC/PACS Web Tutorials
PACS Calibration Status Report
PACS / SPIRE cross-calibration on prime fidicial standard stars
PACS ICC Meeting #41 PACS Photometer
Chris Willott, Loic Albert, René Doyon, and the FGS/NIRISS Team
The Medium Resolution Spectrometer on behalf of the MRS team
Markus Nielbock (MPIA Heidelberg)
Observational Astronomy
Apex scanning strategy & map-making
Presentation transcript:

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal1 PACS Photometer Spatial Calibration PVPhotSpatial D.Lutz PACS PV Review Jan 21/ , MPE

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal2 PCD 2.6.2: Telescope RPE Goal: measure the short term variations around the intended stable pointing Matter of taste whether to place here or under pointing calibration/FPG, was simply implemented here in order to not forget after the procedure was available… Method: Nonstandard AOR doing a chopped/nodded observation but with longer than usual nod period, to avoid the uncertainties associated with repositioning the telescope 2 sources: non-SSO (Alf Boo) and SSO (asteroid) Total time: ~1h

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal3 PCD 3.1.1: Central Pointing Position Now part of pointing calibration, see presentation by Bruno Altieri CAP prototype exists

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal4 PCD 3.1.2: Relation between chopper position and angular Displacement on sky As directly as possible and suppressing telescope repositioning uncertainties compare a known distance on sky with chopper throw [and direction] - important for AOTs! Use double sources with known separation. Not trivial to find, but using a combo of star pairs, galaxy pairs and asteroid conjunctions overall satisfactory – 13 cases with useful brightness, separation and PA found in PV exercise Baseline procedure: Triple chop using nonstandard AOR: 13 pairs, takes ~1h total Fall back procedure: Chop/nod with tailored throw using nonstandard AOR: Tested on 2 pairs ~0.2h total Nonstandard procedures were part of SOVT2, validation started

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal5 PCD 3.1.3: Photometer FOV distortion What we would like to do but would need better and faster pointing: Note: These PACS+testoptics results have been transferred to PACS+Herschel using N.Geis’ modelling

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal6 SIMULATED pointing from testing a procedure in SOVT2 OD63

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal Method A: narrowly spaced scanmaps across bright source Source should be very bright for good S/N in 1/10 of a sec, a little fluff or non-point like nature ok as long a core is symmetric. Baseline PV: Mira 7 chopper positions, 2 orientations, cover full array at 4” cross-scan step slow scan Standard AOR + nonstandard AOR (latter for non-optical zero chopper positions ~15h total

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal Method B: Staring raster on bright source Sloooow due to pointing overheads and minimum OBCP duration but still an important crosscheck to scanmap results Only one staring raster (nonstandard AOR) 3.5”*7” pitch at optical zero, which is the chopper position used for all the scanmap AORs Source: Mira Total duration: 6.5h!

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal Method C: Differential checks by observing a field with a priori unknown but clear structure, placing the same structure in different regions of the array and using different chop throws. Test with two suitable galaxy pairs, two chop throws, raster to move sources further (nonstandard AOR) Total duration: 7h

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal Photometer PSF Because of expected noticeable color effects, include a star (blue SED, e.g. Alf boo), Blazar (red SED, faint, e.g. 3C345), Asteroid (bright, blue, SSO), do for both blue and green filter Method A: non-standard chopped/nodded AOR moving source to the centers of all 8 blue matrices, blue+green filter, total ~7h Method B: default point source AOR as reference, total ~0.5h

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal : Finely sampled PSFs For blue/green/red filter and for a star and a blazar, do more finely sample rasters (5*5 at 1.25pixel step) around chop/nod Method C, nonstandard AOR Note: Pointing quality is again an issue, but may be reconstructable from data Total duration: ~8h

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal : PSF in scanmaps Method D: Scan over Alf Boo and 3C345 with scanmaps at all three speeds and in blue+green filter Modest scan map with 15 legs spaced 3” to improve sampling, default AOR Total duration: ~4h Note: parallel mode is implicitly covered as long as current averaging scheme is kept

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal13 Support spectrometer PSF Non-SSO sources that are bright enough for spec PSF are not strict point sources Take a quick small source photometer AOR on each source scheduled for spec PSF to look for structure, accepting that core may/will be saturated ~0.3h/source Source list recheck TBD

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal14 PCD Ghosts Method A: To re-measure the ‘blue streaks’ seen in ILT, do a 5’*5’ scanmap with 4” cross-scan step on a very bright source (Mira) Blue at 3 chopper positions, green at 1, standard and nonstandard AOR Total duration ~4h Method B: Blind search for new phenomena using 20’ scanmap with 6” cross-scan step Covers ~ “Herschel FOV” Source needs to be very bright, Uranus if available, N3256 otherwise Total duration ~4h

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal15 PCD Straylight 2deg*2deg ‘homogeneous coverage’ fast scanmap, default AOR Source: Uranus if available (could remeasure at different epoch if in doubt about nature of an effect), Mira otherwise Total duration: ~2h Not covered at this point: Straylight at very large angles due to tripod reflex. There are useful measurement methods if a good prediction can be made by straylight WG

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal16 PCD 3.1.7: Background structure Measure background structure and straylight between open FOV and calibration sources by doing chopper scans over full range while telescope is staring Different calibration source and sky flux levels help in disentangling effects Total duration: ~3h

Jan 21/22, 2009PACS PV Review Photometer Spatial Cal17 Keep an eye on validation of non-standard AORs from SOVT2 – quicklook is encouraging Signs - with two dimensions an even number of sign errors may not cancel ;-) Software stability/efficiency