Dr. M. Fouzul Kabir Khan Professor of Economics and Finance North South University Lecture 5: Project Appraisal Under Uncertainty.

Slides:



Advertisements
Similar presentations
Lecture-1 Financial Decision Making and the Law of one Price
Advertisements

Chap 3 Net Present Value.  Net present value is the single most widely used tool for large investments made by corporations.  Klammer reported a survey.
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
Study Unit 10 Investment Decisions. SU – The Capital Budgeting Process Definition – Planning and controlling investment for long-term projects.
CHAPTER 14 Real Options.
Lecture 8 - Capital Budgeting: Estimating Cash Flows and Analyzing Risk.
CORPORATE FINANCIAL THEORY Lecture 3. Interest Rate Cash Flow Interest Rate and Cash Flow - REALITY Is not guaranteed Has many different sources.
1 Risk, Return, and Capital Budgeting Chapter 12.
WEMBA 2000Real Options26 Introducing Real Options What are Real Options? Expansion Options: Starsoft Inc. is considering expanding its internet software.
Real Options The Right to do Something Real. Introduction The classical DCF valuation method involves a comparison between the cost of an investment project.
CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Identifying embedded options Valuing real options in projects.
Copyright © 2001 by Harcourt, Inc.All rights reserved. CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Evaluating.
Real Options and Other Topics in Capital Budgeting
Ch 9 Learning Goals 3. The importance of risk in capital budgeting.
4. Project Investment Decision-Making
Capital Budgeting & Risk Invest in highest NPV project Need Discount rate to get NPV.
Chapter Outline The Cost of Capital: Introduction The Cost of Equity
1 Capital Budgeting Overview  Capital Budgeting is the set of valuation techniques for real asset investment decisions.  Capital Budgeting Steps estimating.
INFLATION AND CAPITAL BUDGETING INFLATION IS THE INCREASE IN THE GENERAL LEVEL OF PRICES FOR ALL GOODS AND SERVICES IN AN ECONOMY.
Cost of Capital.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Cost of Capital Chapter Fourteen.
1 Copyright 1996 by The McGraw-Hill Companies, Inc WHAT DISCOUNT RATE SHOULD THE FIRM USE IN CAPITAL BUDGETING?  MANY FIRMS USE OVERALL FIRM COST OF CAPITAL.
Copyright © 2003 Pearson Education, Inc. Slide 5-0 Chapter 5 Risk and Return.
FDM11 Capital investment apprasal 3 Capital investment appraisal 3.
Capital Budgeting Under Uncertainty
Valuation and levered Betas
Why Cost of Capital Is Important
Chapter 14 Risk and Uncertainty Managerial Economics: Economic Tools for Today’s Decision Makers, 4/e By Paul Keat and Philip Young.
Weighted Average Cost of Capital
Cost of Capital Presented by: Coteng, Walter Malapitan, Jhe-anne Pagulayan, Jemaima Valdez, Jenya Dan.
Discounted Cash Flow (DCF) Analysis Tutorial This presentation is to be used ONLY as a template for DCF Analysis presentations. In no way should it reflect.
Copyright © 2003 Pearson Education, Inc. Slide 5-1 Chapter 5 Risk and Return.
Chapter 12 Capital Budgeting and Risk
Cost of Capital MF 807 Corporate Finance Professor Thomas Chemmanur.
Cost of Capital Chapter 14. Key Concepts and Skills Know how to determine a firm’s cost of equity capital Know how to determine a firm’s cost of debt.
Chapter 12 The Cost of Capital Topics  Thinking through Frankenstein Co.’s cost of capital  Weighted Average Cost of Capital: WACC  Measuring Capital.
CHAPTER 13 Option Pricing with Applications to Real Options
MINICASE.
Lecture 10 The Capital Asset Pricing Model Expectation, variance, standard error (deviation), covariance, and correlation of returns may be based on.
Real Option Valuation Marking to Market Prof. Luiz Brandão 2009.
12-1 Capital Budgeting and Financial Planning LECTURE 22 Course Instructor: M. Jibran Sheikh.
© Prentice Hall, Corporate Financial Management 3e Emery Finnerty Stowe Cost of Capital.
Chapter 3 Arbitrage and Financial Decision Making
1 Capital Budgeting Overview  Capital Budgeting is the set of valuation techniques for real asset investment decisions.  Capital Budgeting Steps estimating.
1 Ch 7: Project Analysis Under Risk Incorporating Risk Into Project Analysis Through Adjustments To The Discount Rate, and By The Certainty Equivalent.
A Cursory Introduction to Real Options Andrew Brown 5/2/02.
Chap 4 Comparing Net Present Value, Decision Trees, and Real Options.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part.
13-1 CHAPTER 13 Real Options and Other Topics in Capital Budgeting Identifying embedded options Valuing real options in projects Evaluating projects with.
1 Fin650:Project Appraisal Lecture 5 Project Appraisal Under Uncertainty and Appraising Projects with Real Options.
Capital Budgeting and Financial Planning Course Instructor: M.Jibran Sheikh.
CAPITAL BUDGETING &FINANCIAL PLANNING. d. Now suppose this project has an investment timing option, since it can be delayed for a year. The cost will.
Contemporary Engineering Economics
1 Real Options Ch 13 Fin The traditional NPV rule is a passive approach because … The traditional NPV approach assumes  mangers do not have influence.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Cost of Capital.
Chapter 14 Cost of Capital McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
1 CHAPTER 12 Real Options Real options Decision trees Application of financial options to real options.
1 Ch 7: Project Analysis Under Risk Incorporating Risk Into Project Analysis Through Adjustments To The Discount Rate, and By The Certainty Equivalent.
MTH 105. FINANCIAL MARKETS What is a Financial market: - A financial market is a mechanism that allows people to trade financial security. Transactions.
Copyright © 2002 South-Western Financial options Black-Scholes Option Pricing Model Real options Decision trees Application of financial options.
1 Other Topics in Capital Budgeting Evaluating projects with unequal lives Evaluating projects with embedded options Valuing real options in projects.
Part Three: Information for decision-making Chapter Fourteen: Capital investment decisions: the impact of capital rationing, taxation, inflation and risk.
Chapter 9 Principles of Corporate Finance Eighth Edition Capital Budgeting and Risk Slides by Matthew Will, adopted by Craig Mayberry Copyright © 2006.
Chapter 13 Learning Objectives
Capital Budgeting Decisions
Copyright © 2014 by Nelson Education Ltd.
Real Options Konstantinos Drakos, Macrofinance, Real Options.
CHAPTER 14 Real Options.
Introducing Real Options
CHAPTER 12 Other Topics in Capital Budgeting
Presentation transcript:

Dr. M. Fouzul Kabir Khan Professor of Economics and Finance North South University Lecture 5: Project Appraisal Under Uncertainty

Critique of DCF 1. Project analysis under risk: Using a risk-adjusted discount rate The certainty equivalent method Real options in capital projects 2

3  It is impossible to say for certain what the future holds; therefore, CBA must include some provision for uncertainty.  Contingencies and their probabilities Modeling uncertainty as risks begins with the specification of a set of contingencies that are exhaustive and mutually exclusive.  A graphical illustration Probabilities may be based solely on historically on observed frequencies, on subjective assessment by clients, analysts, or other experts.

4

Incorporating risk into project analysis through adjustments to the discount rate, and by the certainty equivalent factor. 5

● Risk is the variation of future expectations around an expected value. ● Risk is measured as the range of variation around an expected value. ● Risk and uncertainty are interchangeable words. 6

In project analysis, risk is the variation in predicted future cash flows. 7

There are several approaches to handling risk: Risk may be accounted for by (1) applying a discount rate commensurate with the riskiness of the cash flows, and (2), by using a certainty equivalent factor Risk may be accounted for by evaluating the project using sensitivity and breakeven analysis. Risk may be accounted for by evaluating the project under simulated cash flow and discount rate scenarios. 8

The structure of the cash flow discounting mechanism for risk is:-  The $ amount used for a ‘risky cash flow’ is the expected dollar value for that time period.  A ‘risk adjusted rate’ is a discount rate calculated to include a risk premium. This rate is known as the RADR, the Risk Adjusted Discount Rate. 9

Conceptually, a risk adjusted discount rate, k, has three components:- 1. A risk-free rate (r), to account for the time value of money 2. An average risk premium (u), to account for the firm’s business risk 3. An additional risk factor (a), with a positive, zero, or negative value, to account for the risk differential between the project’s risk and the firms’ business risk. 10

A risky discount rate is conceptually defined as: k = r + u + a Unfortunately, k, is not easy to estimate. Two approaches to this problem are: 1. Use the firm’s overall Weighted Average Cost of Capital, after tax, as k. The WACC is the overall rate of return required to satisfy all suppliers of capital. 2. A rate estimating (r + u) is obtained from the Capital Asset Pricing Model, and then a is added. 11

Assume a firm has a capital structure of: 50% common stock, 10% preferred stock, 40% long term debt. Rates of return required by the holders of each are : common, 10%; preferred, 8%; pre-tax debt, 7%. The firm’s income tax rate is 30%. WACC = (0.5 x 0.10) + (0.10 x 0.08) + (0.40 x (0.07x (1-0.30))) = 7.76% pa, after tax. 12

This model establishes the covariance between market returns and returns on a single security. The covariance measure can be used to establish the risky rate of return, r, for a particular security, given expected market returns and the expected risk free rate. 13

The equation to calculate r, for a security with a calculated Beta is:  Where : is the required rate of return being calculated, is the risk free rate: is the Beta of the security, and is the expected return on the market. 14

15

The value of Beta can be estimated as the regression coefficient of a simple regression model. The regression coefficient ‘a’ represents the intercept on the y-axis, and ‘b’ represents Beta, the slope of the regression line. Where, = rate of return on individual firm i’s shares at time t = rate of return on market portfolio at time t = random error term (as defined in regression analysis) u it 16

The Certainty Equivalent method adjusts the cash flows for risk, and then discounts these ‘certain’ cash flows at the risk free rate. Where: b is the ‘certainty coefficient’ (established by management, and is between 0 and 1); and r is the risk free rate. 17

Risk is the variation in future cash flows around a central expected value. Risk can be accounted for by adjusting the NPV calculation discount rate: there are two methods – either the WACC, or the CAPM Risk can also be accommodated via the Certainty Equivalent Method. All methods require management judgment and experience. 18

Critics of the DCF criteria argue that cash flow analysis fails to account for flexibility in business decisions. Real option models are more focused on describing uncertainty and in particular the managerial flexibility inherent in many investments Real options give the firm the opportunity but not the obligation to take certain action 19

Application of financial options theory to investment in a non-financial (real) asset Hence the name real options 20

 Financial options have an underlying asset that is traded--usually a security like a stock.  A real option has an underlying asset that is not a security--for example a project or a growth opportunity, and it isn’t traded. (More…) 21

It does not obligate its owner to take any action. It merely gives the owner the right to buy or sell an asset. 22

 Ten real options to: ◦ Invest in a future capital project ◦ Delay investing in a project ◦ Choose the project’s initial capacity ◦ Expand capacity of the project subsequent to the original investment ◦ Change the project’s technology ◦ Change the use of project during its life ◦ Shutdown the project with the intention of restarting it later ◦ Abandon or sell the project ◦ Extend the life of the project ◦ Invest in further projects contingent on investment in the initial project 23

Real options exist when managers can influence the size and risk of a project’s cash flows by taking different actions during the project’s life in response to changing market conditions. Alert managers always look for real options in projects. Smarter managers try to create real options. 24

The payoffs for financial options are specified in the contract. Real options are “found” or created inside of projects. Their payoffs can be varied. 25

Investment timing options Growth options ◦ Expansion of existing product line ◦ New products ◦ New geographic markets 26

 Abandonment options ◦ Contraction ◦ Temporary suspension  Flexibility options 27

1. DCF analysis of expected cash flows, ignoring the option. 2.Qualitative assessment of the real option’s value. 3.Decision tree analysis. 4.Standard model for a corresponding financial option. 5.Financial engineering techniques. 28

 Initial cost = $70 million, Cost of Capital = 10%, risk-free rate = 6%, cash flows occur for 3 years. Annual Demand Probability Cash Flow High30%$45 Average40%$30 Low30%$15 29

E(CF)=.3($45)+.4($30)+.3($15) = $30 PV of expected CFs = ($30/1.1) + ($30/1.1 2 ) + ($30/1.1 3 ) = $74.61 million Expected NPV = $ $70 = $4.61 million 30

 If we immediately proceed with the project, its expected NPV is $4.61 million.  However, the project is very risky: ◦ If demand is high, NPV = $41.91 million. ◦ If demand is low, NPV = -$32.70 million. 31

If we wait one year, we will gain additional information regarding demand. If demand is low, we won’t implement project. If we wait, the up-front cost and cash flows will stay the same, except they will be shifted ahead by a year. 32

 The value of any real option increases if: ◦ the underlying project is very risky ◦ there is a long time before you must exercise the option  This project is risky and has one year before we must decide, so the option to wait is probably valuable. 33

Cost 0Prob Scenario a -$70$45 30% $040%-$70$30 30% $0 Future Cash Flows Discount the cost of the project at the risk-free rate, since the cost is known. Discount the operating cash flows at the cost of capital. Example: $35.70 = -$70/ $45/ $45/ $45/

 E(NPV) = [0.3($35.70)]+[0.4($1.79)] + [0.3 ($0)]  E(NPV) = $

 Decision tree NPV is higher ($11.42 million vs. $4.61).  In other words, the option to wait is worth $11.42 million. If we implement project today, we gain $4.61 million but lose the option worth $11.42 million.  Therefore, we should wait and decide next year whether to implement project, based on demand. 36