New Ideas for Super B Factories for Flavour Physics Steve Playfer University of Edinburgh, Future Directions, BEACH 2006 Lancaster, July 2006.

Slides:



Advertisements
Similar presentations
The ILC low power option Andrei Seryi SLAC ILC08 and LCWS08 November 17, 2008 Photo: Dan Chusid, 2003.
Advertisements

Crab crossing and crab waist at super KEKB K. Ohmi (KEK) Super B workshop at SLAC 15-17, June 2006 Thanks, M. Biagini, Y. Funakoshi, Y. Ohnishi, K.Oide,
1 Possibilities of ILC parameters optimization with crossing angle SLAC, June 27, 2006 P. Raimondi, M.Pivi, A.Seryi.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
Linear Super-B Factory Progress John T. Seeman FPCP Workshop Vancouver BC April 9, 2006.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
10 36 ??? 20 Apr K. Oide Super B Workshop.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
Issues for Optimization of a Super-B Factory John T. Seeman SBF Workshop SLAC June 14, 2006.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
Beam-beam simulations M.E. Biagini, K. Ohmi, E. Paoloni, P. Raimondi, D. Shatilov, M. Zobov INFN Frascati, KEK, INFN Pisa, SLAC, BINP April 26th, 2006.
3 rd workshop on SuperB 06.14,2006 SLAC Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Overview and goals 3rd Workshop on SuperB.
Is there synergy between ILC and SuperB? Steve Playfer University of Edinburgh.
Beam-Beam Optimization for Fcc-ee at High Energies (120, 175 GeV) at High Energies (120, 175 GeV) Dmitry Shatilov BINP, Novosibirsk 11 December 2014, CERN.
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
Welcome to the 1 st Open Meeting of the Super KEKB Collaboration. (T. Browder, University of Hawaii) [All talks and discussions about the detector, physics.
Future Accelerators at the High Energy Frontier
Status on SuperB effort Frascati, March 16, 2006 P. Raimondi.
SuperB Design Progress Paris, Jan 27, 2007 P. Raimondi for the SuperB Team.
New Ideas for a Super B Factory Steve Playfer University of Edinburgh ILC Forum, Cosener’s House, May 2006.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Status on SuperB effort Daresbury, April 26, 2006 P. Raimondi.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
SuperB Lattice Studies M. Biagini LNF-INFN ILCDR07 Workshop, LNF-Frascati Mar. 5-7, 2007.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
2 nd workshop on SuperB 16.03,2006 LNF Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Status of the art 2nd Workshop on SuperB.
2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Closeout Remarks 2nd Workshop on SuperB FRASCATI.
A.Variola B. What is the ‘crab waist’ scheme? And why does it make a high luminosity factory possible? Machine parameters ILC & SuperB.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
EPS Krakow July 16-22, 2009 B-factory developments 1 e+e- Factory Developments M. Sullivan EPS 2009 Krakow, Poland July 16-22, 2009.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Collision with a crossing angle Large Piwinski angle
Positron Sources of Next generation B-factories (SuperKEKB, SuperB)
Design and Parameters for a linearly colliding Super B-FACTORY
Update on B and Phi Factories
SuperB Injection, RF stations, Vibration and Operations
Linac possibilities for a Super-B
BINP Tau-Charm Project
Overview of SRF system of Ring and Linac (1)
Super-B Overview John Seeman Accelerator Systems Division
Accelerator Systems Division
Beam beam simulations with disruption (work in progress...)
SuperB Accelerator Overview and Status
Interaction Region Design Options e+e- Factories Workshop
SuperB CDR Machine P. Raimondi for the SuperB Team Paris, May 9, 2007.
Beam-beam simulations with crossing anlge + crab-waist
Accelerator R&D Results from the B-factory
AC Power for a Super-B Factory
Summary of Washington DOE Review
Super-B Accelerator Overview
SuperKEKB Proto-collaboration
SuperB IRC Meeting Frascati, Nov. 13th 2007
Super-B Factory in a “4400m” Tunnel
Cost Algorithm for a Super-B Factory
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Beam-beam simulations
Presentation transcript:

New Ideas for Super B Factories for Flavour Physics Steve Playfer University of Edinburgh, Future Directions, BEACH 2006 Lancaster, July 2006

Linear Collider ideas for a Super B factory “An electron-positron linear collider as a B-anti B Meson factory” (Amaldi & Coignet 1986) Idea resurrected at Hawaii Super B workshop (Pantaleo Raimondi, April 2005) “Super B: a linear high luminosity B factory” (J.Albert et al, hep-physics/ ) Benefits from all the Linear Collider R&D that has been going on in the last 20 years. Looks feasible to get luminosity of 1-2 x at Y(4S)

Series of recent workshops Hawaii (April 2005) – Frascati (November 2005, March 2006 and November 2006) – CERN Flavour in the LHC era (November 2005, February 2006, May 2006 …) –mlm.home.cern.ch/mlm/FlavLHC.html SLAC (June 2006) –www-conf.slac.stanford.edu/superb/Default.html KEK (September 2006)

The Basic Ideas Use the ILC damping ring design for the e+/e- storage rings Use the ILC final focus design to collide very small beams at high luminosity Do all this asymmetrically (7x4GeV) on the Y(4S) resonance Options include: –Bunch compression –Linacs for acceleration after the damping rings –Crossing angles –Crab cavities –Travelling waist

First Linear Super B scheme with single pass collisions (Frascati, November 2005) e- Gun 2GeV e+ DR IP 5GeV e+ SC Linac e- Dump 7GeV e+ 4 GeV e- 4GeV e- SC Linac 2 GeV e+ injection Use Superconducting Linacs to recover energy Use low energy damping rings to reduce synchrotron radiation –Maybe no e - damping ring Use bunch compression and final focus a la ILC Polarized beams possible ~1GW Power consumption! Damp bunches for ~10ms Extract and collide after ~1000 turns and then recycle. Very low backgrounds in detector! Energy & asymmetry tunable

Scaling laws to optimize the single pass IP parameters Disruption: Luminosity  Decrease  z + decrease N Increase spotsize Increase N Decrease spotsize Increase  z + decrease N Increase spotsize Contradicting requests! Nominal design has 6000 Bunches each with N~10 11 particles

Linear-B scheme IP LER Bunch compressor and FF HER Bunch compressor and FF LER HER Overall ring length 6Km Collision frequency about 120Hz*10000bunch_trains=1.200MHz Bunch train stays in the rings for 8.3msec, then is extracted, compressed and focused. After the collision the bunch is reinjected in its ring LER injection HER injection

Compressor Decompressor Compressor DeCompressor IP Optional Acceleration and deceleration Optional Acceleration and deceleration FF ILC damping rings ILC final focus ILC bunch compressor Colliding every turn Acceleration optional Crossing angle optional Second ILC-based Super B scheme (Frascati, March 2006) ~50MW Power Consumption Uses bunch compression/ decompression Bunches collide every turn

Super B with Large Crossing Angle  Crossing angle of 2x25 mrad  Only a small longitudinal part of each bunch collides with a small part of the opposing bunch  Small beam-beam disruption  No need for strong damping ~32MW Power Consumption

Vertical waist has to be a function of x: Z=0 for particles at –  x Z=  x /  for particles at +  x Realized with a sextupole in phase with the IP in X and at  /2 in Y 2Sz 2Sx  z x 2Sx/  2Sz*  e- e+ YY Crabbed waist removes beam-beam betratron coupling introduced by the crossing angle

Superconducting Final Focus Quads are shared There is a 25mrad Crossing Angle

Parameters of Super-B Designs Collider yy N y*y* sEFLumin Units10 mmmGeV(~Hd)10 35 PEP-IINormal KEKBNormal Super- PEP-II High I low  y Super- KEKB High I low  y Linear SuperB Single pass SuperB Bunch shorten SuperB X’ing angle John Seeman, FPCP 2006

Detector requirements Beam currents are similar to those in PEP-II Luminosity related backgrounds are a worry (Bhabhas) Possible to reduce beam pipe radius to mm and improve vertexing Change forward/backward regions to improve acceptance (Particle ID, Calorimetry) Most of the existing BaBar and Belle detectors could be reused!

Status of SuperB Studies Damping Ring design a la ILC is well advanced (Biagini, Wolski) Travelling final focus scheme is likely to be tested in 2007 (Raimondi) Beam-beam simulations are in progress in several places (Koop, Ohmi…) Interaction region design (Sullivan) Detector issues (Forti, Hitlin, Roodman…)

Collaboration on design issues (particularily for the damping rings) Possible use of SuperB as a development facility for ILC damping rings Decrease in ILC commissioning time Increase in Super B and ILC performance during operations through machine development and exchange of information SuperB-ILC synergy Not clear if SuperB comes before ILC or at about the same time …

Needs a ring of 2.2 to 6km circumference –Frascati is interested, but would need to dig a new tunnel which is expensive –There are several existing tunnels of the right size: KEK, PEP, HERA, Tevatron …some of which may be unused soon… For the very small beams at the final focus site stability is likely to be an issue (as it is for the ILC) A very preliminary cost estimate for the crossing angle version is $500M (+$200M if a new tunnel is required) Comments on Site and Cost

Backup Slides

LHCb 2/fb vs Super B 50/ab (Jim Libby - LHCb) LHCb does CP violation in B s decays Both can do the angles  and the rare decay b  sll SuperB does V ub and rare decays with  and  photons Complementary to each other!

SuperKEKB vs ILCSuperB Luminosity 4-8x10 35 (Oide, CERN) Currents 4.1/9.4A Higher backgrounds Power 73MW Technology mostly well understood Could be built today Luminosity 1-2x10 36 (Raimondi, CERN) Currents 1.6A Lower backgrounds Power 34MW Technology being developed for ILC Could be built in a few years time