“Project Management Office” «Building Climate Resilience in the Pyanj River Basin Project» К arimov N.G PMO Director К arimov N.G PMO Director 24.08.2015.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Investing in the Cascading Forecasting Process in Modernizing National Meteorological and Hydrological Services WB & WMO.
Statutory Drivers for Adaptation Explaining and reinforcing the statutory duties on Local Planning Authorities to address climate change adaptation in.
Enable Procurement Agencies to Fulfill their Roles Push Smooth Implementation of Project Procurement Foreign Debts Management Center, Hebei Provincial.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
Titlul proiectului subtitlu EU Financing in Environmental Sector during Raluca FRATILA Ministry of Environment and Forests, Managing Authority.
National Disaster Risk Management Program NDRMP Belgrade, March
Risk Reduction of Mining Accidents in the Tisa Basin Adriana Eftimie – Director PIU National Agency for Mineral Resources NATO/CCMS Pilot Study “Prevention.
Washington Metropolitan Area District Office SBA.
1 September 2007 Assisting NAPA implementation: focus on early warning systems UN International Strategy for Disaster Reduction (UN/ISDR) Silvia Llosa.
GLOBAL LESSONS: DESIGNING CDD OPERATIONS Samantha de Silva HDNSP April 2005.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY 9th Public Procurement Knowledge Exchange Platform May, 28-31, 2013 Skopje
U.S. Small Business Administration
GAFSP in the Kyrgyz Republic The Union of Water Users Associations of Kyrgyzstan Bali, May 2014.
COHESION FUND MONITORING COMMITTEE 11 April 2008 Jurijs Spiridonovs Ministry of Environment Head of Project Development Department.
Public Procurement Exchange Platform Efficient implementation of Procurement - Centralized Purchasing Mr. Safet Hoxha, President of PPRC Mr. Ilaz Duli,
1 SOMATHILAKA KINDELPITIYA COMMUNITY DEVELOPMENT AND TRAINING SPECIALIST SOMATHILAKA KINDELPITIYA COMMUNITY DEVELOPMENT AND TRAINING SPECIALIST.
The Gambia: Low-Carbon high resilience infrastructure for sustainable development Ms. Fatou Ndey Gaye Minister of Forestry and the Environment,
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
State Hydrometeorology Institute 6-7 March Dushanbe 6-7 March Dushanbe Project «Modernisation of weather, climate and hydrological service.
FINAL FORUM of the Project „through pREvention to Preserve the natural beauty Of the Rhodope mounTain” REPORT Smolyan, ΕΛΛΗΝΙΚΗ ΔΗΜΟΚΡΑΤΙΑ ΠΕΡΙΦΕΡΕΙΑ.
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 11 th Public Procurement Knowledge Exchange Forum “Procurement.
1 «Public Procurement System of the Republic of Azerbaijan» Elshad Samedzade PhD Web-site:
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
1 World Bank Investments in Uzbekistan Tashkent August 17, 2012 Takuya Kamata Country Manager for Uzbekistan The World Bank.
14/10/2015European Agency for Reconstruction1 Water & environment.
Promoting CARICOM/CARIFORUM Food Security (Project GTFS/RLA/141/ITA) (FAO Trust Fund for Food Security and Food Safety – Government of Italy Contribution)
Sierra Leone NAPA Implementation: Incrementality of Adaptation Presented by N. Telahigue CLIMTRAIN 2 nd Workshop IFAD, Rome 20 Nov 2008.
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 9 th Public Procurement Exchange Platform “Efficient Implementation.
Enver AKSOY, MSc Head of Strategy Development Board of MoFAL Policy approaches of Ministry of Food, Agriculture and Livestock to pasture management in.
INTERNATIONAL LEADER PROJECTS IN LITHUANIA November 9, 2012 Ilona Sadovskaite Chief specialist of the Ministry of Agriculture.
Municipality of Lezhe MayorViktor TUSHAJ Area: 6.2 km2 Number of citizens in the municipality: Climate: Mediterranean type Road Network: Today the.
URBAN STREAM REHABILITATION. History of Urban River Development Rivers in the past… Present state… Desired state in the future…
PUBLIC PROCUREMENT SYSTEM IN TAJIKISTAN RAVSHAN KARIMOV AGENCY FOR PUBLIC PROCUREMENT UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
ADB TA 7599-TAJ Climate Resiliency for Natural Resources Investments Climate Risk Management in River Basins River basin approach to climate resiliency.
Public-Private Partnership Development Platform in Ukraine Non-governmental organization “Public-Private Partnership Development Platform” Київ
1 On-Farm Irrigation Project, Credit No KG On-Farm Irrigation Project, Credit No KG Presentation: On-Farm Irrigation Project Prepared by N.A.
City of Santa Rosa Hazard Mitigation Plan Project Kickoff.
By Rasa Snipiene, Director of PCU1 Education Improvement Project, Lithuania Management and Operation.
Kyrgyz Republic. WUA Forming Law of Water Users Unions (Associations) ( ). Standard constituent documents. Process of WUA forming Training of.
Solar PV Tender Overview Ministry of Livestock, Fisheries and Rural Development Department of Rural Development Place - Sule Shangri-La Hotel Date- 4 -
Immediate Threat and Danger Program Pam Truitt  September 10, 2015.
ADB TA 7599-TAJ Climate Resiliency for Natural Resources Investments Climate Change in Tajikistan: Existing Capacity to Cope Institutional Capacity Tajikistan’s.
Britannia Village Flood Control Project Report Back to RVCA Board of Directors – Dec 16, 2010 after attendance at Community Meeting of November 30, 2010.
INTER-AMERICAN DEVELOPMENT BANK Infrastructure and Environment Department (INE) Environment, Rural Development and Natural Disasters Division (RND) Agriculture,
Environmental Land Management and Rural Livelihoods Project (2013 – 2018) Project Overview Zafar Mahmudov, Project Coordinator.
September 11, 2012 Water Resources Statistics of the Republic of Kazakhstan A. Yepbayeva, Director of Production Statistics and Environment Department.
STRENGTHENING OF CLIMATE CHANGE EARLY WARNING SYSTEMS STATUS REPORT.
The Central purchasing in Bulgaria: Current status and prospective TAIEX Seminar 9-10 December 2015 Ivanina Beleva Director of the Central Purchasing Body.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Pacific Aviation Investment Program. US$125 m Adaptable Program Loan Phase 1 Phase 2, 3, 4 Objective: improve operational safety and oversight of international.
1 KENYA SPAIN MULTILATERAL PARTNERSHIP MEETING (08-11 December 2013) AfDB Kenya Water and Sanitation Portfolio.
Treasury of the Republic of Kazakhstan
A Presentation to the 2017 GEO Work Programme Symposium,
Japan-Caribbean Climate Change Partnership
On measures taken for management and efficient use of water resources in the Republic of Uzbekistan Kh. Ishanov - Chief specialist on water management.
Under 4.7 Habitat of the MTDS, Working Group 2 deals with:
SUE «Tochikobloikhakashi»
Deputy Minister of Nature Protection of the Republic of Armenia
Local Government Climate Change Support Program 2016
Local Government Climate Change Support Program 2016
Local Government Climate Change Support Program 2016
Local Government Climate Change Support Program 2016
Local Government Climate Change Support Program 2016
COHESION FUND MONITORING COMMITTEE
INDICATORS AND INDEXES OF ADAPTATION PROJECT WATER RESOURCES 21Ago2017
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
Washington State Infrastructure Financing
Cofindustria OVERVIEW OF THE WORLD BANK PROGRAM IN SERBIA
Scottish Government Responsible for environment & flooding issues
Presentation transcript:

“Project Management Office” «Building Climate Resilience in the Pyanj River Basin Project» К arimov N.G PMO Director К arimov N.G PMO Director Dushabe

 State Institution «Project Management Unit of «Building Climate Resilience in the Pyanj River Basin Project» was established by the Decree of the Government of the Republic of Tajikistan No 564 from  Date of signing of the Grant Agreement  Ratification of the Parliament of the Republic of Tajikistan , No 1407.

 The Agency for Land Reclamation and Irrigation (ALRI) under the Government of the Republic of Tajikistan is a Project Executing Agency (EA).  The project aims to increase resilience to climate vulnerability and change of communities in the Pyanj River Basin.  The project has four components:  The PMO of «Building Climate Resilience in the Pyanj River Basin Project» is responsible for realization of components 1 and 2.

 The total grant cost for components 1 and 2: is $  Government contribution for taxes and duties is: $  The project implementation period is 2013 to 31 December  The project completion date is 31 December  The project effects covers 18 jamoats 8 districts.

Component 1. Flood and Mud-Flow Protection. Flood protection infrastructure rehabilitated and climate-proofed in 10 jamoats, including river bank reinforcement for flood management and establish Disaster Risk Management Committees DRMC’s. Component 2. Irrigation. Rehabilitate and climate-proof irrigation systems in 8 jamoats, comprising rehabilitation of small scale irrigation infrastructure and capacity building of water user associations (WUA).

 Four project implementation offices (PIO’s) functioning: (Pyanj, Kulyab, Darvoz and Khorog).  Qualified specialists for PMO and the PIO’s has been selected on a competitive basis.  Project pilot rayons: Pyanj, Kulyab, Vose, Darvoz, Vanj, Rushan, Ishkoshim and Roshtkala of Pyanj river basin;

From the start date of project realization to  Project management office (PMO) and PIO’s started to work in a renovated office, purchased office equipment, furniture, connected local area network.  Purchased and provided vehicles for PMO and PIO’s. Purchased accounting software“1С”.

 To provide consulting services during implementation of the project it was prepared and signed the contract with international consulting company «EPTISA».  The International consulting company "Eptisa" following the PAM requirements on the selection of subcontractors, by the selection method has signed contract with local companies PO "Loihai ob" and NGO "Umedbakhsh" for the solution of institutional developments.

 It was conducted tender for purchase of heavy machinery by ICB method. The result submitted to ADB for receiving no objection for contract award.  Bid document package for construction works by ICB method for the pilot districts of Kulob and Vose prepared and submitted to ADB for receiving approval for issuing advertisement.

 Bank protection works in the lengthwise of the rivers Pyanj, Yakhsu and Kizylsu over the 8060 meters will protect more than 231 ha of irrigated lands from floods and erosion.  Restoration of stream beds of the Pyanj river sub-basins for a length of 5600 m.

 Rehabilitation of the building of pumping station and with installation of 4 new pump units.  Procurement of 9 pcs of heavy machinery for operation and maintenance of flood protection and irrigation infrastructure.

 Construction of Drip Irrigation system for 106 ha.  Rehabilitation of 6 pcs. of water distribution facilities.  By 2019, it will be reconstructed climate-proofed irrigation infrastructures in 18 jamoats 8 pilot areas of the Pyanj River Basin.  By 2019: Economic losses from climate-induced extreme events reduced by 20% compared to 2012.

 All of these objectives will be achieved as a result of the project implementation as follows:  Cleaning of irrigation and drainage system for a length of 24,000m, for melioration improvement of 480 ha and guarantee of water supply for irrigation of 1450 ha of arable lands

 The disaster risk management committees will be established (DRMC) and develop early warning communication system to assist communities in responding to floods.  The water user associations (WUA) will be established and will be trained in consultations on introduction of agriculture.

 After establishing of the Disaster Risk Management Committee (DRMC) and WUAs at least 30% of the members and office-holders are women.  At least 20% woman will be involved in the construction and rehabilitation works.  On the basis of the general environmental monitoring and management plan, (GEMMP), is developed a new environmental management plan and monitoring fo the pilot districts of Kulob, Vose and Pyanj and submitted to CC “EPTISA” for including in the bid documents.

 Heavy machinery for operation and maintenance of flood protection and irrigation assets.  Rehabilitation and climate-proof flood protection infrastructure in Vose and Kulob districts, including bank protection and stream bed works and also construction of spurs.  Rehabilitation and climate-proof irrigation infrastructure in Pyanj district, including cleaning of collector-drainage network and rehabilitation of pumping station.

 Rehabilitation and climate-proof irrigation and drainage infrastructure in Roshtkala, Iskoshim districts, including cleaning of collector-drainage network.  Supply and installation of equipment for drip irrigation in Pyanj district.  Rehabilitation and climate-proof flood protection infrastructure and irrigation system in Rushon, Darvoz, Vanj Districts.

734054, 5/1 Shamsi street, Dushanbe city. Tel/Fax: (992)