ATLAST-9.2: A Deployable Large Aperture UVOIR Space Telescope W. Oegerle 1, L. Feinberg 1, L. Purves 1, T. Hyde 1, H. Thronson 1, J. Townsend 1, M. Postman.

Slides:



Advertisements
Similar presentations
Observation of beam halo with corona graph
Advertisements

Israeli Universal Spacecraft Bus Characteristics and Design Trade-Offs
1 Ritva Keski-Kuha JWST Deputy OTE Manager May 19, 2009 JWST OTE Development Status JWST-PRES
Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,
Ultraviolet Telescopes James Green. The Modern Universe Space Telescope A Visions Mission Concept Study for A Large UV-Optical Space Telescope James Green.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
Low Energy, Low Cost Swift A design experiment June 2010.
Using DELPHI for Weak Lensing Measurements: Science Return and Mirror Size Jes Ford, JPL, UNR SURF /21/07 Mentor: Jason Rhodes Co-mentor: David Johnston.
VLBI: Visible Light Broadband Imager Instrument Conceptual Design Presentation Tom Berger Lockheed Martin Solar and Astrophysics Lab.
Gateway to Space AJ - 1 Mechanical System Design & the StarLight Project Andy Jarski Mechanical Systems Engineer Ball Aerospace & Technologies.
F444W F300M F277W F356W F480M F335M F360M F460M F410M F430M LWF1 LWF2 LWF3 LWF4 LWF5 LWF6 LWF7 LWF8 LWF9 LWF10 LWF11 LWF12 F322W2 LWF F250M Imaging pupil.
The background for this poster shows a life size drawing of one NIRCam module. The other side is a mirror image. The two modules are mounted back-to-back.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Constellation Orion Visible Light Constellation Orion Infrared Light.
James Webb Space Telescope and its Instruments George Rieke (MIRI Expert) & Marcia Rieke (NIRCam Expert) Steward Observatory, University of Arizona The.
Reading Unit 28, Unit 29, Unit 30 Will not be covered by the first exam.
James Webb Space Telescope and its Instruments John Stansberry Steward Observatory, University of Arizona The First Light in the Universe: Discovering.
4-meter Space Telescope Design Concepts for a UVOIR / ExoPlanet Mission Dr. Charles F. Lillie January 8, 2012 COPAG Community Meeting.
WFIRST Instrument reference information July 1, 2015.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Super Star Tracker.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
A SEMINAR ON HUBBLE SPACE TELESCOPE PRESENTED BY: HARI OM ELECTRONICS & COMMUNICATION REG NO SECTION-C ROLL NO.– 123.
Enabling Technology Development: High cadence imaging spectrograph development Low mass/power instrumentation Advanced communication/DSN for future deployment.
ReVeal Passive Illumination by Radar (PAIR). Overview Payload / Mission Communication Launch Orbit Power Thermal Attitude Propulsion Finance.
1 SAE Aerospace Control and Guidance Systems, 2006 Lake Tahoe, NV 1-3 March 2006 Tye Brady The Inertial Stellar Compass (ISC) Tye Brady.
Optical Design of Giant Telescopes for Space Jim Burge, Erin Sabatke Optical Sciences Center Roger Angel, Neville Woolf Steward Observatory University.
Lightweight Deployable UV/Visible/IR Telescopes Frank Peri, Jr. Earth Science Technology Office NASA Goddard Space Flight Center Michael Hagopian Earth.
Space-Qualified Hardware for the CALIPSO Lidar
Preliminary Design of NEA Detection Array Contractor 2 Kim Ellsworth Brigid Flood Nick Gawloski James Kim Lisa Malone Clay Matcek Brian Musslewhite Randall.
1 The slides in this collection are all related and should be useful in preparing a presentation on SIM PlanetQuest. Note, however, that there is some.
Optical principles of diffraction focussing, Preparing the way to space borne Fresnel imagers NiceSeptember 23-25, Laurent Koechlin Laboratoire.
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
Copyright 2007 Northrop Grumman Corporation 1 Large Deployed and Assembled Space Telescopes November 14, 2007 Ronald S Polidan Chief Architect, Civil Systems.
Modern Universe Space Telescope Visions 2003 Proposal Dennis Ebbets Ball Aerospace UV Optical Space Telescope Workshop STScI February 26, 2004.
Contractor 3. I. Launch III. Formation Alignment with Star Pictures Data downlink Stationkeeping II. Deployment IV. Deorbit.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
DRM1 design description SDT 5/17/12 1. WFIRST DRM candidate design summary At SDT6 2/2-3/2012 consensus for full-up mission, aka “DRM1” was: 1.3m aperture,
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
1 The slides in this collection are all related and should be useful in preparing a presentation on SIM PlanetQuest. Note, however, that there is some.
THE CRAO'S CONTRIBUTION FOR THE WSO / UV PROJECT N.V.STESHENKO.
Henry Heetderks Space Sciences Laboratory, UCB
1 JWST Functional Flow Diagrams and Schematic Block Diagrams.
Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Fourier-Kelvin.
Telescopes Lecture. Standards Understand how knowledge about the universe comes from evidence collected from advanced technology (e.g., telescopes, satellites,
WFIRST DRM2 candidate design – payload summary At SDT7 3/1-2/2012 consensus for concepts w/out overlap w/ other mission, aka “DRM2” was: 1.1m aperture,
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
Refraction P 7.2 LIGHT TELESCOPES AND IMAGES. You should understand that the wave speed will change if a wave moves from one medium into another a change.
ISWG - December 7, Destiny, The Dark Energy Space Telescope.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
Spacecraft Systems Henry Heetderks Space Sciences Laboratory, UCB.
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
V - 1 V. System Technology for Large Space Telescopes Session Chair: Juan A. Roman.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Ares V an Enabling Capability for Future Space Science Missions H. Philip Stahl, Ph.D. NASA MSFC.
Telescopes.
James Webb Space Telescope
Summary Single Object & Time Series Spectroscopy Jeff Valenti JWST Mission Scientist Space Telescope Science Institute.
First Assessments of EUVI Performance on STEREO SECCHI
Henry Heetderks Space Sciences Laboratory, UCB
Launch and On-orbit Checkout
Telescopes Chapter 3.
Main information on the «WORLD SPACE OBSERVATORY» project
THERMAL CONTROL SYSTEM
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

ATLAST-9.2: A Deployable Large Aperture UVOIR Space Telescope W. Oegerle 1, L. Feinberg 1, L. Purves 1, T. Hyde 1, H. Thronson 1, J. Townsend 1, M. Postman 2, M. Bolcar 1, J. Budinoff 1, B. Dean 1, M. Clampin 1, D. Ebbets 3, Q. Gong 1, T. Gull 1, J. Howard 1, A. Jones 1, R. Lyon 1, B. Pasquale 1, C. Perrygo 4, S. Smith 1, P. Thompson 1, B. Woodgate 1 and the ATLAST Concept Study Team ( 1 NASA/Goddard Space Flight Center, 2 Space Telescope Science Institute, 3 Ball Aerospace, 4 SGT/GSFC) The Optical Telescope Assembly (OTA) The OTA is a 9.2m segmented mirror consisting of 36 hexagonal Ultra-Low Expansion (ULE) glass mirrors. The mirrors are 1.315m in size (flat-to-flat) with areal density of ~20 kg/m 2. The architecture retains much of its heritage from JWST. The OTA is operated at room temperature and is thermally controlled using heaters on its backplane. Spacecraft & Servicing The spacecraft bus provides coarse attitude control, propulsion, power, communication (Ka band) and data handling modeled after JWST, but employs a modular architecture (shown below) that allows servicing and reduces risk during I&T. Each bay in the octagonal S/C bus is easily accessible and removable. Refueling of propellant tanks could also be done robotically during servicing to extend observatory life. All instruments are modular and replaceable on orbit using an HST-derived rail and kinematic latching systems. Modular spacecraft bus Sunshield and Stray Light A planar sunshield plus a central primary mirror baffle is sufficient to limit stray light to less than 10% of the zodiacal sky brightness while also eliminating “rogue path” light that would otherwise skirt around the secondary mirror. The deployed sunshield consists of four layers of opaque Kapton film with a simple flat square shape, 28 m on a side. To ease manufacture, integration and test (I&T), and stowage procedures, each of the four layers is subdivided into four quadrants that are connected during I&T so that each deployed layer is continuous. Four 18-meter booms extend in a cruciform configuration to deploy the membranes. Wavefront Sensing & Control (WFS&C) The core technologies for WFS&C are similar to those employed on JWST, but will run in real-time without ground intervention. A schematic of one of the combined Fine guidance sensor (FGS) and WFS sensors is shown in Figure 1. Light from the OTA is fed to the FGS/WFS via a pick-off mirror. A bi-directional fine steering mirror (FSM) is used to access a 4’x4’ FOV and steer an isolated star onto the FGS/WFS detectors. The beam is then split 3 ways, with 20% of the light going to the FGS for guidance, and 40% going to each of 2 WFS detectors. Each WFS beam path contains a dual filter wheel and imagining optics to form an image of Abstract We present the results of a study of a deployable version of the Advanced Technology Large Aperture Space Telescope (ATLAST) that could be launched on an Evolved Expendable Launch Vehicle (EELV). The observatory retains significant heritage from JWST, thereby taking advantage of technologies and engineering already developed for that mission. At the same time, we have identified several design changes to the JWST architecture, some of which are required due to the demanding wavefront quality required for diffraction limited imaging at 500 nm. Gimbaled mounting of OTA The OTA is mounted on a multi-gimbal arm that provides OTA pitch motion, roll about the OTA line of sight, and center of mass trim for solar torque control while allowing the spacecraft and sunshield attitude relative to the Sun to remain fixed. This enables a very large field of regard with allowed pointing from 45 to 180° from the sun, permitting the use of an external occulter (starshade) for high contrast imaging of exoplanets. An active isolation system between the arm and OTA isolates spacecraft disturbances and, using the FGS sensor, provides a total image motion (ie. jitter) of ~1 milli-arcsec. Launch Vehicle, Orbit ATLAST fits into a modest upgrade to the Delta IV Heavy, which will have a 6.5 m (outer diameter) fairing, and the ability to put 15,800-18,000 kg into SEL2 orbit (ref: The launch trajectory provides direct injection to a halo or Lissajou orbit with no eclipses by the Earth over ten years. Optical Design The optical design provides a Three Mirror Anastigmat (TMA) channel for wide FOV instruments and a Cassegrain channel that minimizes reflections in the UV contains coronagraphic instruments for observing exoplanets. The primary mirror is fast (f/1.25) to minimize length of the OTA. Primary and secondary mirrors are coated with Al+MgF 2 for UV response. All optics in the TMA channel and in the exoplanet instruments with > 500 nm are coated with protected silver. The design is diffraction-limited at = 500 nm over an 8 x 20 arcmin FOV. The wavefront error map for the TMA channel is shown below The FOV in the Cass channel is ~ 1 arcmin Cass focus (f/12.55) TMA focus (f/18) the star on the WFS detectors. The filter wheels are actuated to place a narrow band (Δλ/λ ≈ ) filter in each beam path, as well as a weak lens. One path will use a positive weak lens while the other uses a negative weak lens to produce two out-of-focus images of the star on either side of focus. The images are sent to an onboard processor where a phase retrieval algorithm is run and segment-motion commands are generated every 5-20 minutes to adjust the shape of each primary mirror segment. Data from 3 FGS/WFS sensors is used to make ~daily adjustments to the secondary mirror. Total wavefront error budget = 40 nm Allocation to wavefront sensing < 10 nm ATLAST-9.2 (folded) inside Delta IV Heavy fairing Deployment Sequence After fairing separation Deploy solar array and comm antenna Sunshield deployed (looking from sun side; S/C bus Visible) Gimbal arm unstowed and OTA deployed (dark side of sunshield) 18 m boom Four layer sunshield (corner) Drive with 4 cables Delta-IV Heavy with 6.5m diameter x 29.5 m payload fairing Deployed OTA Folded OTA rear view, showing instruments (colored boxes)