12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.

Slides:



Advertisements
Similar presentations
Topics to be Covered 1. Capacity Planning
Advertisements

Aggregate / Production Planning
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
IES 371 Engineering Management Chapter 14: Aggregate Planning
Chapter 12 Aggregate Planning.
Operations Management Aggregate Planning Chapter 13
Aggregate Planning 13 © 2011 Pearson Education, Inc. publishing as Prentice Hall.
PRODUCTION AND OPERATIONS MANAGEMENT
Operations Management
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Aggregate Planning Operations.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
Aggregate Planning. Overview Aggregate planning in the planning process Aggregate planning in the planning process Aggregate planning strategies Aggregate.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 14 Aggregate Sales and Operations Planning.
Utdallas.edu/~metin 1 Aggregate Planning Chapter 12.
Aggregate Planning and Master Scheduling
Aggregate Planning and Master Scheduling
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
Ardavan Asef-Vaziri Systems and Operations Management
Lesson 16 Aggregate Planning
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
CHAPTER 3 AGGREGATE PLANNING. LEARNING OBJECTIVES Define aggregate planning and how it is useful Identify optional strategies for developing an aggregate.
Aggregate Planning.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Operations Management Aggregate Planning
Aggregate Planning Chapter 11.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
Operations Fall 2015 Bruce Duggan Providence University College.
13 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 13 Aggregate Planning.
Aggregate Planning. Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 6 to 18 months. Short range Intermediate.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Aggregate Planning Intermediate-range capacity planning that typically covers a time horizon of 2~12 months – may extend to as much as 18 months. Product.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
13 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 13 Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
Sales and Operations Planning
Chapter 14 Aggregate Planning.
Aggregate Planning 2 2.
BUAD306 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
IOA- C th July.
13 Aggregate Planning.
Dr Sh Salleh bin Sh Ahmad
Production and Operations Management
Aggregate Production Planning (APP)
Presentation transcript:

12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition

12-2Aggregate Planning CHAPTER 12 Aggregate Planning McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.

12-3Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12 months. Short range Intermediate range Long range Now2 months1 Year

12-4Aggregate Planning  Short-range plans (Detailed plans)  Machine loading  Job assignments  Intermediate plans (General levels)  Employment  Output  Long-range plans  Long term capacity  Location / layout Overview of Planning Levels

12-5Aggregate Planning Planning Sequence Business Plan Establishes operations and capacity strategies Aggregate plan Establishes operations capacity Master schedule Establishes schedules for specific products Corporate strategies and policies Economic, competitive, and political conditions Aggregate demand forecasts Figure 12.1

12-6Aggregate Planning  Resources  Workforce  Facilities  Demand forecast  Policies  Subcontracting  Overtime  Inventory levels  Back orders  Costs  Inventory carrying  Back orders  Hiring/firing  Overtime  Inventory changes  subcontracting Aggregate Planning Inputs

12-7Aggregate Planning  Total cost of a plan  Projected levels of inventory  Inventory  Output  Employment  Subcontracting  Backordering Aggregate Planning Outputs

12-8Aggregate Planning Aggregate Planning Strategies  Proactive  Alter demand to match capacity  Reactive  Alter capacity to match demand  Mixed  Some of each

12-9Aggregate Planning  Pricing  Promotion  Back orders  New demand Demand Options

12-10Aggregate Planning  Hire and layoff workers  Overtime/slack time  Part-time workers  Inventories  Subcontracting Capacity Options

12-11Aggregate Planning Aggregate Planning Strategies  Maintain a level workforce  Maintain a steady output rate  Match demand period by period  Use a combination of decision variables

12-12Aggregate Planning Basic Strategies  Level capacity strategy:  Maintaining a steady rate of regular-time output while meeting variations in demand by a combination of options.  Chase demand strategy:  Matching capacity to demand; the planned output for a period is set at the expected demand for that period.

12-13Aggregate Planning Chase Approach  Advantages  Investment in inventory is low  Labor utilization in high  Disadvantages  The cost of adjusting output rates and/or workforce levels

12-14Aggregate Planning Level Approach  Advantages  Stable output rates and workforce  Disadvantages  Greater inventory costs  Increased overtime and idle time  Resource utilizations vary over time

12-15Aggregate Planning 1. Determine demand for each period 2. Determine capacities for each period 3. Identify policies that are pertinent 4. Determine units costs 5. Develop alternative plans and costs 6. Select the best plan that satisfies objectives. Otherwise return to step 5. Techniques for Aggregate Planning

12-16Aggregate Planning Cumulative Graph Cumulative production Cumulative demand Cumulative output/demand Figure 12.3

12-17Aggregate Planning Average Inventory Average inventory Beginning Inventory + Ending Inventory 2 =

12-18Aggregate Planning Mathematical Techniques Linear programming: Methods for obtaining optimal solutions to problems involving allocation of scarce resources in terms of cost minimization. Linear decision rule: Optimizing technique that seeks to minimize combined costs, using a set of cost-approximating functions to obtain a single quadratic equation.

12-19Aggregate Planning Summary of Planning Techniques Table 12.7

12-20Aggregate Planning  Services occur when they are rendered  Demand for service can be difficult to predict  Capacity availability can be difficult to predict  Labor flexibility can be an advantage in services Aggregate Planning in Services

12-21Aggregate Planning Aggregate Plan to Master Schedule Aggregate Planning Disaggregation Master Schedule Figure 12.4

12-22Aggregate Planning  Master schedule: The result of disaggregating an aggregate plan; shows quantity and timing of specific end items for a scheduled horizon.  Rough-cut capacity planning: Approximate balancing of capacity and demand to test the feasibility of a master schedule. Disaggregating the Aggregate Plan

12-23Aggregate Planning Master Scheduling  Master schedule  Determines quantities needed to meet demand  Interfaces with  Marketing  Capacity planning  Production planning  Distribution planning

12-24Aggregate Planning Master Scheduler  Evaluates impact of new orders  Provides delivery dates for orders  Deals with problems  Production delays  Revising master schedule  Insufficient capacity

12-25Aggregate Planning Master Scheduling Process Master Scheduling Beginning inventory Forecast Customer orders Inputs Outputs Projected inventory Master production schedule Uncommitted inventory Figure 12.6

12-26Aggregate Planning Projected On-hand Inventory Projected on-hand inventory Inventory from previous week Current week’s requirements - =

12-27Aggregate Planning Projected On-hand Inventory Beginning Inventory Customer orders are larger than forecast in week 1 Forecast is larger than Customer orders in week 2 Forecast is larger than Customer orders in week 3 Figure 12.8

12-28Aggregate Planning Time Fences in MPS Period “frozen” (firm or fixed) “slushy” somewhat firm “liquid” (open) Figure

12-29Aggregate Planning Solved Problems: Problem 1

12-30Aggregate Planning Flexibility Models LP4 Caterpillar

12-31Aggregate Planning Production Process/Steps PT2 Federal Signal